Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
256 results • Latest
Construction of a road from the SC colony of Mushigeri village in Gajendragad taluk to the cremation ground (Reserved for CAT-II(A)
Construction of CC road from main road of Mushigeri village in Gajendragad taluk to Chandappa Gowdas house and construction of CC road from Durgadevi temple to Gulaguli road (Reserved for CAT-II(A)
Construction of CC road from Mallappa Katagi house to Basavaraja Majjigudda house in Shirunja Village of Gadag taluk. Under 2025-26 5054-03-0-75-422/423 SC/ST YOJANE.
Construction of CC road from main road To Shantavva Madaras house Mushigeri village in Gajendragad taluk
Construction of a retaining wall for the stream on the Kothabal-Mugali road in Rona Taluk
Monthly Ambulance Service (All Inclusive) - All inclusive service; Type B Patient Transport Vehicle; Single Stretcher Regular Van; Maruti Suzuki Eeco Care
Monthly Ambulance Service (All Inclusive) - All inclusive service; Type B Patient Transport Vehicle; Single Stretcher Regular Van; Maruti Suzuki Eeco Care
Backing Angle or Angle spacer
Improvement of road from Kanavidari Iravi Halla to Yerehola in Chikkamannoor village of Rona Taluk Chikkamannoor Arahunasi internal road improvement in Rona taluk Improvement of Basalpur Hullur Road in Rona Taluk Improvement of Krishnapura-Nidagundi Road in Rona Taluk(Reserved for CATII(A)
PROVIDING GROUP D AND NON-CLINICAL STAFF THROUGH OUTSOURCE TO TALUK GENERAL HOSPITAL MUNDARAGI FOR THE YEAR 2026-27
Construction of Box culvert in Koujageri-Y.S.Hadagali-Yavagal MDR at 2.25 Km
Construction of Bridge Across Marakatti Nala Between Neeralagi Nagarala Village in Gadag Taluka.
Removal of Silt & Jungle clearance in from km 0.00 to km 63.88 of Huvina Hipparagi Branch Canal under MLIS - III for tank filling for the year 2026-27.
Removal of Silt & Jungle clearance from km 0.00 to km 56.00 of Tidagundi Branch Canal under MLIS -III for Tank Filling for the year 2026-27.
Removal of silt and jungle clearance of 0 to 8 KM L 17 and 0 to 6.20KM L 6 and Ch 0 to 6.40 KM R 4 in selected reaches Dy 11 of IBC .
Removal of silt and jungle clearance of 0 to 1.44 L-1, 0 to 1.19 L-2 in selected reaches Dy-12 of IBC
Improvements of Doni to Hirewaddatti village (Km 0.00 to 1.00 and 6.00 to 12.00) (Under 2025-26th CMIDP Grant) (Reserve Cat-2A)
Improvements of road Dambal village to D.S. Narayanapura village and Construction of CC road in bajar at Dambal village in Mundaragi taluk
Improvements of road from mundragi to tambragundi (Km 0.00 to 2.77) anda baradur to belagatti road (Km 0.00 to 2.67) (Under 2025-26th CMIDP Grant)
Road improvements from mallajja salagara hola to naramanda halla in jantli village, Mundaragi taluk from yaklasapur road in pethalur village to halahalla (Km 0.00 to 1.90), venkatapura hale dari road in pethalur village (Km 0.00 to 2.60) from ramenhalli cross to pethalur village to gudi hola (Km 0.00 to 2.50) and from baradur to tambragundi (Under 2025-26th CMIDP Grant)
Construction of a retaining wall for the government-owned Nagenahalla in Abbigere village, Rona taluk
Construction of C.C. Road in Kalliganur village IN Gajendragad taluk
Biomedical Waste Bags (Barcoded Bags) of Medium Size
Removal of silt and jungle clearance of 0 to 18.55 KM in selected reaches Dy-12 of IBC
Removal of silt and jungle clearance of ch 10 to 20 km of KBC in selected reaches
Providing Protection wall on SR & IP side from Ch.132.300 km to 132.700 km of ILC.
Repairs to chute at tail end reach of lat-2 of Dy-51 of ILC.
Construction of inlet of Lateral no.7 of IBC Dy.6 and Construction of Chute at chainage 0.00km to 0.35km of Lateral no.7 of IBC Dy-6
Repairs to CTC in Lateral no.6 of Dy.6 of IBC
Reconstruction of damaged CC lining, Pipe culvert and Drop in Sy No 55 of Balundagi Village comes under SL-5 of L-21 in Dy-11 of IBC.
Removal of silt and Jungle clearance at selected reaches of Dy-5 & Dy-5A of IBC and Jungle clerance near Aqueduct at Ch.30.00 & Ch.36.12km
Removal of silt and jungle clearance of 15 to 39 KM in selected reaches Dy-11 of IBC
Removal of silt and jungle clearance of 0.00 to 3.50 km of Dy-12A and ch 0.00 to 2.40 kmof Dy-12B in selected reaches of IBC
Removal of silt and jungle clearance of 0 to 19 KM Dy-14 of IBC in selected reaches
Repairs to CTC at 1.065 km of Dy-10 of IBC
Improvement to SR from 133.720 to 133.820km & 134.900 to 134.950km of ILC
Repairs to CTC at ch.0.100 km of Lat-4 of Dy-13 of IBC
Repairs to lining in lat-4 at selected Reaches in Dy-13 of IBC
Repairs to CTC at ch.0.450 km of lat-11A of Dy-13 of IBC.
Repairs to lining at selected reaches of Dy.5B of IBC
Repairs to damaged CC Lining from KM 16.00 to KM 17.00 of KBC
Repairs to lining and drops at ch13.20 to 13.40 of of Dy-14 of IBC
Removal of Silt and Jungle clearance at Selected Reaches from 0.00 to 3.640 km of sl 6 0.00 to 2.560 km of sl 7 0.00 to 1.380 km of sl 7A 0.00 to 2.540 km of SL-8 of of Lat 9A of Dy-13 of IBC. .
Removal of silt and Jungle clearance at selected reaches from 5.00 to 8.50 km of Dy-6 of IBC
Removal of silt and Jungle clearance at selected reaches of LR4, LR3 of Dy-5B & L1 of Dy-5A of IBC
Clearing of Jungle & removal of silt from Dy-8,9 &10 of IBC at Selected reaches for the year 2026-27
Clearing of Jungle & removal of silt from KBC 0.0 to 10.00km, ILC 131.00 to 135.00 & IBC 40.00 to 50.00 km at Selected reaches for the year 2026-27
Removal of Silt and Jungle clearance at Selected Reaches and from 0.00 to 15.100 Km of Lat-9A of Dy-13 of IBC .
Removal of Silt and Jungle clearance at Selected Reaches and from 0.00 to 31.600 Km ,of Dy-13 of IBC .
Removal of Silt and Jungle clearance from 20.00 to 25.00 Km of KBC and 0.00 to 2.00 km of Dy-50 of ILC .