Loading…
Loading…
136 results • Latest
Construction of 125 mm dia Machine Drilled hand Pump well near house of Nazir Ahmad Sheikh and others at Sheikhpora Tulail in district Bandipora.
Replacement of damaged 11 KV, 03 No CT PT in switchyard at USHP-I, Sumbal.
Installation of 73 Pre-cast RCC Boundary Pillars as per approved design along the Forest Demarcation line (Mainline B.Ps Only) as per the map in Forest Dara Ravi Part-II, Forest of Sindh Forest Division Ganderbal falling in Ganderbal District
Stage contract for Maintenance of 33/11 KV Receiving Stations for Sub Division Ganderbal only within the jurisdiction of STD Ganderbal for the Year 2026-27 OR till next Stage Contract is finalized.
Augmentation of Substations for Critically Overloaded Dts for Winter Preparedness of ED Ganderbal
Repairs to damaged Civil structures at Tail race including fencing for preventing trespassing.
Repair and Renovation of existing office floor at Powerhouse USHP-II Kangan
Repair and Renovation of sumbal link sub-divisional office and lodging at headwork sumbal including allied works