Loading…
Loading…
1,465 live1,037 closing this weekmost from Directorate of Local Bodies UP and Northern Railway
1,465 results • Latest
Work of interlocking tiles on the side tracks around the park in front of C-153, C-129 and C-136 in Ward-69, Lohia Nagar C-Block.
FILLING PLUG[ MCD] TO DRG. NO. ARDE 2122 DET NO. 10. ISSUE 1, DRG SEALED ON 10/11/2020
AutomationTestCategory_DoNotUse (Q3)
HYDROSTATIC TEST OF APU FIRE BOTTLE WITH SPARES
Work-64 Repair and painting of the boundary wall at the park opposite House No. 5-374, Kaveri Lane Vasundhara Zone, Ward 89.
Work-69 Repair work at Lavkush Park, A-Block, Sector 12, Pratap Vihar Vijaynagar Zone, Ward 4.
Work-63 Masonry and beautification work on the boundary wall at the park opposite House No. 983, Saraswati Kunj Society, Sector 1 Vasundhara Zone, Ward 54.
Work-67 Footpath repair and beautification work at Manohar Pal Singh Park, Mohan Meakin Society, Sector 5 Vasundhara Zone, Ward 54.
Work-70 Repair, painting, and footpath work at the park located at H-214, Sector 12 Vijaynagar Zone, Ward 15.
Work-65 Repair work on the boundary wall and footpath at Shiv Mandir Park Braj Vihar, Ward 68 opposite the temple in B-Block.
Work-68 Repair, painting, and footpath work on the boundary wall at the park opposite Shripal Mandir Ward 58, A-Block, Vijaynagar Zone, and beautification work at Shri Ram Park.
Work-62 Repair, painting, and beautification of the boundary wall at the park opposite House No. 1014, Chetak Block, Sector 3 Vasundhara Zone, Ward 54.
Work-66 Wall repair and beautification work at the park opposite House No. 1326, Mohan Meakin Society Sector 5 Vasundhara Zone, Ward 54.
Work-61 Repair and beautification work, including the boundary wall and Kheda Devta Temple, at Mata Wala Park in Bhauvapur village Vasundhara Zone, Ward 21.
GLOBAL REQUEST FOR INFORMATION Public Private Partnerships for Establishment of Manufacturing Plants and Operations
Emergency Procurement of HPV sampling and Diagnostic kits for Onward Supplies to Foreign Countries
Work-60 Wall repair and beautification work including grit-wash and grill installation for the park opposite House No. 15-1008, Ward 74, Vasundhara Zone.
Work-59 Installation of checker tiles in the park located opposite the Councilors residence in Ward 74, Vasundhara Zone.
Work-58 Beautification work in the Central Park of Shikhar Enclave, Sector 15, Ward 74, Vasundhara Zone, including raising the wall height, applying a grit-wash finish, and installing grills.
GREENING AND END TO END PAVING BY INTERLOCKIMG TILE FOR DUST MITIGATION AT SAUR URZA MARG AT I.A. SAHIBABAD SITE-IV DISTT- GHAZIABAD
Work-57 Demolition and reconstruction of a damaged park wall opposite House No. 15-265, Sector 15, Ward 74, Vasundhara Zone, including grit-wash plastering.
Work-56 Wall repair and painting work for Pink Park located in Sector 2B-3A, Vaishali.
Work-55 Park repair, footpath renovation, and painting work in Vrindavan Enclave, Sector 2B, Vasundhara Zone.
Work-54 Repair and beautification work of Peepal Wala Park opposite Bilad School, Sector 16, Ward 36, Vasundhara Zone.
Work-53 Construction of a footpath, wall repair, and painting work in the park opposite House Nos. 519 and 588, Sahyog Line, Sector 5, Ward 89, Vasundhara Zone.
Annual Rate Contract for Laying of 3LPE Steel Pipeline in Segment-2 - Ghaziabad and Gautam Buddha Nagar
GREENING AND END TO END PAVING BY INTERLOCKING TILE AT DIFFERENT ROADS and MAINTENANCE OF GREEN AREA / LAWN FOR ONE YEAR OF I.A. BULANDSHAHAR ROAD DISTT. GHAZIABAD
Construction work of Road, Sewer and Drainage in the remaining part of 45.00 meter wide road No. A-6 till Hum-Tum Road in Rajnagar Extension.
RESTORATION OF PWD ROAD FROM TEELA MODE TO BANTHLA FLY OVER DAMAGE DUE TO LAYING TRUNK SEWER IN INDRAPRASTH SCHEME.
Work-51 Repair of the park boundary wall, construction of a footpath, and painting work opposite House No. 10B-155 in Ward 61, Vasundhara Zone.
Work-52 Construction of a footpath, wall repair, and painting work in the park opposite House No. 842, Sector 2B, Ward 61, Vasundhara Zone.
REPAIRING, LAYING SLAB, FIXING MANHOLE COVER ON DAMAGED MANHOLES AND REPAIRING OF 10 HP SUBMERSIBLE AND COMBINF MOTOR PUMP IN POCKET-B, D, E AND F AT INDRAPRASTH SCHEME.
Development of Remaining Sewer Line, Water Line, Road and Drain in Pocket F Madhuban Bapudham Scheme Ghaziabad.
Substation Clamps/Connectors (Q3)
Vitreous China Sanitary Appliances–Squatting Pans conformingto IS2556 (Part3) (Q3)
HYDROSTATIC TEST OF ENGINE FIRE BOTTLE WITH SPARES
Work-50 Construction of the boundary wall and footpath, and beautification of the park Vasundhara Zone, Ward-61, Sector-2C, opposite House No. 268.
Work-49 Installation of grills, and repair and painting of the boundary wall at Chahal Park Vasundhara Zone, Ward-61, Sector-2B, opposite House No. 483.
Work-48 Work-41 Repair Great-Wash treatment and beautification of the boundary wall of Kalpana Park in Vaishali Vasundhara Zone, Ward-89, Sector-5, 26-GF.
Work-44 Construction of the boundary wall and beautification of the park in Braj Vihar Vasundhara Zone, Ward-68, opposite House No. C-536.
Work-46 Construction of a footpath and beautification work at Dinesh Ration Wala Park, located opposite B-361 in Brij Vihar Ward 68, Vasundhara Zone.