Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
597 results • Latest
Construction of New Building of 100 Secondary Schools under RIDF-XXXI (2025-26) for for Nogora under Khumtai and Sarupathar TBD ( Package-64)
Construction of New Building of 100 Secondary Schools under RIDF-XXXI (2025-26) for for Tengani Borhula Navajyoti High School under Khumtai and Sarupathar TBD ( Package-67)
Design, Engineering, manufacturing, procurement of materials and bought out components, assembly at shop, Inspection including inspection by TPIA, Testing at manufacturer works, packing, supply of PRESSURE RELIEF VALVES as per material requisition
Procurement of LPG Cu corrosion Bomb with consumables
Supply of Industrial Cleaning Machines
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Smart Video Surveillance Services with AI based Video Analytics for Construction Safety Management with Associated Services Related to NREP - Refer Tender document for details; Refer tender document;..
Supply and Construction of drinking water facility with canopy (Shed) at 9 no, of proposed locations of Dergaon Muncipal Board under 15th FC Tied Grant for the year 2020-21 (2nd Instalment) and 2021-22 Tied Grant (1st and 2nd Instalment)
Selection of Concessionaire for Design Build Construction cluster 10 KLD FSTP based on fully Mechanized MBBR Technology and Operation and Maintenance for 3 years at Dergaon Town Ward No 01 under 15th FC Tied grant 2nd Instalment for the FY 2020-21
SUPPLY OF CARBON STEEL FITTINGS-VII FOR NUMALIGARHREFINERY EXPANSION PROJECT
Facility Management Services - LumpSum Based - Industrial; Contract for Office Assistance at Siliguri Marketing Terminal; Consumables to be provided by buyer
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF INJECTION QUILL
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS- (4.205) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF FORGED FITTINGS asper MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS- (4.207) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS- (4.203) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF FORGED FITTINGS as per MR
A Group -M-PIPE-00247, A Group -M-PIPE-00248, A Group - M-PIPE-00319, A Group -M-PIPE-00884, A Group -M-PIPE- 00974, A Group -M-PIPE-00253, A Group -M-PIPE-00249, A Group -M-PIPE-00246, A Group -M-PIPE-00146, A Group -M- PIPE-00004, A Group -M-PIPE-00050, A Group -M-PIPE- 00768, A Group -M-PIPE-0934, A Group -M-PIPE-00170, A Group -M-PIPE-0950, A Group -M-PIPE-00084, A Group -M- PIPE-00736, A Group -M-PIPE-00318, A Group -M-PIPE- 00773, A Group -M-PIPE-00311, A Group -M-PIPE-00895, A Group -M-PIPE-00049, A Group -M-PIPE-00007, A Group -M- PIPE-0931, A Group -M-PIPE-00005, A Group -M-PIPE-00900, A Group -M-PIPE-00003, A Group -M-PIPE-00083, A Group -M-PIPE-00072, A Group -M-PIPE-00813, A Group -M-PIPE- 00245, A Group -M-PIPE-00118, A Group -M-PIPE-00916, A Group -M-PIPE-01001, A Group -M-PIPE-00124, A Group -M- PIPE-01000, A Group -M-PIPE-00310, A Group -M-PIPE- 00309, A Group -M-PIPE-00188, A Group -M-PIPE-00935, B Group -M-PIPE-00243, B Group -M-PIPE-00837, B Group -M- PIPE-0945, B Group -M-PIPE-00045, B Group -M-PIPE-0953, B Group -M-PIPE-00890, B Group -M-PIPE-00316, B Group -M-PIPE-00839, C Group -M-PIPE-00142, C Group -M-PIPE- 00788, C Group -M-PIPE-00993, C Group -M-PIPE-0929, C Group -M-PIPE-00994, C Group -M-PIPE-00995, C Group -M- PIPE-00167, C Group -M-PIPE-0949, C Group -M-PIPE-00306, C Group -M-PIPE-00263, C Group -M-PIPE-00320, C Group -M-PIPE-00239, C Group -M-PIPE-00307, C Group -M-PIPE- 0947, C Group -M-PIPE-00997, C Group -M-PIPE-00998, C Group -M-PIPE-00999, C Group -M-PIPE-00804, C Group -M- PIPE-00312, C Group -M-PIPE-00313, C Group -M-PIPE- 00225, C Group -M-PIPE-00314, C Group -M-PIPE-00302, C Group -M-PIPE-00949, C Group -M-PIPE-0951, C Group -M- PIPE-0952, C Group -M-PIPE-00202, C Group -M-PIPE-00942, C Group -M-PIPE-00984, C Group -M-PIPE-00996, C Group -M-PIPE-0930, C Group -M-PIPE-00222, C Group -M-PIPE- 00969, C Group -M-PIPE-0916, C Group -M-PIPE-00236, C Group -M-PIPE-00125, C Group -M-PIPE-0942, C Group -M- PIPE-00293
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF FORGED FITTINGS asper MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF MV CABLE (LOT 2) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF HV CABLE (LOT 2) as per MR
AMC for Insulation Jobs at Refinery and NRMT
SUPPLY OF ADAPTOR AND LAYOUT SPECIAL PARTS OF MSB PFCC(PFCC LPGTU PRU) GDS AND FF FOR NREP
Golaghat /15 Construction of Bridge in Golaghat District i) Br. No. 1/1 on Baliduar to Ubhota Chapori Road
Golaghat /14 Construction of Bridge in Golaghat District i) Br. No. 1/1 on Selek Goan to Dusutimukh
Golaghat /13 Construction of Bridge in Golaghat District i) Br. No. 7/1 on Ragdia to Rangagoragrant via Missimiati
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF FORGED FITTINGS as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF CABLE TRAYS as per MR
Supply of IR window, Installation, Testing and Commissioning with tool
Golaghat /17 Construction of Bridge in Golaghat District i) Br. No. 3/1 on road from 2 no Bokuli Chapori to Kancha-chapori Via Devithan
Golaghat /16 Construction of Bridge in GolaghatDistrict i) Br. No. 1/1 on Julungabheti to Bortika via Missimiati Saguri
Golaghat/10 Construction of Bridge in Golaghat District i) Br No. 1/1 on E and Dyke to Kameri Gaon Ali
ISA 75x75x6mm, IS-2062, E250BR, 6m length, ISA 90x90x10mm, Plate, 8mm thk., E250BR 6mx2m, 10mm thk., 12mm thk., 16mm thk., 20mm thk., E250BR 3mx2m, Channel, ISMC-150, Flats 50x6
Hiring of Consultants - Milestone/Deliverable Based - Comprehensive revision of NRLs Manuals for Procurement and Associated Documents; As per RFP; No; Hybrid(As specified in scope of work)
Nonasbestosblanket (Q3)
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF CHAIN PULLEY BLOCKS as per material requisition
Anti-Erosion measures at Mithaamchapori area on the left bank of River Dhansiri.
Construction of embankment from Abhongpathar to Shyam Gaon on the left bank of river Doyang.
M and R to Construction of embankment along L/B of river Dhansiri at Lurukihat and Mitham Chapori for the year 2025-26.
Anti-erosion measures at Sesamukh area on the left bank of river Dhansiri.
Anti-erosion measures at Bogoriani area on the right bank of river Dhansiri.
Restoration of breach like damages at B/Dyke from KRF Boundary to Diffalupathar.
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF MULTI-TYPE FLOWMETERS as per material requisition
Construction of PEB Warehouse at Bonda, Narengi, Guwahati, Assam
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS - (4.196) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS- (4.201) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF AS PIPES (MTO-05) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF GASKET (METALLIC AND SOFT IRON) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF GASKET (NON-ASBESTOS) as per MR
Design, Engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS- (4.194) as per MR
Design, engineering, procurement, fabrication, inspection, testing, transportation, and SUPPLY OF WROUGHT FITTINGS- (4.195) as per MR