Loading…
Loading…
456 results • Latest
Design and Construction of 400 MLD Main Pumping Station MPS and 100 MLD STP along with Power Generation and OandM for 10 years after completion of 1 year Defect Liability Period at Behrampur Gurugram and all other works contingent thereto
Out sourcing of Electrical maintenance activities i.e. TRD and General Electric and breakdown activities in Patli yard (including) Manesar- MSIL (Including MSIL Yard) connectivity line for three years (36 Months) in state of Haryana
Development, Upgradation and Maintenance of Green Areas along the Master Road dividing Sectors 47/49 and 47/50 Gurugram, including a construction period of 06 months and maintenance for a period of 36 month
Development, Upgradation and Maintenance of Green Areas along the Master Road dividing Sectors 44/52, 45/52 and 46/51 Gurugram, including a construction period of 06 months and maintenance for a period of 36 months.
Development, Upgradation, and Maintenance of Green Areas along the Master Road Dividing Sectors 43/53 and 43/52A, Gurugram, including a construction period of 06 months and maintenance for a period of 03 (Three) years
Strengthening / Rehabilitation of existing master sewer line of size 1600mm
PROVN OF 358 ANTI CLIMB WELDED MESH FENCING WITH ONE LAYER OF CONCERTINA COIL AT 2003 STN UNDER GE (AF) GURGAON
EXPRESSION OF INTEREST FOR ENLISTMENT OF HEATER TREATER (EIL-ENGINEERED) (ITEM CATEGORY-12LS) PACKAGE VENDOR