Loading…
Loading…
3,368 results • Latest
NDT Testing such as Radiography, Fibroscopy, Thickness Measurement, DPT/LPI, PAUT of Joints, Stress Relieving, Oxide Layer Measurement and Corrosion Mapping Survey etc. of Boiler Tubes during forthcoming overhauling of Unit 2 of 2x600 MW, RGTPP
Cleaning of Condenser Tubes by Bullet Shot Method along with Hydrojet of 600MW Unit-II RGTPP Khedar Hisar during its forthcoming overhauling FY 2025-26
Hiring of tractor burma 8 12inch vertical pump with diesel and operator including suction pump and other accessorizes at Main water Works Sector 14P Hisar
Hiring of tractor burma 8 12inch vertical pump with diesel and operator including suction pump and other accessorizes at Main Water Works Sector 14P Hisar and all other works contingent thereto
Providing and fixing control panel of 120 hp motor 440 volt 50 hz SEC 14P HISAR
Battery, Battery Cover, Battery Cap, Battery box, Battery Mount