Loading…
Loading…
14,382 results • Latest
Execution of various minor works related to repair and renovation at AJCBIBG, BSI, Howrah for the F.Y. 2026-27. SH: 1. Repair and renovation of cactus house both surrounding path and roof at AJCBIBG, BSI, Howrah. SH: 2. Construction of the shed of stage near phoolbagan at AJCBIBG, BSI, Howrah. SH: 3. Renovation of new guest house toilet and inside repair at AJCBIBG, BSI, Howrah. SH: 4. Construction of new washroom near parking gate with at least three urinals attached ladies and gents will all modern facilities at AJCBIBG, BSI, Howrah. SH: 5. Repairing and painting Banyan tree fence and KYD monument at AJCBIBG, BSI, Howrah. SH: 6. Security room toilet renovation at AJCBIBG, BSI, Howrah.
Balla Pilling at dighir par
Refer to tender docs
Annual Maintenance of Data,Voice, CCTV Surveillance System, LAN Networking EPBAX system and switches installed at The MPI and G Cell, Honble Chief Minister Office at Upanna, 325, Sarat Chatterjee Road, Shibpur, Howrah- 711102 for 01(One) Year
CONSTRUCTION OF ROAD FROM NAYANTARA HOUSE TO NACHAK PITCH RASTA AT CHAKKAMALA VILLAGE
CONSTRUCTION OF CONCRETE ROAD FROM CHITNAN KHEYA GHAT TO HATGACHA SALAMAT DOKAN
TAJPUR RATTALA VIA DOKANGORA VIA BALIKANA VIA KAJIPARA VIA MIR PARA
KARIA PWD ROAD TO ASHOK GUCHAYAT RESOIN SHOP VIA BANKURA PRASAD SAU HOUSE SITALCHAK LAL MOHAN HOUSE VIA SITALCHAK AMAL SAMANTA HOUSE VIA BANKURA HELTH CENTER GHORUI PARA
CONSTRUCTION OF CONCRETE ROAD FROM AJANGACHI KALLU TEA SHOP PURBAPARA MAJID TO DAKSHINPARA MAJID VIA BEG PARA VIA BABU PARA VIA PIR BAGAN
CHINGRAJOLE SAJAHAN BARI TO GHORDUBRA GABTALA TO DURGAPUR RADHAGOBINDA ROAD.
Clearing and removing of water hyacinth for the period of June 26 to November 26 of Nonakundu Khal, Gouriganga Khal and Kousiki River for a total length of 15.50 km in Block - Domjur and Jagatballavpur, P.S. - Domjur and Jagatballavpur, Howrah
KAMARGORIA KATARPOL TO SAURIA PAKA BRIZ VIA KAMARGORIA KALITALA
Clearing and removing of Water hyacinth of Moja Damodar Link Channel from Charaktala to Bali Bundh, Moja Damodar Link Channel from Military Bundh to Kalipada Bhandari Land, Moja Damodar Link Channel from Militarypota to Joypur Monosatola
Clearing and removing of Water hyacinth of Moja Damodar from Ranjoybar Rampur Khal to Kamarkhola total length of 9.60 km from june 2026 upto 30th November 2026 in Block- Amta-II, P.S- Joypur, Dist-Howrah.
Clearing and removing of water hyacinth for the period of June 26 to November 26 in between Harali Sluice (Outfall of Tuker Khal) to Dihibhursut of Tuker Khal for a length of 7.70 km in Block and P.S. - Udaynarayanpur, Howrah
CONSTRUCTION OF CONCRETE ROAD AT SOLBAYA LARAITALA TO BIPLOP DIJAR HOUSE
Clearing and removing of water hyacinth for the period of June 26 to November 26 in between Dihibhursut Offtake point to Ranjaybar R.C.C. Bridge of Maja Damodar River for a length of 24.10 km in Block - Udaynarayanpur and Amta - II
25KV OHE Modification work in connection with Extension of FOB at BWN station in Howrah Division of Eastern Railway.
Replacement of Large span jumpers / G Jumpers etc. in HWH Division.
Clearing and removing of water hyacinth for the period of June 26 to November 26 in between Purash to Madaria bridge of Madaria Khal for a length of 12.00 km in Block - Amta - I and Udaynarayanpur, P.S. - Amta and Penro, Dist. - Howrah.
Laying of supplementary Distribution pipe line as per revised design drawing and Reconnection of FHTC for Gobindapur PWSS at Jagatballavpur Block under Howrah Sadar Sub Division of Howrah Division, P.H.E. Dte.
Sinking of 3 (Three) nos Replacement Tube well (Size 250mm x 200mm dia) for Operation and Maintenance of Old Existing Mashila Water Supply Scheme Water Supply Scheme (Zone I II) under Howrah Sadar Sub-Division, under Howrah Division, P.H.E. Dte.
Clearing and removing of water hyacinth for the period of June 26 to November 26 in between Ranjoyber R.C.C. Bridge to Narit of Lower Rampur Khal for a length of 9.30 km in Block - Amta - II and P.S. - Joypur, Dist. - Howrah.
Sinking of Replacement Tube well (Size 250mm x 200mm dia) inside Domjur BDO office Campus for Operation Maintenance of Domjur (CT) Water Supply Scheme under Howrah Division, P.H.E. Dte.
Clearing and removing of water hyacinth of Sankhabhanga Khal, Kantakhali Khal, Lebutala Khal, Badarhana Khal, Amta Channel, Madhabpur Khal, Taltala Khal, Dhopakhali Canal, Ichapur Khal from June 2026 up to 30Th November 2026 in Block- Uluberia-I
Clearing and removing of water hyacinth of Mithakundu Khal, Old Damodar, Gholar Khal, Patkelghata Main Khal, Garchumukh Khal, Baitara Canal, Nonadangi Khal, Morshal Khal from June 2026 up to 30Th November 2026 in Block - Shyampur - I
CONSTRUCTION OF DRIAN FROM PRABIR RAM TO HARADHAN PRADHAN HOUSE 111922351
Sinking of 1 (One) No replaced T.well of size 250 X 150 mm Dia and 280 m deep, Drilling by Direct Rotary method with UPVC Pipes all complete at 3rd T.well Site of Maheswarpur PWSS at Shyampur-I Block of Howrah District under Howrah Division, P.H.E
Sinking of 1 (One) Nos. 250 X 150 mm Dia and 280 m deep tubewell Drilling by Direct Rotary method with UPVC Pipes all complete at Replace TW(HW Site) at Shyampur PWSS(Zone-II) at Shyampur-I Block of Howrah District under Howrah Division, P.H.E. Dte.
LIGHTNING PROTECTION BOARD (ZAG2Z), Part No. AP215633.
Sealing cap for centre pivot arrangement
Inj. Iohexol, 350 mg Iodine/ml, 100 ml Bottle.[AI(2026-27), Item Code-No: S-54027, SL no.248]
Supply and Installation of set of Lavatory Module for LHB
Isopropyl alcohol 70% v/v, Bottle of 450 ml minimum. (Should be usable as surface disinfectant as well as skin disinfectant).[AI(2026-27), Item Code-No: S-51119, SL no.94]
Syr Piracetam 500 mg/5ml -minimum 200 ml . [Product should be available in the Manufacturing firm's approved product list of Railway Board]Item Code No.: M110505 , AI 26-27
Budesonide 160 mcg + Glycopyrronium 7.2 mcg + Formoterol Fumarate Dehydrate 5 mcg
Road side jungle cutting, flank restoration work and patch repairing work at Narendrapur- Amta Road from 2.00 km to 3.00 km under Howrah Division, PWD during the year 2026-27
Rain damaged patch repairing work of Howrah - Amta Road from 45.00 km to 46.00 km at various stretches in the district of Howrah under Howrah Division, PWD during the year 2026-27.
Emergent repair of drains and other miscellaneous Sanitary and Plumbing works at MLCP and Nabanna Building at Mandirtal during the year 2026-27.
Emergent repairing of boundary wall ,reservoir supporting structure, Damaged KP police sentry posts and other ancillary works at Nabanna during the year 2026 27.
2. Up gradation of damaged road surface on Salkia Chanditala Road near Chamrail Co Operative Bank at Ch. 10.90 km during the year 2026-27.
1. Emergent restoration of carriageway edges on Belur Anandanagar Road from 2.45 km to 2.60 km during the year 2026-2027.