Loading…
Loading…
13,333 results • Latest
Improvement of road by Cement Concrete work (RMC M-30) at Balai Mistry Lane from 22 Pally club to 21/10 Balai Mistry Lane and 22/10/1 to 25/8 Balai Mistry Lane under ward no-38 HMC (L- 300.00m, Av.W- 3.6m)
Emergency patch repairing of Roads with allied works by Paver Block and Cement Concrete work at different spots of Shibpur Howrah Assembly under H.M.C ward no-8,9 and 21 to 23, 43, 47 to 50 (Area- 2797.50 m2 )
Facility Management Service - Outcome Based
Emergency restoration of road by Bituminous work at different spots of Surendra nath ganguly Road, Kashinath Chatterjee Lane, Abhinash Banerjee Lane, Belilious Road, Baksara Village Road, under ward no-17,19,20,21,22,23,33,41,44,45 HMC (Area- 1675.40
Emergency repairing and renovation of road by Cement Concrete work (RMC M-25) and paver Block to maintain pot-holes free roads at different spots of at Benaras Road, Aurobindo Road, Naskar Para Road, J.N. Mukherjee Road, Sri ram Dhang Road, Dr. Aban
Flood Precautionery Measures (F.P.M.) work of left embankment of Damodar river from Bagua Sitala Mandir to Rashpur including sluice sealing of Rashpur Dayar Monsatala on Damodar left Embankment, in Block - Amta - I, P.S. - Amta, Dist. - Howrah
Repairing and renovation of drain at 47, G. T. Road, under Ward No.-13 , APAS Fund Defect Liability Period 01 Year.
Construction And Renovation of of drain with cover slab from 56/21, RAM MOHAN MUKHERJEE LANE TO 56/9, RAM MOHAN MUKHERJEE LANE under ward no.-34, APAS Fund Defect Liability Period 01 Year.
Supply and Installation of LED Street light from 40 Abhoy Guha Road to End Place under APAS/01/169/151/0001
Supply and Installation of LED Street Light in front of LASCO Gate to ICE Cream Factory under APAS/01/169/55/0001
CONSTRUCTION OF GUARDWALL FROM SIRAJUL HOUSE TO SAIFUDDIN
Supply and installation of LED Street light from 1/1 Daspara Rickshaw stand to 24 Daspara road under APAS/01/169/124/0005
Renovation of control breaker switch gear of 3 nos. rotor stator. DLP- 1 Year.
Manufacturing and supply of new rotating assembly (impeller) with allied accessories including commissioning of one Jyoti make H.S. pump no. 08 at Clear Water Pumping Station at HWW Padmapukur.
Manufacturing and supply of new rotating assembly (impeller) and new pump shaft with allied accessories including commissioning of one Jyoti make H.S. pump no. 01 at Clear Water Pumping Station at HWW Padmapukur.
"Provision of passenger lifts connecting to FOB at ABKA, NDAE, KWAE, AZ & KGLE over Howrah Division".
Provision of passenger lifts at HWH, DKAE, TAK & SNT over Howrah Division".
Augmentation & Improvement of Electrical Substations, Switch Rooms with associated HT/LT switchgear panel, cables, Transformer, Earthing & other safety items under the jurisdiction of SSE/G/BDC.
Comprehensive Maintenance Contract of GM Passenger Lift ( Make - Thyssenkrupp ) located in GM Block at Head Quarter,Fairlie Place Kolkata for 60 Months.
Upgradation of Pit lights and yard lighting arrangements with associated wiring and cabling work at Tikiapara Coaching Yard and Sorting yard Coaching complex.
Upgradation of existing 750 Volt external power supply arrangement with associated power augmentation at Liluah Sorting yard Coaching complex for maintenance of LHB coaches in Washing / Sick lines.
Electrical (General) work in connection with "Construction of New LHS in lieu of LC Gate No. 18 by Railway's relieving girder under AEN/NDAE".
Electrical (General) work in connection with "Construction of New LHS in lieu of LC Gate No. 17/C/E in B.K section under AEN/KWAE".
Electrical (General) work in connection with "Construction of New LHS in lieu of LC Gate No. 12A by Railway's relieving girder under AEN/NDAE".
Electrical (General) work in connection with "Construction of New LHS in lieu of LC Gate No. 24A (T) by Railway's relieving girder under AEN/AZ".
Electrical (General) work in connection with "Construction of New LHS in lieu of LC Gate No. 12A/3 by Railway's relieving girder under AEN/NDAE".
Electrical (General) work in connection with "Construction of new LHS in lieu of LC Gate No. 17/A/6 by Railway's relieving girder under AEN/NDAE".
Electrical (General) work in connection with "Construction of new LHS in lieu of LC Gate No. 18/02 by Railway's relieving girder under AEN/NDAE".
Electrical (general) work in connection with "Replacement of Old & overage Panel Interlocking stations to EI at TIT Station".
Replacement of centre pivot assembly of WAP-4 Electric locomotives of ELS/SRC, South Eastern Railway.
Repair of 5400 KVA Transformer for Conventional electric locos.
One rake set of FS all steel lock nuts
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
Pre & Post tamping track measurement survey using Trimble gedo vorsys trolley system or similar and development of updated scale map under the jurisdiction of Sr.DEN/3/HWH under Howrah Division
CESS REPAIRING WORK under the jurisdiction of Sr.DEN/1/HWH in the following locations HWH - BLY CHORD: DN CHORD 9.470 - 10.000 = 668 CUM, UP CHORD 4.090 - 4.570 = 608 CUM, 5.100 - 5.980 = 1349 CUM, 7.000 - 8.000 = 1575 CUM, 9.000 - 10.000 = 1680 CUM. HWH - BLY DIESEL INCOMING LINE 0.750 - 1.150 = 635 CUM, DIESEL SHED ENGINE BAHAR LINE 0 - 0.488 = 956 CUM, DN 7.000 - 8.000 = 1610 CUM, RECEIVING LINE 10 - 0.784 = 1435 CUM, UP AVDG LINE 2.150 - 2.750 = 1377 CUM BLY-BOC: DN 10.000 - 14.000 = 4410 CUM, UP 10.000 - 12.000 = 2100 CUM, 16.000 - 19.000 = 4410 CUM. SHE - GOGT: DN 13.500 - 17.650 = 20750 CUM, 13.728 - 14.875 = 5162 CUM, SL 38.500 - 38.563 = 284 CUM, 39.033 - 41.366 = 10500 CUM, 41.895 - 47.514 = 20800 CUM, 48.150 - 48.324 = 783 CUM, 51.548 - 58.610 = 31780 CUM, 60.194 - 62.031 = 9100 CUM, 62.493 - 62.790 = 1470 CUM, 62.830 - 63.230 = 1980 CUM, 63.500 - 64.100 = 2970 CUM, 64.180 - 64,600 = 2079 CUM, 64.800 - 68.550 = 18560 CUM, UP 4.472 - 4.786 = 848 CUM, 13.500 - 17.650 = 20750 CUM. BDC-SKG: DN 56.000 - 58.000 = 9772 CUM, 67.500 - 69.000 = 7500 CUM, 73.000 - 73.800 = 4000 CUM, 79.320 - 80.690 = 6703 CUM, 82.530 - 84.370 = 8110 CUM, 84.780 - 87.000 = 11100 CUM, 88.795 - 90.800 = 9641CUM, UP 57.165 - 58.720 = 5738 CUM, 59.430 - 59.640 = 794 CUM, 61.635 - 62.550 = 3459 CUM, 73.160 - 74.210 = 3875 CUM, 82.790 - 83.265 = 1838 CUM, 88.160 - 88.530 = 1499 CUM
Maintenance and Operation of 3.5 MLD Effluent Treatment Plant (ETP) including discharge water filtration cum recycling plant of Tikiapara Depot of Howrah Division for a period of 3 years.
Vinyal coated upholstery (Orange & Grey)
Digital Photo Slit Lamp with Applanation Tonometer.
LUBRICANTS/COATING FOR FIAT BOGIES IN PACKING OF 5 LITRES
Improvement of drainage capacity of Baltikuri Khal I by re sectioning and lining works for a length of 1.40KM from Kona Railway Culvert to KWIC in Ward No. 50 of Howrah Municipal Corporation and Domjur Block P.S Dasnagar and Domjur District Howrah
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
REPAIRING WORK OF BANESWARPUR PRIMARY SCHOOL under Anulia Gram Panchayat under Amta-I Panchyat Samity, Amta, Howrah, under APAS FUND. APAS/01/182/253/0003
Construction of MS structural entrance gate work at Pilkhana under HMC.