Loading…
Loading…
2,486 results • Latest
Earth work excavation and concrete works for drain and culvert work, prime coat,tack coat, RCC 1 2 4 using 20mm broken stone ,20 mm Premixed chipping carpet
GENERAL-Premonsoon Work 2026-27- Various Bridges in Idukki Peerumedu LACGeneral Civil Work
GENERAL-Premonsoon Work 2026-27- Various Bridges in Thodupuzha LAC-General Civil Work
GENERAL-Premonsoon Works 2026-27- Various Bridges under this section in Udumbanchola constituency-General Civil Work
GENERAL-Premonsoon Works 2026-27- Various Bridges under this section in Devikulam LAC-General Civil Work
GENERAL- DAM SAFETEY-MVIP Emergency repair of hoisting mechanism of Radial Spillway shutter No.4 at Malankara Dam (Mechanical)-General Mechanical Work
GENERAL-Construction of a new bridge at Madakkathanam across Thodupuzha RiverInvestigation works for the construction of a new bridge at Madakkathanam across Thodupuzha river 3rd reach of Nellappara - Madakkathanam road in Thodupuzha LAC
GENERAL-Budget 2024-25 Improvements to Kalyanathandu New road in Kattappana Municipality-Improvements to Kalyanathandu New road in Kattappana Municipality-General Civil Work
GENERAL-Investigation works for the construction of Olamattom Bridge in Thodupuzha Constituency-Work-General Civil work
Remodelling of Division office by providing partitions and construction of Toilet
STANDARDISATION OF TRANSFORMER STRUCTURES (FENCING) AT VARIOUS LOCATIONS under ES Nedumkandam
SALE OF USED DG AND COMPRESSOR AT KINFRA PARK RAJAKUMARI
Entry and Mid Level Laptop - Notebook (Q2)
Valliyamkavu Devaswom Mundakkayam Group Constructing Nadapandal at East side and North side
Valliyamkavu Devaswom Mundakkayam Group Constructing Nadapandal at South side
Estimate for the cost of mechanical thinning operations of 2020 Teak plantation Bit II in Veloor in Veloor Station area of Thodupuzha Range during 2025-26
Estimate for the cost of mechanical thinning operations of 2020 Teak plantation Bit I in Veloor in Veloor Station area of Thodupuzha Range during 2025-26
Raising and Ist year maintenance of 2026 Teak plantation at Chatahanmala in Veloor Forest Station in Thodupuzha Range during 2026-27
Vellathooval GP Works Etticity Communitty hall maintenance
CHEMBALAM- KOZHIMALA- VATTAPPARA ROAD
Gully Plugging works (100 cum) in Eco restoration area of 2009 Bit II Teak Plantation under Veloor Forest station in Thodupuzha Range of Kothamangalam Division during 2025-26
Vellathooval GP works Pipe Line Anganvadi maintenance
Gully Plugging works (100 cum) in Eco restoration area of 2006 Teak Plantation in Veloor Forest station in Thodupuzha Range of Kothamangalam Division during 2025-26
Vellathooval GP works Anaviratty S Valavu Padasekaram Road maintenance
CONSTRUCTION OF AASSANPADI ANGANWADI
Vellathooval GP works Anachal Communitty hall maintenance
Gully Plugging works (100 cum) in Eco restoration area of 2009 Bit I Teak Plantation under Veloor Forest station in Thodupuzha Range of Kothamangalam Division during 2025-26
Vellathooval GP Works Anachal Tribal settlement Community hall maintenance
The estimate is prepared for carrying out urgent monsoon preparedness and emergency maintenance works in various roads under Roads Section Karimannoor. The work includes clearing grass and rubbish from road margins, filling potholes etc
SITC of Inverter in wards at CHC Kanjikkuzhy
PHC Pampadumpara Electrification of newly constructed Laundry block
Electrical renovation of Survey and Land Records Superintendent Office at Devikulam
Hiring Diesel Jeep above 1500CC with driver for the use of Electrical Section Alakode for a period of one year from 1.02.2025
Construction of toilet block for Pazhayaviduthi UPSchool in Rajakkad GPConstruction of toilet block for Pazhayaviduthi UPSchool in Rajakkad GP
The estimate is includes complete upgradation with GSB,WMM, BM BC layers, construction of CD structures, and protection works.n of CD structure
Reconductoring,Conversion and constructing LT Line with LT ABC,CC under Kanakakunnu DTR Under ES,Murikkassery.
The estimate covers all components required for complete and durable improvement of the road. .1 Road and Pavement Works This component includes excavation for widening, preparation of subgrade, providing and laying Granular Sub Base (GSB), Wet Mix M
Selection of Empanalled Agency for the forward linkage of NBDW from Thodupuzha Municipality
GENERAL-Urgent Monsoon works 2026 in various roads which are not included in RC under Roads section Pallivasal- Monsoon work -General Civil Work
GENERAL-Budget 25-26 ( Substitution)-Providing 20mm CC to Muniyra-Churuli-Mannakkudi road between ch.0/000 to ch.1/050 in Konnathady Grama Panchayath
Budget 2025-26 ( Substitution)-Construction of RW at ch.0/200(RHS) and Providing 40mm MSS to Kanjikkuzhi Kannadikavala Churulipathal road b/w ch.0/000 to 1/150
MLA-SDF-Edavetty GP- MLA SDFVattamattam Kunjanparambilppadi road construction-ROAD CONCRETING-General Civil Work
Budget 25-26 (20 percent) Providing 20mm MSS to Thellithodu Kurishukuthi Injathotti road between ch 0/000 to ch 2/900 work
Edavetty GP- MLA ADSThondikkuzha Nadayam road in ward 03-Road maintenance- Re Tender
Edavetty GP-MLA ADSMarthoma mettal crusher road in ward-11-Road maintenance-General Civil Work Re Tender
CONSTRUCTION OF KITCHEN FOR ANTI-POACHING CAMP SHED POTHENCHENY AT MULLARINGAD RANGE DURING 2018-2019
Annual Plan-CHINNAKANAL GP 2026-27 LOWER SURIANELLI UPPER BHAGAM ROAD MAINTENANCE-PRO NO 63-General Civil Work
MLA-SDF 2025-26 IMPROVEMENTS TO VETTIMATTOM ENNAPANATHOTTAM VATTOLIL BHAGAM ROAD IN VELLIYAMATTOM G.P.
GENERAL-Budget-2024-25-(20per cent) Improvements to Pullukandam quarry road between ch.0/000 to ch.0/500-Work-General Civil Work