Loading…
Loading…
529 results • Latest
CONSTRUCTION OF BURNING GHAT WITH WAITING SHED AT PASCHIM DHAMNTALA BESIDE MAHANANDA RIVER UNDER FULBARI-II GRAM PANCHAYAT WITH IN RAJGANJ BLOCK, DIST-JALPAIGURI , FUND-OWN FUND (SL. No.-07)
Earthwork in excavation of foundation trenches or drains in all sorts of soil including removing, spreading or stacking the spoils within a lead of 75m as directed including trimming the sides or trenches, leveling, dressing and ramming the bottom, bailing out water etc, as required complete.
Construction of CC Road from Ashian Highway to MaldaahBusty Road opposite Police Battalian under Fulbari-ii Gram Panchayat with in Rajganj Block, Dist Jalpaiguri. FUND OWN SOURCE (Sl No-06)
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
CONSTRUCTION OF ROAD FROM ASHIAN HIGHWAY TO JIBAN GARRAGE HOUSE UNDER FULBARI-II GRAM PANCHAYAT,FUND- OWN SOURCE (SL. No.-05)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
CONSTRUCTION OF ROAD FROM ASHIAN HIGHWAY TO PHE TAP OPPOSITE SIDE OF BATTELION MORE UNDER FULBARI-II GRAM PANCHAYAT,FUND- OWN SOURCE (SL. No.-04)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
CONSTRUCTION OF ROAD FROM ASHIAN HIGHWAY TO BABLU ROY TEA SHOP BESIDE THALAMUS NURSING HOME UNDER FULBARI-II GRAM PANCHAYAT,FUND- OWN SOURCE (SL. No.-03)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
CONSTRUCTION OF ROAD FROM ASHIAN HIGHWAY TO AMAD ALI HOUSE AT MURDER MORE UNDER FULBARI-II GRAM PANCHAYAT,FUND- OWN SOURCE (SL. No.-02)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.