Loading…
Loading…
4,801 results • Latest
Jaldhaka - Ranirhat Road from 0.00 kmp to 8.30 km Surfacing work (except 1900 m existing mastic work portions), under Jalpaiguri Highway Division in the district of Jalpaiguri.
Lataguri Kranti Road from 0.00 kmp to 5.90 km (except 990 m existing Mastic Asphat stretches), surfacing work including Mastic work for a length of 1215 metre under Jalpaiguri Highway Division in the district of Jalpaiguri.
Chengmari Upper Chengmari Road from Ch. 0.00 kmp to 7.20 km, Surfacing Work under Jalpaiguri Highway Division in the district of Jalpaiguri
Necessary Arrangement for DCRC at Siliguri College i.c.w General Parliament Election, 2026 -regd ---Temporary Electrical Installation work For DCRC, Counting and Strong-room till end of Election.
Electrical Repairing Work incl. Supply and Fixing Of Electrical Fittings and Fixtures at Kadambini Girls Hostel in the premises of North Bengal Medical College and Hospital, Shusrutnagar, Siliguri.
Temporary Electrification Works for strong room, DCRC, Vehicle Yard , other counters and Counting arrangement in connection with the General Election to West Bengal Legislative Assembly -2026 at Islampur College, Islampur, Uttar Dinajpur.
Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Bathroom Water Shower (V2) (Q3) (3 (3 ))
PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3), Urinal Bowls as per IS 2556 (Part 6) (Q3), Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3), Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3), (Vitreous China) - Washdown Water Closets as per IS 2556 (Q3), Internal fittings for LLFC complete, Nails wire 25mm pack of 250 Gm, Nails wire 40mm ack of 250 Gm, Nails wire 50mm ack of 250 Gm, Oil putty
Construction of Culvert near the land of Suklal Chikbaraik at Loknathpur Part No 10 of 193 under Turturi GP Alipurduar II Block within Alipurduar District
Register (V2) (Q4), Writing Pens (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Binder Clips (V3) Conforming to IS 8231 (Q4), Staple Pins/Staples(V3) (Q4), Glue Stick (V3) (Q4), Lamination Films (V2) (Q4), Photography paper Conforming to IS 6139 (Q4), Correspondence Envelopes (V3) Conforming to IS 13892 (Q4), Eraser (V2) (Q4), Manual Pencil Sharpener (V3) (Q4), Paper Clips (V2) Conforming to IS 5650 (Q4), Paper Pins (V2) Conforming to IS 5653 (Q4), Note Sheet Pad (Azure Laid) (V3) (Q4) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Construction of CC road at Sukhanibusty
INSTALLATION OF SOLAR BASED DRINKING WATER PROJECT
REPAIRING MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD GUARD WALL CULVERT AND DRAIN
INSTALLATION OF LED SOLAR STREET LIGHT
UPGRADATION REPAIR AND RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
INSTALLATION OF SOLAR BASED DRINKING WATER PROJECT
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD , GUARD WALL , CULVERT AND DRAIN
INSTALLATION OF LED SOLAR STREET LIGHT
UPGRADATION,REPAIR AND RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
UPGRADATION REPAIR RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD GUARD WALL CULVERT AND DRAIN
INSTALLATION OF SOLAR DRINKING WATER SCHEME BESIDE THE SHOP OF BASANTA DAS AT 17/30
INSTALLATION OF HAND PUMP NEAR HOUSE OF BADAL CHURNAKAR AT BOOTH NO 17/31
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 km x 720 hours; Outstation 24*7
ADDITION / ALTERATION AND SPECIAL REPAIRS TO CERTAIN OTM ACCN AT BINNAGURI MIL STATION UNDER GE (N) BINNAGURI AND GE (S) BINNAGURI
ROHINI DECOY ANTENNA
Repair and Overhauling Service - diesel generators- DG Sets; ENGINE DRIVEN COMPRESSOR; Yes; Buyer Premises
UPGRADATION,REPAIR RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD , GUARD WALL , CULVERT AND DRAIN
WBPHED/EE/JD/e-NIT-37/2023-24 (Sl.No.01)
WBPHED/EE/JD/eNIT-44/2021-22 (Sl. No.18)
WBPHED/EE/JD/eNIT-44/2021-22 (Sl. No.16)
Recovery and Restoration work of Tutapakri to Garalbari road from 0.30 km to 5.20 km under Jalpaiguri Highway Division in the district of Jalpaigur for mending up damages occurred due to heavy rainfall / flood like situation.
Engagement of an Inspection Vehicle diesel driven on a monthly hiring basis for the official use of the Executive Engineer Jalpaiguri Highway Division Jalpaiguri
INSTALLATION OF LED SOLAR STREET LIGHT
SINKING OF TUBE WELL
Recovary and Restoration work of Baradighi Nagrakata Road from 0.025 km to 2.00 km (except from 0.70 km to 0.90 km and 1.15 km to 1.27 km), from 3.00 km to 9.80 km (except from 4.50 km to 5.10 km and 7.00 km to 8.00 km) and etc.etc.
SINKING OF TUBE WELL
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD , GUARD WALL , CULVERT AND DRAIN
UPGRADATION,REPAIR RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
UPGRADATION,REPAIR AND RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD , GUARD WALL , CULVERT AND DRAIN
INSTALLATION OF LED SOLAR STREET LIGHT
SINKING OF TUBE WELL
UPGRADATION,REPAIR RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
SINKING OF TUBE WELL
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD AND DRAIN