Loading…
Loading…
4,801 results • Latest
Construction of 50m CC path at Prahlad Sarkar house to Malati Das house1no Goli in Ward No-02 under Jalpaiguri Municipality
Repair and renovation of Wildlife Interpretation Centre, Dining and Banquet hall, toilet block including retaining wall at Tilottama Tourism Property
Excavation of Water Harvesting Structure at Kalabari Basti mouza (JL No. 28), Angrabhasa-1 GP, Nagrakata Block, Dist. Jalpaiguri Scheme no. 1 under NMEO-OS during 2025-26, PIN - 735202
Annual Maintenance work at Moorti Tourism Property.
chain for lashing
Cloth, Disruptive Pattern, Uniform for VIP Security (Q2)
Recovery and Restoration work of Banarhat Railway crossing to Mogalkata Bazar upto joist bridge from 0.00 Km to 8.45 Km, under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy etc..etc..
Recovery and restoration of Fulbari to Ambari Falakata Road from 0.00 kmp to 7.00 kmp under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy railfall / flood like situation.
Stitching and Tailoring Service - Stitching; Cotton; Airforce
Construction of Single Cell 2m x 2m RCC Box Culvert at chainage 8.060 km,8.275 km.8.470 km and 9.780 km of Sahudangi to Belacoba Road under Jalpaiguri Highway Division in the district of Jalpaiguri.
Nagrakata Ramsai Road from 0.00 kmp to 6.00 kmp, Surfacing Work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 252637847S000.
Rangdhamali to Bodaganj Road from 0.00 kmp to 6.30 kmp, Surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 252637797S000.
Split Air Conditioner, Floor Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Short Term Cab & Taxi Hiring Services - Sedan; Outstation; 250Kms x 8Hrs
Heavy Duty Storage Racks (Q3)
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Cut - off Wheel (Q3), Grinding Wheel (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Shifting of pipeline including Providing FHTC at Masjid to Budhha Mandir under Binnaguri Piped Water Supply Scheme at Banarhat Block under Jalpaiguri Division, PHE Dte.
REPAIR/ RESURFACING TO CERTAIN ROADS IN OTM ACCNS OF POCKET A AREA OF B/R 1 SUB DIV UNDER VARIOUS UNITS AREA AND MD ACCN AREA ON EAST SIDE OF LEHL MARG OF B/R 1 SUB DIVISION UNDER GE SOUTH BINNAGURI
Pen Type 1, Pen Type 2, Pen Type 3, Glass Set 1, Glass Set 2, Glass Set 3, Glass Set 4, Glass Set 5, Ivory Coaster set 1, Ivory Coaster set 2, Ivory Coaster set 3, Ivory Coaster set 4, Ivory Coaster set 5, Hand Towel 1, Hand Towel 2, Hand Towel 3, Hand Towel 4, Hand Towel 5, Bath Towel 1, Bath Towel 2, Bath Towel 3, Bath Towel 4, Bath Towel 5
Unbranded Aluminium Platform step ladder of total extended height of 15 feet Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687715640999 dt.08/04/2026)
Supply of Furniture Articles / Items
Supply of Computer Articles / Items
Manpower Outsourcing Services - Minimum wage - Skilled; ITI; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Local Chemist Empanelment Service - Branded Allopathic medicines and surgical items; As per scope of work
SUPPLY OF FOOD INCLUDING TEA, TIFFIN LUNCH DINNER FOR WBLA 2026 FOR THE OFFICE OF THE SDO, MAL, JALPAIGURI
Supply of Different types of Furniture like Table Chair Etc
Supply of RBM Gunny Bag others works as mentioned in BOQ Etc
Different type of Structure Pandel Bamboo Timber Railing wooden plank Wooden Shelves windows and doors at Strong Room for safe custody of VVPAT Machines 125mm thick Brick works and others works as mentioned in BOQ
Professional Painting Service - PAINTING OF LLTR DECOY; PAINTING OF LLTR DECOY; PAINTING OF LLTR DECOY
Operation and Guarding of Pumping machinery at MAINATALI W/S SCHEME, Block DHUPGURI, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte.
Operation and Guarding of Pumping machinery at DHUPGURI MUNICIPAL W/S SCHEME, Block DHUPGURI, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte.
Operation and Guarding of Pumping machinery at BHANDANI W/S SCHEME, Block DHUPGURI, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte.
Operation and Guarding of Pumping machinery at PURBA DAUKIMARI W/S SCHEME, Block DHUPGURI, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte
Operation and Guarding of Pumping machinery at BARAGHARIA W/S SCHEME, Block DHUPGURI, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte.
Operation and Guarding of Pumping machinery at AMBARI TEA GARDEN W/S SCHEME, Block BANARHAT, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte.
Supply of Miscellaneous Articles / Items
Supply of Items for Community Policing
Supply of CTC Segments to Tea Estates in and WB
Tractors (V1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
As per tender docus
Engineering, Procurement and Construction (EPC) of "Supply, installation, testing commissioning and handing over of 11/0.430Kv substations at South and North side of NJP Station along with provision of HT Cables, LT Cables, HT/LT Switch gears and supply to LT Panels of individual service building/platforms like departure terminal, arrival terminal, podium and surface parking, all platforms and Circulating area etc, Provision of 4x2250kva DG Set along with 20KL UG HSD Storage tank, provision of 500Kwp on grid solar generation, provision of battery charging and precooling points and other infringement clearance work in connection with Major upgradation of NJP Station."
Repairing and maintenance work of DM Babglow Jalpaiguri due to change of Occupation under Jalpaiguri Division PWD
Capturing video and taking Still photography at various phases of Strengthening of Mal Baradighi Road from 0.00 kmp. to 9.2 kmp
POWER MODULE ASSY, MAIN PCB MODBUS, MODBUS CARD DUAL CHANNEL, FUSE KIT, CONTACTOR ASSEMBLY FOR K30 K150, CABLE LOOM ASSEMBLY, SWITCH MAKE ASSEMBLY WITH POT, OIL SEAL and O RING KIT, FELT SEAL KIT FOR K30 K150, YOKE ASSY AND CLUTCHRING FOR K30 K150, SHAFT ASSY FOR K30 K150, DERIVE BUSH, HANDWHEEL RETAINER, LIMIT SWITCH MECHANISM
Operation and Guarding of Pumping machinery at AUGMENTATION OF MALBAZAR MUNICIPAL W/S SCHEME, Block MAL, in the district of JALPAIGURI under Northern Mechanical Division, P.H. Engineering Dte.