Loading…
Loading…
1,356 results • Latest
SOLAR DRYER
Precast Concrete Blocks for Paving as per IS 15658 (Q3) (3 (3 ))
WEDGE BRAKE ACTUATOR, INJECTOR NOZZLE, SPEEDO CABLE, BUSH BRASS, POLE ACREW, WIPER ARM, ARMATURE ASSY, SPARK PLUG, SHOE SET REAR BRAKE, CABLE COMP CLUTCH, SPEEDOMETER HEAD, PETROL TANK CAP, THROTTLE CABLE, RUBBER BLOW CARBURATOR, BRACKET FRT BRAKE LEVER, SPARK PLUG CAP COMP, SILENCER ASSY, KICK STARTER CRANK, SPEEDOMETER ASSY, CARBURATOR ASSY, FLASHER UNIT, TOOL BOX LOCK, FRONT BRAKE CABLE, PUMP ASSY OIL, MIRROR REAR VIEW, FIELD COIL, OIL FILTER, INTERMIDIATE BRAKE HOSE, FUEL SYSTEM HOSE PIPE
TRD work in c/w Interlocking of 12 Nos Non-Interlocked LC gates having TVU 20000 and 50000 over Jammu Division
SPL REPAIR TO BLDG No P09 UNDER GE NORTH AKHNOOR
REPAIR OF PATH AND HARD STANDING UNDER GE NORTH AKHNOOR
Development/Upgradation of park,park no 16,ward 54 Jammu AC Bahu
Upgradation of lane and drain adjoining H o Sushil Kumar Gupta Lane no 3 Upside Greater Kailash ward 68 Jammu AC RS Pura
Establishment of 20 MT Capacity Spawn Production Laboratory under HADP Project Promotion of Mushroom Cultivation at Gole Pully Talab Tillo Jammu