Loading…
Loading…
1,323 live953 closing this weekmost from Department Of Military Affairs and PWD
1,323 results • Latest
Const of Protection wall near the houses of Chaman Lal, Suresh Kumar, Joginder Kumar at Badahar Chowki, Panchayat Juthal Balsroo, Block Chowki Choura Under CDF for the year of 2025-26.
Const of Protection wall near the house of sachin kumar S/o Yash Paul ward no 1, mohalla kaneri , Panchayat kaneri, Block Chowki Choura Under CDF for the year of 2026-27
Constt of a tractor road from main link road to Ghar Majoor to Hamlet Katwari (Ghar) Pyt Ghar Block Chowki Choura AC Chhamb, under CDF Scheme for the year 2026-27
Tile Work at Salyote Baba Mai Mal Dev Asthan W. No. 3 Pyt. Salyote Block Chowki Choura AC Chhamb under CDF for the year 2026-27
P Work at Mohalla Kaku Ram W. No. 2 Pyt. Salyote Block Chowki Choura AC Chhamb under CDF Scheme for the year 2026-27
Construction of waitng shed near Kai Devsthan village Rehani Mohalla Masha. Panchayat Maira Mandrian Block Maira Mandrian under CDF for the year 2026-27
Const. of Lane Drain Channel at Mohalla Suraj Parkash and Raj Kumar Makara W. No. 6 Pyt. Salyote Block Chowki Choura AC Chhamb under CDF scheme for the year 2026-27
Constt. Of Concrete work of Road from kali mata mandir to mohalla jeet kumar w no 5 , Panchayat RAH , Block Chowki Choura under CDF for the Year of 2026-27
Construction of Repair renovation of lane from National highway to Guru Gorkh Nath Temple wno 6 Panchayat Rah Block Chowki Choura under CDF for the Year 2026-27
Construction of Protection work near the house of Suresh kumar w no 4 Panchayat Rah Block Chowki Choura Under Scheme CDF for the year 2026-27
Construction Drain w no 4 Pyt. Salyote Ajay kumar Balwant raj s/o Harbans lal mohalla and harbans lal Panchayat Salyote Block Chowki Choura under CDF for the Year of 2026-27
Construction of lane from National highway to Mohalla Cherkigai w no 3 Panchayat Rah Block Chowki Choura under CDF for the Year 2026-27
Constt. Of Renovation of Bowli at Hardu Malara w no 1 Panchayat Rah Block Chowki Choura under CDF for the Year of 2026-27
Construction of Protection work near the house of Sanjeev kumar s/o Kewal kumar w no 1 Panchayat Rah Block Chowki Choura Under Scheme CDF for the year 2026-27
Const of Lane Drain Channel at Mohalla Krishna Devi W. No. 4 Pyt. Salyote Pyt. Salyote Block Chowki Choura AC Chhamb under CDF scheme for the 2026-27
SELECTION OF CRO FOR GMP FORMULATION OF NEW CHEMICAL ENTITY
Face lifting and renovation of the Office of the Executive Engineer Mechanical and Hospital Division Jammu
Manufacturing / Fabrication and Supply of Mechanical Spare Parts required for Jammu Ropeway Project (Indian Make).
Improvement/ Strg. Of MLA Khal of D-7 between RD 240-440M at spots and RD 1300-1350 at spot.
Construction of Tractor Crossing at RD 365M on Khordee Khal and field channel taking of from khordee khal of D-6 RD 370M and construction of field channel taking of from tail end of D/O 65900
Improvement and Strg. Of mattoo-I of D-7 of NPC at RD 1540-2205M at spots.
Improvement/ Upgradation of Hamirpur Kona between RD 0-1700M and sajwal Minor between RD 500-2200M at places.
Construction of Tractor Crossing at RD 940M of sub Minor of Khour minor of D-7.
Improvement/ Upgradation of Ext. of main Pargwal canal between RD 750-2200M at places.
Strengthening of D-12 between RD 2100-2700M and D-11A between RD 1380-1420M at spot.
Strg. Of Mattoo-III of D-7 of NPC at RD 0-100M and 1635M onward at spot.
Construction of Field Channel in command of D-11A in pallanwala / pallatan Village.
Improvement / Strg. Of Refugee Khal-I of Khour Minor between RD 600-1350M of D-7 of NPC at spots.
Improvement/ repair of Wall section between RD 07-350M at places of D/O 24100M of main NPC.
Improvement/ Upgradation of D-2A of pargwal canal between RD 2100-2300M.
Improvement of Doyian Minor of D-7 of NPC RD 3830-4130M at spots.
Improvement and Strg. Of D-3 at RD 900-1000M and RD 2300-2500M of LIS Ranjan.
Restoration and Improvement D-6 NPC RD 2130-2240M at spots.
Strengthening and up-Gradation of Nadwal Channel Rd 850M and by way of rasing of existing section.
Restoration of Direct Outlet 53400 of Main NPC at places.
Improvement/ Strg. Of D-11 of NPC RD 1090-1400M at spot.
Protection work of Syphon Rd 28700M of NPC by way of Crates at spots.
Improvement/ Stg. Of Lift Irrigation scheme Balgarah
Improvement / Strg. Of sainth Minor of D-7 of NPC RD 2620M onward.
Improvement/ Upgradation of D-3 of Main Pargwal Canal between RD 1400-1430M
Repair and Strg. Of Aqueducts and Syphons/ supperpassages on NPC falling between RD 27700-33600M.
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at W.no. 02, Mohra Panjtalab village an Pyt. Halqua Upper Bali, in District Udha
Integrated Redevelopment Beautification of JK House Complex incl. Renovation of Buildings and landscaping works underground sewerage network 5-P.R. New Delhi by way of Repair, Renovation and upgd. of Kitchen, storage, washing other allied areas a
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at 01 no. location in District Samba on Turnkey Basis (EPC) under MPLADS (2026-2
Deep Drilling of 125 mm dia Bore Hole by using ODEX method along with providing installation testing commissioning of submersible pump set with allied Electro-Mechanical works at Chander Bhaga colony, Ward No. 63, Lower Thather (Bantalab) in District
LEASING OUT JKRTC Business Community Centre Sangam at Rail Head Complex Jammu