Loading…
Loading…
11,816 results • Latest
MAINT OF SEWER NETWORK AND PERIODICAL SERVICES OF ACCNS IN PALLANWALA MIL STN AND ITS OUTSTATIONS UNDER GE(S) AKHNOOR.
SPL REPAIR TO SEWAGE LINE, SEPTIC TANK, SOAKAGE WELL AND OTHER ALLIED B/R WORKS IN JCOS AND ORS MD ACCN AT KS VIHAR IN AKHNOOR MIL STN.
Renovation of all bathrooms affected due to Improvement of the External Sewerage Line of whole colony, renovation of sewerage line from individual bathroom to manhole of all the blocks including construction of manhole of whole colony, construction
Upgradation of Govt Qtr. no. 26 A Gandhi Nagar Jammu. CNo- 125 P
Const. Of Lane and drain work at mohalla Thanger wala pyt Bain Bajalta Block Nagrota under Head UT Capex BUDGET. (COMMUNITY DEVELOPMENT ) for the year 2026-2027 2nd call
Construction ofBathroom at Jagti Jagdamba , Panchayat Jagti under scheme Community Development Jammu CD(P) , (UT Capex) for the Year 2026-27, 2nd call
Const. Of Tile work at Kaliveer Mandir near w.no 6 pyt Bain Bajalta Block Nagrota for the year 2026-2027 under Head DISTRICT CAPEX BUDGET. (COMMUNITY DEVELOPMENT ) FOR THE YEAR 2026-27
Construction of Tile work from Main Road to house of Mohd Salim , Kore Jagir , Panchayat Nadore , Ward no.6 Block Nagrota under scheme Community Development Jammu (UT Capex) for the Year 2026-27
Non-Comprehensive Annual Maintenance Contract of HVAC High Side at AIIMS Vijaypur, Jammu
Deep Drilling, Development and Stabilization of 250 mm dia Tube well upto 300 meters Below Ground Level by Direct Rotary/Reverse Rotary/Dual Rotary Method on EPC Mode at WSS Lok Bhawan Jammu (Phase II) in District Jammu under UT Capex.
SPL REPAIR TO SEWAGE LINE, SEPTIC TANK, SOAKAGE WELL AND OTHER ALLIED B/R WORKS IN JCOs AND ORs MD ACCN IN MS VIHAR IN AKHNOOR MIL STN UNDER GE (S) AKHNOOR.
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (05 Nos) different locations in District Kathua on Turnkey Basis (EPC) under
AS PER BOQ
Construction of P-Work for Mohalla Rattan Kumar at village Marh, Pyt. Marh,Block Nagrota under MPLADS for the year 2026-27 2nd call
AS PER BOQ
AS PER BOQ
Repairs to Farm irrigation system by way of replacing damaged monoblock pumps with allied works at Main Campus, Chatha
Construction remodeling of existing Guest House including internal electrification, sanitary and A.C. fittings etc. at Rail Head Complex, SKUAST Jammu
Deep Drilling, Development and Stabilization of 200 mm dia Mini Tube well (on EPC Mode) By ODEX Method at Dharamsal in District Rajouri under UT Capex 2026-27
Concrete Test Hammer (Rebound Hammer) (Q3)
Improvement / up gradation of D-2 of Pargwal Canal between RD 700-1900M at Places.
Improvement of D-1 of Main Garkhal Canal between RD 600-1200M at places and allied works.
Improvement/ Construction of Cahnnel at D-3 of Garkhal Canal between RD 1200-1400M at places.
De sludging/cleaning of the existing drains in the Research Farm at Main Campus, Chatha
Improvement / up gradation of deora Minor of Pargwal Canal between RD 1500-3500M at places (Part-II)
Improvement of Direct outlet D-1 of Main Garkhal Canal between RD0-220M at places and other allied works
Rennovation Of Shamshan Ghat Tabela, Ward No.2,Pyt Kote Lower B Garhi,Block Bhalwal,Under UT Capex Head Community development Jammu For FY 2026-27
Renovation of Community Hall with Allied work at Wno4 Pyt Chak Bhagwana Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2026-27. (Block Level)
Constt.of Lane/Drain moh.Babu Ram,Vijay kumar at Tal w.no.3, Pyt Jamotian,Block Bhalwal Brahmana Under scheme PRI District Capex Budget for the year 2026-27. (Block Level)
Improvement / Up gradation of Head Work of D-1, D-2A of Pargwal Canal.
Const. of lane/Drain at wno.2 from H/O Sonu Kumar to H/O Smt. Jeeto Mohalla Bazigarh backside of Bharat Petroleum Petrol Pump Pyt Kot Lower A Garhi Morh Block Bhalwal scheme CD PYT YEAR 2026-27
Constt.of Lane/Drain moh. Prabh Dayal P/work NHO Goutam and Kalidass at w.no.5, Pyt Jamotian,Block Bhalwal Brahmana Under scheme PRI District Capex Budget for the year 2026-27. (Block Level)
Constt.of Lane/Drain/P/work moh.Chalda w.no.1, Pyt Jamotian, Block Bhalwal Brahmana Under scheme PRI District Capex Budget for the year 2026-27. (Block Level)
Constt. of Lane/Drain/P/work moh.Sather Manani w.no.2, Pyt Jamotian,Block Bhalwal Brahmana Under scheme PRI District Capex Budget for the year 2026-27. (Block Level)
Restoration of embankment and P/G damage of D-7 of NPC at RD 2700M ( Under SASCI)
Reconstruction of parking at Main Campus, Chatha
Construction of Drain near Baba Narsingh G at w.no.7, Pyt Jamotian Block Bhalwal Brahmana Under scheme PRI District Capex Budget for the year 2026-27. (Block Level)
P WORK NHO MOHD YUNIS W.NO.05,Panchyat Showa,Block Bhalwal Under UT Capex Head Community development Jammu For FY 2026-27
Improvement / Up gradation of D-1 of Pargwal Canal between RD 1200-2500M at Places. (Part-II)
Construction of Lane At Mohalla Assarwan near H/O Parmod Singh and Others,ward No. 5 Pyt Bhalwal Lower,Block Bhalwal,Under UT Capex Head Community development Jammu For FY 2026-27
Construction of Culvert Along With Laying Of Tiles Near Ganesh Mandir,Mishriwala, Pyt Bhalwal Lower,Block Bhalwal,Under UT Capex Head Community development Jammu For FY 2026-27
Replacement of damaged floor at Ground Floor and lower corridor wall borders with granite and renovation of exterior walls and associated area around the Institute of Biotechnology at Main Campus, Chatha
Construction of P/work H/o Heera Singh and Rattno Devi at w.no.6, Pyt Jamotian Block Bhalwal Brahmana Under scheme PRI District Capex Budget for the year 2026-27 (Block Level)
Restoration of shade house at KVK Gwari, Bhaderwah, Distt. Doda
PROVN OF TWO SINGLE OFFICERS LIVING ACCN AT PALLANWALA AND PROVN OF TWO SENTRY POST WITH GUARD ROOM AND ALLIED INFRA FOR INF BN PALLANWALA UNDER GE (SOUTH) AKHNOOR
Constt.of Road/Step with allied work at Kander Sudain at w.no.4, Pyt. Jamotian Block Bhalwal Brahmana under PRI Grant Distt.Capex Budget for the year 2026-27. (Block Level)
Improvement of D-2 Main Garkhal Canal between RD 300-1700 at places and allied works
constt of tile work from main road to Dhar Dharochan towards Dev sthan Raja Mandlik at Seri Panditan Pyt Seri Panditan Block Bhalwal under PRI for the Year 2026-27
Construction of Flood protection RCC wall around the Gene Bank of Institute of Biotechnology at Main Campus, Chatha
Restoration of Main NPC lining section between RD 14430-14510M ( Under SASCI)