Loading…
Loading…
1,076 results • Latest
Internal Clearance, Jungle Clearance and Silt Clearance Jind Disty No.3 from RD 90200 to 128030 Tail
I/C and J/C and S/C of Brar Khera Minor from RD 0 to 33451Tail
Construction of Aspirational Toilet in Ward No. 06 of MC Uchana. (Re-Tender)
ANNUAL REPAIR OF MC PROPERTIES PHASE-I IN NGM SAFIDON I.E ANCHRA KALAN , HATT AND SIWANAMAL( M.C -SAFIDON) FOR THE YEAR 2026-27
Annual Maintenance Estimate of Hort. works in sector-7, Jind for the year 2025-2026.
ANNUAL MAINTENANCE ESTIMATE OF HORTICUTLURE WORKS IN SECTOR-9 AT JIND FOR THE YEAR 2026-2027.
ANNUAL MAINTENANCE ESTIMATE OF HORTICULTURE WORKS IN SECTOR-8 AT JIND FOR THE YEAR 2026-2027.
Special repair of AA-1 and AA-2 Residence in 2700 Sft Area double storey building in C.S. area at Jind in Jind Distt.
Special repair of A-4 Judicial Residence 1882 Sft in Civil Station area at Jind in Jind Distt.
Providing Electrification ,Street Light and illumination in Shopping Center in Sector 7 at Jind.
Special Repair of Residence quarter of Civil Hospital at Uchana in Jind District
Providing Electrification, Street Light and Illumination in Shopping Centre Sector 8, Jind
Providing Electrification, Street Lights and Illumination in Shopping Centre Sector 9 at Jind
I/C and J/C and S/C of Jind disty No. 7 and Ghimana Minor from RD 0 to Tail
Electrostatic Painting System
ANNUAL REPAIR OF MC PROPERTIES JULANA GROUP - 2 AND 3 (MC JULANA) FOR THE YEAR 2026-27.
Annual maintenace of street light points EDC dividing road of Sector 6 and 7 , Sector 7 and 8 sector 8 and 9 HBC STP WTP and various sectors major parks at Jind
ANNUAL REPAIR OF MC PROPERTY NVM JIND(MC JIND) FOR THE YEAR 2026-27.
Mtc of water supply
Clearance of Jungle, Const. of support wall and earth filling, Prov. and fixing of M.S. grill with toewall, Prov. and fixing of M.S. Turning Gate, Prov. and fixing 1.80 Mtr RCC Pillar, Turfing of lawn and Supply and planting tree and shrub Clearance
White washing
CONST OF ILPB STREET FROM JULHERA ROAD TO FARM OF SH BALWAN S/O KAPUR SINGH VILL FULIAN KALAN BLOCK NARWANA
Upgradation and automation of the existing gaseous chlorination system for rural w/s scheme in PHED No.1 Jind
Household Refrigerating Appliances as per IS 17550 (Q2) (3 (3 ))
Raising of Manhole
Construction of Prop Water works component i.e SandS tank, suction wells , Pump Chamber, water treatment plant and laying of DI pipe lines in village Rewar,Padarth Khera,Naraingarh and Dhabi Tek singh.
Construction of Prop Water works component i.e SandS tank, suction wells , Pump Chamber, water treatment plant and laying of DI pipe lines in village Rewar,Padarth Khera,Naraingarh and Dhabi Tek singh.
Estimate for Providing 4 No. Water Tanker at various villages for Pillu Khera Block and Safidon Block under District Jind (Under District Plan Scheme 2025-26).
Estimate for Providing 5 No. Water Tanker at various villages for Pillu Khera Block and Safidon Block under District Jind (Under District Plan Scheme 2025-26).
Estimate for Providing 5 No. Water Tanker at various villages for Pillu Khera Block and Safidon Block under District Jind (Under District Plan Scheme 2025-26).
Providing 1 No. Water Tanker at village Brahmanwas
Providing 1 No. Water Tanker at village Ramrai
Lakhmirwala Renovation of Water Supply Scheme Village Lakhmirwala Distt.Jind
Estimate for internal clearance / Silt clearance and jungle clearance of Rojhla Minor from RD 0 to 49260.
Estimate for internal clearance and jungle clearance of Butana Branch from RD 0 to 17492
Estimate for the work of silt and Internal clearance and Jungle clearance of banks of Jind Disty No. 3 from RD 50000 to 74800.
Estimate for repair work of silt and internal clearance and jungle clearance of banks of Gangoli Minor from RD 0 to 27345. (Tail)
Estimate for Internal clearance /silt clearance and jungle clearance of Morkhi from 0 to 22780 tail.
Estimate for S/C, I/C and J/C of Joshy Disty from RD 0 to 34000 before Kharif 2026.
Estimate for the work of S/C,I/C and J/C of Channel JD No. 2 Rd 0 to 10955 for kharif season (2026-2027).
Estimate for S/C,I/C and J/C of Shak No.2 From Rd to 14500 for kharif season(2026-27)
Supply of Diet three times a day in maternity ward
Estimate for S/C,I/C and J/C of Shak No.1 From Rd 0 to 10000 for kharif season(2026-27)
Estimate for the work of S/C,I/C and J/C of Channel Nara Distributary Rd 0 to 10715 for Khrif season (2026-2027).
Estimate for silt clearance and internal clearance and jungle clearance of channel JD no 1 RD 0 to 57900 kharif season 2026-27
Estimate for repair/remodeling of sectional Area of National Highway Bridge on Morkhi Minor at RD 20900 under Jind-Sonipat National Highway.
Estimate for internal clearance and jungle clearance of Hansi Branch from RD 84000 to 106000.
Estimate for internal clearance and jungle clearance of Hansi Branch from RD 60000 to 84000.
Kharak Ramji Estimate for providing and laying of DI pipe line in place of damaged pipe line and balance street in village Kharak Ramji.
Radhana Construction of Boosting Station and laying of distribution pipe in balance streets Village Radhana Distt.Jind