Loading…
Loading…
Found 44 active tenders
44 results • Latest
CONSTRUCTION OF MINISTERIAL STAFF QUARTER AT PHULBANI
CONSTRUCTION OF MINISTRIAL QUARTER AT PHULBANI
CONSTRUCTION OF MINISTERIAL STAFF QUARTER AT PHULBANI ( NEAR FOREST COLONY)
CONSTRUCTION OF MINISTRIAL QUARTER AT PHULBANI
Imp.to RMC from RD 163m to 705m, RD 1178m to 1388m and from RD 3054m to 990m of Kanipenu MIP in Phiringia Block of Kandhamal district under CAPEX_Lining for the year 2025_26
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter-spread with boulders up to ½ cum. Size with all lifts and de-lifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads from the place of excavation complete in all respect as directed by the Engineer in charge. (Foundation)
Construction of Koilikura Check Dam near village Karandagada of Bandhagada GP in Phiringia Block of Kandhamal district
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter-spread with boulders up to ½ cum. Size with all lifts and de-lifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads from the place of excavation complete in all respect as directed by the Engineer in charge. (measurement should be taken on finished level section) (over burden cutting)
Construction of Dhobatota Check Dam near village Dhobatota of Katringia GP in Phulbani Block of Kandhamal district
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter-spread with boulders up to ½ cum. Size with all lifts and de-lifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads from the place of excavation complete in all respect as directed by the Engineer in charge. (measurement should be taken on finished level section) (over burden cutting)
Construction of Internal Drainage System at PHC(N) Building Kotagarh for the year 2023-24
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maxmimum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of E.I.C.