Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.7 L
EMD Value
₹19,000
Closing Date
26 Nov 2026, 5:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Officer
ROADS and BUILDINGS DIVISION, BALLIGUDA
Construction of Prefab Structure for UHWC at Balliguda in the district of Kandhamal for the year 2026-27. Buildings
2026_EICCL_146426_1
SEBLG-10/2026-27
Open Tender
Civil Works - Buildings
Percentage
75 days
Kandhamal
2 documents required · 2 mandatory
₹6,000
₹19,000
Yes
17 Nov 2026
17 Nov 2026
27 Nov 2026
17 Nov 2026
26 Nov 2026
17 Nov 2026
17 Nov 2026 - 26 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work
Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc, complete in all respect for the work as directed by the Engineer-in-charge. | 59.17 | cum | 286.47 | ₹16,950.43 |
| 2 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour, T&P completed as directed by the Engineer-In-charge | 32.7 | cum | 179.42 | ₹5,867.03 |
| 3 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect and as per direction of Engineer-in-Charge. | 24.68 | cum | 1,471.22 | ₹36,309.71 |
| 4 | PCC (M-15) grade with 4cm size Hard granite metal in foundation as per Drawing and Technical Specification complete including cost and conveyance of all materials with and royalties and all labour with T&P required for the work etc. complete including dewatering if required | 19.26 | cum | 8,147.18 | ₹1,56,914.69 |
| 5 | Fly Ash bricks Masinary (1:6) (in F & P).
First class Fly Ash Brick masonry using F.A. bricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix(1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-Charge.
in Foundation and Plinth | 3.93 | cum | 4,528.8 | ₹17,798.18 |
| 6 | in Super Structure | 24.05 | cum | 4,562.13 | ₹1,09,719.23 |
| 7 | 75MM THICK DRY WALL (EPS BOARD)
Providing & fixing of wall panelling with EPS panels in exterior walls 75mm thickness. The panels erected must be water & air tight & fixed with Gl channel of required thickness help of anchor fastener & 40x40 tubular section welded column to column with base cleat at the bottom.T he clear height from floor to ceiling should be 9'7" with all complete as per diriction of Engineer in-charge | 92.82 | sqm | 2,415.85 | ₹2,24,239.2 |
| 8 | 50MM THICK DRY WALL (EPS BOARD)
Providing & fixing of wall panelling with EPS panels in exterior walls 50mm thickness. The panels erected must be water & air tight & fixed with GI channel of required thickness help of anchor fastener & 40x40 tubular section welded column to column with base cleat at the bottom. T he clear height from floor to ceiling should be 9'7" with all complete as per diriction of Engineer in-charge | 52.49 | sqm | 1,630.4 | ₹85,579.7 |
| 9 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 200 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.
Footing | 3.27 | cum | 6,936.02 | ₹22,680.79 |
| 10 | RCC work of M-20 grade concrete in Column Super Structure | 1.34 | cum | 16,318.84 | ₹21,867.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 10.25 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_621572.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .