Loading…
Loading…
112 results • Latest
Completion of balance Work of Construction of Protection Bund at Nallah Gound Minjee
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches ordrains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, liftupto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind Of soil 50%
Cook House Dining Hall 1, Cook House Dining Hall 2, PPR Items, Sanitary Fitting Items, Electrical Fitting Items
Cook House Dining Hall 1
Supply of JCO Living Shelter FEMS 1, Supply of JCO Living Shelter FEMS 2, Supply of JCO Living Shelter FEMS 3, Supply of JCO Living Shelter FEMS 4, Supply of JCO Living Shelter FEMS 5
Supply of JCO Living Shelter FEMS 1
Supply of Field Flush Latrine 2 oblique 1 1, Supply of Field Flush Latrine 2 oblique 1 2, Supply of Field Flush Latrine 2 oblique 1 3, Supply of Field Flush Latrine 2 oblique 1 4, Supply of Field Flush Latrine 2 oblique 1 5
Supply of Field Flush Latrine 2 oblique 1 1
Fd water storage tank HDPE 500 ltr 1, Fd water storage tank HDPE 500 ltr 2, Fd water storage tank HDPE 500 ltr 3, Fd water storage tank HDPE 500 ltr 4, Fd water storage tank HDPE 500 ltr 5
Fd water storage tank HDPE 500 ltr 1
Speaker (V3) (Q2), Audio Mixer (V2) (Q2) (3 (3 ))
Speaker (V3) (Q2)