Loading…
Loading…
808 results • Recent activity
HARNESS FOR BPJ, NON RECHARGEABLE BTY 1035 R14 S 1.5V, LV6/MT14/NK/COVER OUTER 265/60 R 18, WICKS FOR KERO HEATER LARGE, WICKS FOR KERO HEATER SMALL, HARNESS FOR BPP
Cavit G temp filling material, Chromic Alginate pkt of 450 gm, Endo Access bur gold, Ketac Molar Type IX, Flowable composite Kit Shade A1 A2 A3 B1 B2, Modelling wax for dental use, Gluma for hypersensitivity bott of 05 to 10 ml, Zinc oxide Eugenol paste for secondary impression, Dycal Ca OH 2 tube, Cold Mould Seal 450ml Bott, Younifloss Dental floss, Dental floss thread mint pack of 3 10 mtr, Crown cutting bur set, Pierzo Reamer, Retreatment Geoendo, Endosolve R, Nitrile Gloves Box of 100 Size Medium, GIC Cutting Luting cement Type I, Blow Torch, Scissors suture cutting
Repair and maintenance work in T E Compound Kargil
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6800994 Dated : 17-10-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 379640 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 64 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWERGRID CORPORATION OF INDIA GRID BHAWAN, OB-26, RAIL HEAD COMPLEX, NEAR BAHU PLAZA, JAMMU, JAMMU & KASHMIR-180012 (Powergrid Corporation Of India)
P.F. Huts with PUF Panel (MHA) (Q3) (3 (3 ))
Tab Oseltamivir 75 mg, Isosorbide Dinitrate 10 mg Tab, Ondansetron 2mg per ml 4 ml Inj, Inj Rabipur 0 Point 5 ml, Tranexamic Acid 500 mg per 5 ml inj, Oral Rehydration powder sachet of 20 Point 5 g Orange Flavour