Loading…
Loading…
2,186 results • Latest
Felling of Trees from Forest and Non Forest areas with extraction of Stumps Conversion Measurement Recording Loading Carriage Unloading and Stacking Making Lots in Sale Depots and all related works in Indri Range
Cleaning of nallah and storm water pipeline in various locations of Ward no.6, M.C. Karnal. ( For Rainy Season-2026)(Only for L/C Societies)
Internal clearance of Main Drain No. 1 from RD 9500 to 39500 before flood season 2026
internal clearance Gharaunda Ganda Nallah from RD 2700 to 41500 before flood season 2026.
Cleaning of RCC pipe line and nallah at various village and colony of ward no.1, Municipal Corporation Karnal.(Only for L/C Societies)
Internal clearance of Rasin Minor from RD 0 to 19750 before Kharif Season 2026-27
Internal clearance of Begumpur Minor from RD 0 to 18300 before Kharif Season 2026-27
Internal clearance of Gudha Minor from RD 0 to 13465 before Kharif Season 2026-27
Jungle clearance of inner slope, dowels and outer slopes including surface dressing of both side banks of WJC MLL from RD 168000-190950 before Kharif season 2026
Internal clearance of Danialpur Drain from RD 0 to 15000 before flood season 2026.
PROVIDING AND INSTALLATION OF ADDITIONAL ONE NO. TUBEWELL IN NGM AT KUNJPURA- Reserved for Land C Society
RAISING OF BOUNDARY WALL NEAR SHOP NO. 114 AND PROVIDING and FIXING OF SHALLOW DRAIN BEHIND SHOP NO. 115 TO 136 IN NGM AT INDRI (UNDER MANDI VIKAS KOSH 2025-26)
PROVIDING AND LAYING 60 MM THICK INTERLOCKING PAVER BLOCKS IN VARIOUS BLOCKS OF NGM AT NISSING (UNDER MANDI VIKAS KOSH 2025-26)
Providing and Laying of Pumping Machinery, Construction of Pump Chamber, Construction of Boundary Wall and Raising Main
PAIR AGROKING Semi Trailer (Single Axle) with Tipping Platform of Capacity 5 tonne Brand: PAIR AGROKING (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687716729884
Internal clearance of Samora Drain from RD 1500 to 28800 before flood season-2026.
internal clearance of Phurlak Drain from RD 0 to 46000 before flood season 2026.
Internal clearance of Bazida Drain from RD 0 to 14500 before flood season 2026.
internal clearance of Ditch Drain from RD 0 to 13250 before flood season 2026.
Internal clearance of Uchani Drain from RD 0 to 7500 before flood season 2026.
internal clearance of Hanauri Main Drain from RD 4700 to 100000 before flood season 2026.
Dismantling concrete, floor tiles, wall tile, brick work, cement plaster and water proofing
Attending day to day complaint of water supply leakages for complete sector and operation and running watch and ward of TWs
Providing and laying of GSB and Interlocking tiles
Retrofit DR Systems
Unbranded Brass Hexagonal hex reducing nipple 1/2 inch
Annual repair and maintenance of street lights in MC Indri
Providing and fixing of Iron bench at various location under Municipal Committee Indri in ward 1-14
Cleaning of various nala in limit of Municipal committee Indri
Nickel plated brass PG thread Plug Screw PG-48
Internal Clearance of Sheikhupura Manchuri Drain from Rd 0 to 31500 before flood season 2026.
Internal Clearance of Assandh Link Drain No. 4 from RD 0 to 8500 before flood season 2026.
Internal Clearance of Assandh Bundh Drain from RD 0 to 9975 before flood season 2026.
Internal Clearance of Assandh Sub Drain from RD 0 to 7850 before flood season 2026.
Internal Clearance of Salwan Link Drain from RD 0 to 11500 before flood season 2026.
Internal Clearance Chautang Drain from RD 0 to 70675 before flood season 2026
Internal Clearance of Nai Nallah Drain from RD 33000 to 104800 before flood season 2026.
Internal Clearance of Assandh Main Drain from RD 24000 to 48695 before flood season 2026.
Internal Clearance of Assandh Peripheral Drain from RD 9975 to 11520 before flood season 2026.
Internal Clearance of Bindrala Link Drain from RD 10600 to 0 before flood season 2026.
Internal Clearance of Indri Drain from RD 13000 to 70000 before Flood Season 2026.
Internal clearance of Nissing Drain from RD 120000 to 146800 before Flood season 2026.
Internal clearance of Indri Drain from RD 165000 to 112000 before Kharif season 2026.
Internal clearance of H-Drain from RD 0 to 39500 before flood Season 2026.
Internal Clearance of Ramba Link Drain from RD 0 to 16250 before flood Season 2026.
Internal clearance of Pabana Drain from RD 0 to 27500 before flood season 2026.
Internal Clearance of Pabana Sub Drain from RD 0 to 3500 before flood season 2026.
Internal Clearance of Link Drain No. 4 from RD 0 to 11500 before flood season 2026.
Internal Clearance of Nilokheri Drain along Railway Line from RD 0 to 11500 before flood season 2026.