Loading…
Loading…
147 results • Latest
Providing Internal Arrangements Such as Aluminium Partition, Mosquito Net and Bed Screen arrangements, Public Toilet, Bio Medical Waste Storage Room, Laundry and CSSD Room arrangements in Govt District HQ Hospital at Kulithalai in Karur District
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Brick / stone masonry in Cement mortar walls under 3m high
GF 2025-26 Maintenance of School Building at Vaiyapurigoundanur PUE School in Uppidamangalam Town Panchayat, Karur District.
Supply and Fixing of ISA equal angle for truss including cost of Material conveyance of all material, fabrication and fixing charges etc.Complete as per ISI with rust preventive primer & ready to assemble condition for easy installation at site including dismantling making necessary with power drill to the accessories such as supplying and fixing holdfasts, plastic bush inserts receiver runner bottom shock absorbers etc. Complete as Directed by the Departmental Officer.
Karur corporation- Watersupply Fund -2025-26providing water supply pumping main Kattalai sanapirati ward no 13 in zone -III at karur city muncipal corporation
Cutting the existing BT surface including clraing away from the site etc., complete
Karur corporation- Watersupply Fund -2025-26Servicing and repiring of 120 HP HSC motor in Kattalai old Thantoni and also Complete Rewinding of Stator and Rotor for 60 HP Kattalai sanapirati new Infiltration well in zone -3at karur corporation
Labour charges for the removal of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Flushing of radial arms at Nerur Head workWell 2 and desilting light or sandyhsoil from Nerur new 110scheme in mandalam II at karur city Municipal corporation.
Removing Nerur Head work Well -1 of sand, silt deposites of loosely formed iron solids etc filled inside the radial arms of each 300 mm dia and 35m length driven inside the collector well using wire brushes with special tools and plants, cleaning of radial arms so as to enlarging the radial arms to its orginal radias for increasing the yield in the radial arm using UPVC pipes for creating water pressure jet with special tools and plants including cost of labour for working inside the collector well for fixing of special valves, equipments for cleaning of radial arms and obtaining assured required yield of pumping quatity in the collector well etc complete. including all precautionary arrangements, lighting arrangements,special life jackets and arranging risk insurance to men who are workig inside the well water below GL and machineries already erected inside the Collector well and as directed by the departmental officers.
Attending leak and burst works in the distribution main pumping main reconditioning of existing distribution valves etc at zone II of KCMC.
Rectifying the 160 mm dia PVC/ HDPE pipe leak and burst works in the Distribution main including removing the burst pipe, earth work on linear measurement, lowering & jointing the pipes with specials, cost of pipes & specials, testing the pipes with required presure etc, complete.