Loading…
Loading…
1,498 results • Latest
PROCUREMENT OF PP BAG FOR POWER BOND CEMENT PACKING SIZE 29.3 X 20.5 INCH
Attending leak and burst works in the distribution main ,pumping main reconditioning of existing distribution valves , etc at zone 2 Karur City Municipal Corporation
Attending leak and burst works in the distribution main ,pumping main reconditioning of existing distribution valves , etc at zone 3 Karur City Municipal Corporation
Rental charges for Computer, printer and Stationery charges for 32 location makaludan Mudhalvar phase 4 for Karur Corporation
Attending leak and burst works in the distribution main ,pumping main reconditioning of existing distribution valves , etc at zone1 Karur City Municipal Corporation
Additional Work for Zonal 2 New office Building at South Madavilagam OHT Campus , In Karur City Municipal Corporation
Additional Work for Zonal 1 New office Building at Lakshminarayana Samuthiram, Inam Karur, In Karur City Municipal Corporation
TRANSPORTATION OF CORE PIPE IN CRATES FROM MAYANUR TO TNPL UNIT-1 AND TNPL UNIT-2 AND RETURN TRANSPORTATION WITH EMPTY CRATE TO MAYANUR BY 40FT FLAT BED TRAILER
Karur Corporation_Nammaku Nammae Thittam 2025-26_Providing drinking water facilities for the newly constructed Skill Development Centre NGGO Nagar area in ward No.41 at Karur City Municipal Corporation
Karur Corporation_Nammaa Nammae Thittam 2025-26_Providing 200 mm HDPE pumping main for 2400m length at Zone 4, Ponnagar Water Station,Supply and installation of Panel Board and other electrical equipment Zone-4 for karur city muncipal corporation
Karur Corporation_Nammaa Nammae Thittam 2025-26_Supply , delivery and laying of 300sqmm LT cables and Construction of Electrical panel Room in kattalai old thanthoni. scheme for karur city municipal corporation
Renewal of BT Road at Amarjothy Garden 1st Cross W-E 082015R1303 ,Double Road082039R1458, North Gandhigramman m. Road From Delhi Sw ts to EBCR 082018R1395 in Ward No.15,18 39 at Karur Corporation limit. Zone III Package 5
Transportation of DIP Plastic Waste Bale or Loose along with jumbo bags from TNPL Unit 1 at Kagithapuram to Ultratech Cements at Ariyalur and Dalmia Cements Limited at Dalmiapuram, Ariyalur
Construction of Storm Water Drain with RCC Culvert at Jeeva Nagar East in Ward No. 41 Zone 3 at Karur City Municipal Corporation.
Lifting of fire wood, stacking, feeding and cleaning the ash in Boiler 6 at Energy Process in TNPL Unit I
Dismantling and Erection of 600NB Butterfly valve with 2Nos. mating flange with 4mtr 600mm pipe in WTP Process head line at Energy Mechanical
Renewal of Zimbra Premier Support for Professional and Standard Edition and extended Technical support for Zimbra License Period 06th May2026 to 05thMay2027 One year
Transportation of Technical Grade Urea from Gujarat Narmada Valley Fertilizers and Chemicals Ltd., Bharuch, Gujarat to TNPL Unit 1 at Kagithapuram through Truck
Maintenance and repair to Anganvadi Near Union Office Ward No.42 in Karur city municipal corporation.
Karur Corporation_Nammaa Nammae Thittam 2025-26_Supply and installation of 185sq.mm cable and 35HP electric motor, panel board and other electrical equipment in Kattalai Sanapiratti at Moolakattanur water supply station at karur corporation
Karur Corporation_Nammaku Nammae Thittam 2025-26_Supply and installation of 150mm DI non return valve, 150mm DI non return valve at the main water supply station and supply and installation of 30HP at the Kuluthupalayam at Zone 1 Karur corporation
Karur Corporation_Nammaa Nammae Thittam 2025-26_Supply and installation of 185sq.mm cable at Nerur Head Water Supply Station and 50HP electric motor, panel board and other electrical at Balammalpuram .in Zone 2 for karur city muncipal corporation
Restoration of Pipe Line at Pazhamuthir to LGB Main Road in Zone II at Karur City Municipal Corporation.
1.Strengthening the road from Merku Rasapatty Road To Malai Road 2.Strengthening the road from Kulanthaipatti main road Drama stage to School road
1.Strengthening the road from Kulithalai Manaparai road to North Myladi Km 0/0-0/6 2.Strengthening the road from Seekampatti P.U.E School Road Km 0/0-0/75
Strengthening and Upgradation 3 works Package No.TN 07 27
1.Upgradation Erode main Nallammal Nagar Road 0/0 - 0/210 2.Upgradation New Tami Nagar Road 0/0 - 0/390 3.Upgradation Cheran Nagar Road 0/0 - 0/110 4.Strengething Kovai Main Road Ezhil Nagar To Rajavaikal Road k.m 0/060 - 0/180
1.Strengething Ashok Nagar Road k.m 0/0 - 0/698 2.Renewal The Road from Vasatham Nager Road k.m 0/0 - 0/210
1.Strengthening Reddipalayam Anbu Nagar 0/0 - 0/185 2.Strengthening Muthu Nagar To Surya Apparmet Road k.m 0/0 - 0/240 3.Strengthening CAK Road to Fashion Tex Road k.m 0/0 - 0/215
1.Upgradation the Ambethkar Nagar (JJ Garden) Road Km 0/0-0/210 2.Upgradation the Meenavar Nagar Road Km 0/0-0/210 3.Renewal the road from Nerur Bagavathi amman kovil Road Arch Road Km 0/0-0/880
1.Upgradation the Pasumai Nagar Road Km 0/0-0/150 2.Upgradation the Muniyappanur Vinayagar Kovil Street Road Km 0/0-0/400 3.Upgradation the Othakadai AD Colony North Side Road Km 0/0-0/280
Providing New Pipe Line and specials at Zone 3 in Ward No. 42 in Karur City Municipal corporation
Widening from Two Lane to Two Lane with Paved Shoulder and Strengthening at km 102/2 - 118/070 including Widening of Pipe Culvert at km 102/4, 103/2, 103/10, 104/2, 107/4, 107/10, 109/8, 110/10, 113/2,115/2, 115/8, 115/10, 117/10 and Widening of Sl
Strengthening 4 road Works - Package No.TN 07 18
Strengthening and Renewal 2 road Works - Package No.TN 07 19
1.Upgradation Arul Nager Kandhan Mahal (opp) Road k.m 0/0 - 0/310 2.Upgradation Saravana Nager Extension Nadhini Land To Sakthivel Land k.m 0/0 - 0/175 3.Strengthening Arul Nager Extension to amman Nager II k.m 0/0 - 0/195
Karur Corporation_Nammaku Nammae Thittam 2025-26_Replacement of the old 63mm PVC distribution pipe with 110mm HDPE pipe and to extend the 110 mm HDPE pipe of 4500m length for water supply in the extended area. In Zone- 3 at Karur Corporation
Supply of UNMANNED WEIGHBRIDGE KIT INCLUDING IMPLEMENTATION AND INTEGRATION WITH TNPL ERP AND ITS COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT (AMC) FOR 5 YEARS
Sale of Waste and Scrap of Damaged HDPE Jumbo Bags from TNPL Unit 1 on Six months rate contract
Sale of 3 lots of Used Plastic barrels Blue Green White 5 ltrs to 160 ltrs from TNPL Unit 1 on Six Months Rate Contract
Sale of Waste and Scrap of HDPE Bags Sheets from TNPL Unit 1 on Six months rate contract
Providing and laying of Vinyl flooring for Boiler No.6 and 7 control room during shutdown at TNPL Unit I
Residual Current Operated Circuit Breakers (RCBO) with Integral Overcurrent Protection ISI Marked To IS 12640 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Handling, stacking, destacking and loading of finished paper reels, bundles, copier, Notebooks into lorries, wagons, containers in TNPL Unit I
PROCUREMENT OF 2 NO OF 4 by 3 WAY CONTR VALVE WBS 1-005016-310.90503002, MNR R901208364
Karur corporation_SBM 2.0 2025-26_Construction Of Community Toilet At Padikattuthurai City Cabs Santhu In Ward No.33 At Karur City Municipal Corporation
Supplying Maintenance Staff Through Out Sourcing For Swimming pool in Karur City Municipal Corporation for 1year
Procurement of Semi Automatic Shrink Bundling machine for Packing A3, Folio and A4 Paper Reams
Felt roll changing in PM3 during Annual shutdown in Paper-Mechanical at TNPL Unit I
PM 3-changing of suction couch roll and dryer 1st group suction roll on PM basis.