Loading…
Loading…
150 live113 closing this weekmost from Directorate of Local Bodies UP and Department Of Military Affairs
150 results • Latest
SEE IN TECHNICAL BOQ
SEE IN TECHNICAL BOQ
Diffuser for ETP
Weight Indicator Machine Analog
Repair and Overhauling Service - Split Air Conditioner Including Green Ac (DFM); AIR CONDITIONER SPLIT TYPE 2 TON; Yes; Buyer Premises
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Distribution of bills and collection of property tax payments in all wards under the Nagar Panchayat Khiri
Assembly of PHE SS-316 EPDM 0.5mm Thick for Super heated wash water, Model no. - GLD- 01 13X50, Make
Facility Management Services - LumpSum Based - Industrial; Modification of Existing WIL WK 1500/30 Deg Machine; Consumables to be provided by buyer
Handling and Transport on Lumpsum Basis - Transportation related work for moving sugarcane from various sugarcane research centers to the sugar mill
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work of Drier House Handling; Work of Drier House Handling; Buyer
PURCHASE OF BOXING RING EQUIPMENT, ELECTRONIC SCORE SYSTEM WITH ALL ALLIED ACCESSORIES
Construction of RCC drain in Ward No 12 from KHUTAR ROAD HIGHWAY TO RAMAASRAE
Construction of RCC drain in Ward No 12 from KHUTAR ROAD PULIYA To SWAGAT DWAAR
Construction of RCC drain in Ward No 11 from SAMA house to DHANJU house
Construction of RCC drain in Ward No 11 from RAHISH house to JAMIL house
Construction of an RCC drain in Ward No 09 from Sunil Chopra s house to Rozi Sharmas house
Construction of RCC drain in Ward No 09 from RAJESH BHARADWAJ HOUSE to NARESH SAHAANI HOUSE
Construction of RCC drain in Ward No 09 from KRASHAN MURAARI AWASTHI HOUSE to JANTA SHOO STORE
Construction of an RCC drain in Ward No 09 from LOVLY SHARMA HOUSE to SONU SAHANI house
Construction of an RCC drain in Ward No 06 from SHONU RATHUR to TEEKRAM house
Construction of an RCC drain in Ward No 06 from KHAAD SUSAYTI to SANDEEP YADAV house
Construction of an RCC drain in Ward No 07 from PM SHREE SCHOOL to MUSTAAK house
Construction of an RCC drain in Ward No 05 from Sanjay Gupta House to Ashok Guptas house
Construction of an RCC drain in Ward No 05 from Munna Lals house to Ramchandra Guptas house
Construction of RCC drain from ASHOK GUPTA HOUSE TO MANOHAR HOUSE WARD 05 NAGAR PANCHAYAT MAILANI KHERI
Construction of RCC drain from NP OFFICE TO BALGOVIND HOUSE WARD 01 NAGAR PANCHAYAT MAILANI KHERI
Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 12.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 15.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 17.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 20.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 22.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 25.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 27.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 30.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 35.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 40.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 45.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 50.0 H. P
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work of Bagasse Handling; Work of Bagasse Handling; Buyer
Brass Liner Size- 52" X 42" In Two Pieces ( 7 the number pi ), Brass Linner For 1750 Machine, Front Working Screen ( 2 the number pi )
EPE Make Bladder, Cap. - 35 Ltr. ( 2 the number pi ), EPE Make Liquid Seal Kit ( 1 the number pi ), EPE Make Gas Fill Valve(NRV) Repair With Material ( 2 the number pi )
Silica Gel (V2) Conformingto IS3401 (Q3)
Centrufugal Spare Parts
Hiring of Consultant for Energy Efficiency Services - Consulting Firm; Professional services fro GreenCo certification at Lakhimpur Indane Bottling plant; NA; NA; Onsite; Greenco certification
DEVELOPMENT OF A SITE RETAIL OUTLET AT LOCATION BETWEEN KM STONE NO 20 AND 23 ON SH 93 TOWARDS SHAHJAHANPUR, DISTRICT LAKHIMPUR KHERI, UNDER BAREILLY DO, UPSO-II.
repair and renovation of 10 kwp solar power plant at bop sumer nagar under 39 Bn ssb palia.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of Digital Polari, eter and Spectrometer; Repairing of Digital Polari, eter and Spectrometer; Buyer
KT-1150, 320 KVA D. G. Set, Radiator Fan Drive Shaft Ball Bearing with Plumber Block, S. K. F. make Par
Handling and Transport on Lumpsum Basis - Cane Transportation center from Jhandi
Handling and Transport on Lumpsum Basis - Cane Transportation center from Lakhaha
Handling and Transport on Lumpsum Basis - Cane Transportation center from Jasnagar
Handling and Transport on Lumpsum Basis - Cane Transportation center from Belaparsua