Loading…
Loading…
78 results • Latest
Drainage development from Anjaneyas house on the left side of the conservancy opposite the Chowdeshwari Pure Drinking Water Unit in Maratha Galli Ward No 16 to Shivayogappas house construction of 02 number decks at the 4th cross of Bharampura, Ward No 9 construction of 02 number decks in Kalidasnagar and JC Layout and construction of deck spas in emergency situations at places where necessary as a precautionary measure during the rainy season.
Construction of drain at ward No 7 1st main 4th cross conservency and 4 decksalbs and cc road at tamilians colony
I.V.METRONIDAZOLE, SYP.ONDEM, INSULIN 30.70, INJ PANTOPRAZOLE, INJ BETNASOL, T.RANTIDINE, S.PARACETAMOL 250MG, T.DERIPHYLLIN, I.V.CANNULA 18G, I.V.CANNULA 20G, 10ML SYRINGE, 20ML SYRINGE, INJ METHERGINE, INJ.DICLOFENAC, S.CETRIZINE, T.CETRIZINE, S ONDEM, I.V.SET ADULT, T.ECOSPRIN 75MG, INJ DERIPHYLLIN, INJ T.T, SCALP VEIN SET
Drugs and Consumables
Advance Work for Raising of Plantation at Near Chowdeshwari Temple, 7th Hosakote, Athur RF, Andagove Beat, Athur Section in Kushalnagar Range during the year 2026-27