Loading…
Loading…
20,972 results • Latest
CONSTRUCTION OF NEW L.T.DISTRIBUTION PANEL ROOM AND OTHER ANCILLARY CIVIL WORK AT BDPS.
REPARING OF UTTARAN PASSAGES AT 25, 41 SOUTH TANGRA RD AND SRROUNDINGS IN WD-66
REPAIRING OF UTTARAN PRIVIES AT 15/1 RAMMOY ROAD, 6 SHYAMANANDA ROAD AND OTHER UTTARAN AREAS IN WARD NO -72.
Group maintenance of S and P work in the different Hospital Buildings of J.B. Roy Ayurvedic, Patipukur Ayurvedic Hospital and Sukanta Chatrabas under North Kolkata Health Sub Division- II under Kolkata North Health Division during the year 25-26Ph-II
REMOVAL OF CHOCKAGE OF UTTARAN SEWERAGE SYSTEM AT G J KHAN RD, SOUTH TANGRA RD, C N ROY RD AND SURROUNDING AREAS IN WARD NO. 66
Erection of temporary pandel, platform and stage in front of Rishi Aurobinda Statue on the occasion of Birth anniversary on 15th August, 2026
RENOVATION OF UTTARAN PRIVY AT 97/5, 105/4 HAZRA ROAD AND OTHERS IN WARD NO. 84.
REPAIRING OF UTTARAN PASSAGES AT 39 C N ROY RD, 171 P G RD, 143/125 P G RD AND SURROUNDINGS IN WD-66
Setting up 1 one no new office store room and minor repair works at ground floor and basement at UTTIRNO building during the year 2023_2024
Repair of damaged Lock Gate near Baje Kadam Tala Ghat beside of Strand Road in Kolkata Maidan area during the year 2026-27.
Repair and Renovation to the quarter at ADM Bungalow 1st floor right side during the year 2023_24
Facility Management Services - LumpSum Based - Preservation Re Preservation activities of certain equipment for Project 17A; Preservation Re Preservation activities of certain equipment for Project 17A; Consumables to be provided by service provider ..
Renovation and revamping the roof treatment for CPWD Electrical Sub Station at CGO Complex, DF Block, Salt Lake, Kolkata during 2026-27.
Repairing and Revamping work and Roof grading of lift machine room at A & B wing at CGO Complex, Salt Lake, Kolkata during 2026-27.
Comprehensive Major Renovation and upgradation (Civil & Electrical) of Hostel Building at Regional Labour Institute (RLI) Kolkata. SH: Hiring of one Non-AC Commercial Transport Registration Inspction Vehicle for official use of AE-II, O/O the EE, Kolkata - III,CPWD, Kolkata.
Renovation & Revamping of Qtr No 557 Type III, at CPWD GPRA Quarters Old Campus at AF Block Salt lake Kolkata during 2026-2027.
A/R & M/O GPRA at AF Block (New Campus), Salt Lake, Kolkata during 2026-27. SH: Repairing & Replacement of waste line for the quarter no (65-80, 129-144, 145-160)
DEVELOPMENT OF UTTARANS DRAINAGE SYSTEM AT 109/2, HAZRA ROAD IN WARD 84.
Day to day electrical supervision and minor maintenance work at G plus 5 logistic Hub, Garden Reach for one year
Repair and renovation of Strong Room in DM Court Chamber at Collectorate compound during the year 2023_24
SAFETY PRECAUTION BY INSTALLATION OF INSULATING MATERIALS ON THE EXISTING STREET LIGHT POLES AT AROBINDA PALLY,KK ROAD AND SURROUNDING WATER LOGGING AREAS IN WARD NO-122 UNDER BR-XIII.
REMOVAL OF SILT FROM SATGHARA SEWER LINE (450 MM DIA ) FROM SOFI KATHGOLA TO BORO MASJID AND ITS SURROUNDING AREA IN WARD NO 140, BR-XV.
Framing of temporary toilet at PWD Tent, Maidan during the year 2026-27.
MAINTENANCE OF UTTARAN DRAINAGE SYSTEM AT 16/C, 18G M. P. ROAD AND OTHERS IN WARD NO. 84.
Minor repairing works of the office chamber of Senior officer CID WB at 4th floor Bhabani Bhaban Main Building Alipore during the year 2023_2024
SITC of PMI for FDA Panel at Abinash Dutta Maternity Home within the jurisdiction of R.G.Kar MC and H ES-II
RESTORATION OF PASSAGE AT SRIDHAR ROY RD, CHOWBAGHA RD, C N ROY RD AND SURROUNDINGS DISTURBED BY CESC IN WARD-66
REPAIRING AND RENOVATION OF EXISTING STREET LIGHTING SYSTEM AT HARIDEBPUR AREA,BANAMALI BANERJEE RD,DAKSHIN PARA AND OTHER DIFFERENT AREAS IN WARD NO- 122,KMC.
MENDING AND MAINTENANCE WORKS OF DIFFERENT DIA. F/W PIPE LINE LEAKAGES, WITH ALLIED WORKS NEAR 876, HO-CHI-MINH SARANI, 16 FT. RD.NEAR SAPTARSHI CLUB , 2/1, KALIPUR RD., 85/4, L.N. MOTILAL RD. ETC. IN WD. NO. 128 (BR. XIV)..
REPAIRING OF PASSAGE AT 177, P G ROAD, 28 K N SEN ROAD, 22 BAKULTALA ROAD AND ITS SURROUNDING AREA IN W/67
Repair and renovation of MT Section CID West Bengal at 3rd floor of Bhabani Bhaban Main Building Kol 27 during the year 2023_24
REMOVAL OF CHOKAGE IN SEWER AT 25, 26, 27 PULIN KHATIC RD, 69, D C DEY RD, 47, CHRISTOPHER RD AND ITS SURROUNDING UTTARAN AREA IN WD 58
CONSTRUCTION OF GULLEY PIT TO PREVENT WATERLOGGING AT JBS HALDANE AVENUE IN WARD 58
DEVELOPMENT OF BUSTEE AT 9B, MATHUR BABU LANE AND ITS SURROUNDINGS IN W/57
Construction of ramp at main building and toilet block for students with facility for specially abled pupils of Institute of Education for Women within Hastings compound at Alipore Kolkata 700027 under Alipore Division PWD
MAINTENANCE OF UTTARAN SEWER SYSTEM AT GANESH GHOSH LANE, SOUTH TANGRA RD, CHOWBAGHA RD, C N ROY RD AND SURROUNDINGS IN WD-66
REPAIRING AND MAINTENANCE OF DAMAGED PORTION OF 750 MM DIA WATER MAIN BY M.S JACKETING AT RAJA RAMMOHAN ROY ROAD NEAR MUCHI PARA MORE IN WARD NO. 121, BR. XIV..
RESTORATION OF PAVER BLOCK AND IPS FOOTPATH AT 107/2A M. P. RD, 81/A S. P. MUKHERJEE RD AND 25B. PAL RD AND OTHERS IN WARD NO- 84 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
REPAIRING OF WATER TRENCH AT SRIDHAR ROY RD, P G RD, G J KHAN RD AND SURROUNDINGS DISTURBED BY W/S DEPARTMENT IN WD-66
URGENT REMOVAL OF CHOCKAGE / COLLAPSE SEWER / DAMAGED SEWER LINES ETC. IN WARD NO 58, BR-VII
REPAIRING AND MAINTENANCE OF WATER SUPPLY PIPELINE AND ITS RELATED WORKS AT DIFFERENT PLACES IN WARD NO 121 UNDER BR XIV
URGENT REPAIRING OF POTHOLES AND ROAD IN WARD NO 66, BR VII
Renovation of the Ejlash of Chief Judicial Magistrate Court South 24 Parganas Alipore Kolkata 27 During the year 2023 2024
Urgent repairing and replacement of SubStation equipment for restoration of break down of 11KV 415V Indoor type Sub Station at Behala Fire Station under South 24 Parganas Division, WBFES
PROVIDING AND FIXING M H COVER / G P COVER / C P COVER / INSPECTION PIT COVER IN WARD NO.66, BR-VII
Construction of Gplus2 Storied Building for 50 beded Critical Care Block at Kolkata Police Hospital, Annex-VI of IPGMER - SSKM Hospital centre of Excellence), Kolkata-Balance EI Work Compound illumination, LED Signage
Supply, delivery, erection, testing and commissioning of wall mounted, 5 Star, BEE Rating, Inverter type Split AC Machines having Capacity 48 Nos X 2 TR for replacement of existing AC Machine. Condenser and Evaporator unit of the stated AC Machine
Repair and Maintenance of Outside of IPS Quarter at 11 National Library Avenue Kolkata 700027 for the financial year 2024 25
REPAIRING OF WATER PIPELINE LEAKAGES NEAR OXYTOWN ROAD,BANERJEE PARA ROAD, KASTO DANGA ROAD,JOTE SHIBRAMPUR SCHOOL, INSTALLATION OF VALVE NEAR NASKAR PARA 1ST BYE LANE AND RELATED WORKS AT OTHER LOCATIONS IN WARD-127, BR-XIV..