Loading…
Loading…
4,034 results • Latest
Blood Collection Tube (Q2), Blood Collection Needles (V2) (Q2) (3 (3 ))
Annual Plan-Clappana GP S0193/26- Electrification of Govt. Homoeo Dispensary
Annual Plan-Clappana GP S0 167/25- Construction of Anganavadi No 1 Ward No 12 - Electrification
Annual Plan-Clappana GP S0 0099/26- Maintenance of High Mast Lights-General Electrical Work
GENERAL-Upgradation of Coastal Roads in Kollam District -Upgradation of Fishermen Colony Anganwadi- Valavil veedu road in ward No. 3 of Neendakara Grama Panchayath in Chavara LAC-General Civil Work
Elampalloor Grama Panchayath 2024-25 Revathy Bhavanam To Achu Bhavanam Road Concreting and Construction Of Side Protection Wall in Ward-6
Retender Annual Plan-Elampalloor Gramapanchayat 2024-25 Rennovation of pond
Retender-Annual Plan-Elampalloor Gramapanchayath 2024-2025 Maintenance work of compound wall in GovtUPS Perumpuzha-Project No 270
Supply of Gravity Spiral Separators (1 bank x 12 nos x 3 starts) along with accessories, Supply of Gravity Spiral Separators (1 bank x 8 nos. x 3 starts) along with accessories
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) ( PAC Only ) ( ( 3 3 ))
SO 288/2025-26-CANAL ST ANTONIES BHAVANAM ROAD CONCRETING SECOND REACH IN WARD 11
SO 273/2025-26-CONSTRUCTION OF FOOTPATH FOR BRC
GENERAL-Budget 2025-26(Substitution work) - Improvements to Kottarakkara Chanthamukk - Marthoma Church - Nadukkunnil - Kripa Nagar Road -Overlay to Concrete roadway-General Civil Work
GENERAL-Maintenance of quarter HC 13 in Asramam Police Quarters, Kollam-General civil work.
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Chelakkappally - Mylomkulam Road-Surfacing-General Civil Work
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Panayil - Kalappila Road- By providing Side Protection Wall and Road concrete-General Civil Work
DEPOSIT Construction of compound wall with entrance gate and providing False ceiling work for the roof truss portion of ceiling for the Second Floor of the existing lab library building to IHRD Polytechnic College General Civil Work
Entry and Mid Level Desktop Computer (Q2), Entry and Mid Level Laptop - Notebook (Q2)
CHIRAKKARA GP 102/25-26-CHIRAKKARATHAZHAM PANCHAYATH OFFICE ROAD MAINTENANCE WARD10
CHIRAKKARA GP 78/26-PLAVARAKKUNNU CAPEX ROAD DRAIN CONSTRUCTION WARD4 5
Annual Plan-2025-26, Clappana GP , Project No 181-Maintenance of Conference Hall in Varavila LPS
E TENDER FOR SALE OF SCRAP ITEMS
Pole Numbering and consumer indexing at Section area of Electrical section Perinad
PWD WORKS
Project no-1509 - VADAKKEVILA ZONAL, DIV-34 RENNOVATION OF DRAINAGE COVERING SLAB NEAR S K STORE AT PALATHARA MULLUVILA ROAD
Proj 1489/25-26 Maintenance of Ayurveda Hospital in Division No 37
Retender 289/25-26 Construction of side drain and road renovation in Kokkumoola-Bhadramoorthi road in ward-11
Proj 1488/25-26-Maintannance of Anganwadi No 55 in Division 38
MAINTANANCE OF PEROOR GOVT MVHSS IN KOTTAMKARA GP-KLMJP 2022-23P.No-433/22
635/2025 division 21-Moonnamkutty Library Painting and Maintenance
CHIRAKKARA GP 81/26-MUKKATTUKUNNU KALANGARA ROAD ODA NIRMANAM WARD8
58/25-26 Mallassery Poreekkal Bhagam Road Maintenance Ward - 9
Annual Plan-2025-26, Clappana GP, Project No 101-Providing Art Painting to Various Anganwadi
1467/2026-Maintenance of Mangad LPS in div 21 of Kilikolloor zonal Kollam Corporation
CHIRAKKARA GP 93/26 KUPPANA KULAM SAMRAKSHANAM
PROJECT NO 1482/2026-CONSTRUCTION OF FIRST FLOOR TO KOIKKAL HIGHER SECONDARY SCHOOL BUILDING
Project-No-147/26-Moozhiyil Road Concreting in Anchal Grama Panchayath
GENERAL Budget Work 2025 26 Substitution work Improvements by providing concrete pongodu puthuveedu road General Civil Work
GENERAL-Budget work 2025-26 Connectivity Roads under Kottarakkara LACSretch 8- Vallam Bharnikkavu vila Bhagam Road including Ashraam Road - General Civil Work-General Civil Work
SUPPLY OF STRUCTURAL STEEL
Plaster Cutting Machine (V2) (Q2)
Constructing 11 kV line with Racoon from Chethady to Chempakamukku (CW-4590-202526-65) of Electrical Section Chengamanad under Electrical Division Kottarakkara
Deltamethrin Water Dispersible Powder (WP) (V2)
GENERAL Budget Work 2025 26 Substitution workImprovements by providing concrete road from veliyam junction to thundazhiyathu kavu road General Civil Work
LAC ADS MLA ADS 2025 26 Arayalmuk Kakkakunnu road tarring and side concrete in Sooranad South GP in Kunnathur LACGeneral Civil Work
MS PLATES IS 2062
DEPOSIT-Kollam Port-Maintenance of godown near facilitation centre-General Civil Work
Blood Collection Needles (V2) (Q2)
Hiring a Contract Diesel Jeep 1500 CC above below 15 years age including driver for 1 year under Electrical Section Pattazhy
Entry and Mid Level Laptop - Notebook (Q2), Scanner (V3) (Q2) (3 (3 ))