| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC POONJIRIKKAL MAVELI PANMANA PO CHAVARA 691583 | KOLLAM | KERALA | 691583 | ₹49.8 L | L1 | Accepted-AOC agreement executed |
| 2 | L2₹50.5 L+₹67,951.68 (1.36%)Rejected-Finance | ₹50.5 L+₹67,951.68 (1.36%) | L2 | Rejected-Finance l2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | RAHIM A L3 | ANZAR ABDUL AZEEZ L4 | SUNEER A L2 | SURESH PILLAI G L1 | Swagath, Government Contractor L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00First floor construction of bodhini Buds school | ||||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.8 | cum | 3,308.21 ₹5,954.78 | 3,451.58 ₹6,212.84 | 3,271 ₹5,887.8 | 3,212.9 ₹5,783.22 Lowest | 3,671.89 ₹6,609.4 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 4.21 | cum | 1,918.89 ₹8,088.12 | 2,002.05 ₹8,438.64 | 1,897 ₹7,995.86 | 1,863.61 ₹7,855.12 Lowest | 2,129.84 ₹8,977.28 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 100.1 | sqm | 908.66 ₹90,957.77 | 948.04 ₹94,899.75 | 898 ₹89,890.7 | 882.48 ₹88,337.13 Lowest | 1,008.55 ₹1,00,956.86 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11 | cum | 11,507.17 ₹1,26,590.38 | 12,005.85 ₹1,32,076.36 | 11,380 ₹1,25,191.38 | 11,175.66 ₹1,22,943.44 Lowest | 12,772.18 ₹1,40,506.75 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,969.6 | kilogram | 101.29 ₹8,07,241.09 | 105.68 ₹8,42,227.65 | 99 ₹7,88,990.7 | 98.38 ₹7,84,049.54 Lowest | 112.43 ₹8,96,022.47 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 60.26 | cum | 12,110.77 ₹7,29,782.89 | 12,635.61 ₹7,61,409.22 | 11,977 ₹7,21,722.04 | 11,762.14 ₹7,08,774.79 Lowest | 13,442.14 ₹8,10,009.91 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 132.28 | sqm | 687.32 ₹90,922.13 | 717.11 ₹94,862.9 | 679 ₹89,821.52 | 667.52 ₹88,302.88 Lowest | 762.88 ₹1,00,917.58 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 57.94 | sqm | 920.72 ₹53,342.83 | 960.62 ₹55,654.48 | 910 ₹52,721.76 | 894.2 ₹51,806.37 Lowest | 1,021.94 ₹59,207.12 |
| 1.01 | 5.9.20:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick | 288.33 | sqm | 965.45 ₹2,78,370.13 | 1,006.35 ₹2,90,162.91 | 953 ₹2,74,780.4 | 936.77 ₹2,70,100.77 Lowest | 1,071.59 ₹3,08,973.69 |
Tender Value
₹56.9 L
EMD Value
₹50,000
Closing Date
25 May 2026, 6:00 pmClosed
SE, Kollam municipal corporation
SE, Kollam municipal corporation
PROJECT NO 1482/2026-CONSTRUCTION OF FIRST FLOOR TO KOIKKAL HIGHER SECONDARY SCHOOL BUILDING
2026_LSGD_851142_3
PC4/1324148/2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kollam Municipal Corporation
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
25 Jun 2026
15 May 2026
28 May 2026
15 May 2026
25 May 2026
15 May 2026
15 May 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1First floor construction of bodhini Buds school | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.003 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.4 | sqm | - | - |
| 1.004 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kilogram | - | - |
| 1.006 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.008 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - |
| 1.009 | 5.9.20:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick | 0.8 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438403.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.03 MB
Tendernotice_4.pdf
PDF • 0.02 MB
Tendernotice_5.pdf
PDF • 0.25 MB
Tendernotice_6.pdf
PDF • 0.16 MB
BOQ_1438403.xls
BOQ • 0.32 MB
1482sbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .