Loading…
Loading…
4,035 results • Latest
DEPOSIT-SCDD KOLLAM- CCTV-Supply and Installation of CCTV at District SC Development Office, Kollam-General Electronics Work
Raising 15,000 nos Coir Root Trainer seedlings for public distribution DFEIC, Kottarakkara of Punalur Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Raising 10,000 nos basketed seedlings for public distribution DFEIC, Kottarakkara of Punalur Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Re tender - MLA-SDF-2024-25 Chadayamangalam LAC Construction of Pullanipacha Thondamkonam Palamkonam Ela Road-in Velinalloor GP-General Civil Work
Purchase of Lab Reagents for the period 01.06.2026 to 31.03.2027
Re tender - MLA-SDF-2024-25 Chadayamangalam LAC Construction of Paloor Junction Manaluvattom Road-in Ittiva GP-General Civil Work
GENERAL WORK ANNUAL PLAN- KOTTARAKKARA MUNICIPALITY PRO.NO.451/26 KOLLAMVILA ROAD CONCRETE WARD 1
Annual Plan-2025-26 CDLM BP Renovation of public health unit and related works in Nilamel CHC-Pro no. 262/26-General Civil Work-REETENDER
HORMONE ANALYER REAGENTS
Raising 10,000 nos Coir Root Trainer seedlings for public distribution in Anchalummoodu block of Kollam Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Annual Plan-CDLM BP. 2025-26 Construction of Hand rail and steps for SC family of thottumkara in veykkal ward of MaramkuzhI Vattappara road in Nilamel GP-Pro No.78/26-General Civil Work-REETENDER
BIOCHEMISTRY ANALYSER REAGENTS
Raising 15,000 nos basketed seedlings for public distribution in Anchalummoodu block of Kollam Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Annual Plan-CDLM 2025-26 Construction of compound wall in Vadakkenagar SC community center arkannoor ward in Chadayamangalam GP-Pro No. 246/26-General Civil Work-REETENDER
IMPROVEMENTS TO MARUTHAMON CHURCH OF GOD MARUTHAMON ELA ROAD IN WARD 8
Improvements to Meloottu Kalari - Panchayath Kulam Ela Road in ward 14
Annual Plan PROJ NO 83/25-26-KULAPPURAM NETTOOR ROAD MAINTANENCE WARD 3 IN VILAKKUDY GP-General Civil Work
RETENDER OF PROVIDING ADDITIONAL FACILITIES TO MUKKOOD U.P SCHOOL
This work consists of Construction ofEarth work excavation,PCC,Centering and shuttering, Reinforced concrete, Random Rubble masonry, Solid block masonry,Steel reinforcement for RCC work, Plastering works,Aluminium works Tile Flooring, Painting works
CMLRRP 2.0 2024 25 Edakkara Parappumattel Road
This work consists of Construction ofEarth work excavation,PCC,Centering and shuttering, Reinforced concrete, Random Rubble masonry, Solid block masonry,Steel reinforcement for RCC work, Plastering works,Aluminium works, Tile Flooring
RETENDER OF IMPROVEMENTS TO IDAKKARA STEP ROAD IN WARD 10
EENCHAYIL DRINKING WATER PROJECT IN WARD 10
IMPROVEMENTS TO PUMPHOUSE PANAYAMCODE ROAD IN WARD 9
AMC/CMC of Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler System
Renovation of Nursery shed at DFEIC Kottarakkara
SUPPLY OF STRUCTURAL STEEL
Annual Plan-KARIKKATHIL PADIKKAL PALANI HOUSE ROAD SECOND PHASE KPZA - 390/25-General Civil Work
Paper-based Printing Services - Printing with Material; Register; Offset, Paper-based Printing Services - Printing with Material; card file cover and file pad; Offset
GENERAL Providing Drainage facilities Providing drainage facilities in Parippally Kalluvathukkal via Meenambalam road and Chathannoor Kattachal road General Civil Work
Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3)
PulleyGear-L_SB4270001_SEW_EP2, CrossRoller_SB6488001_SEW-EP2, InsideCover_R- Assy_SB5072001_SEW_EP2, InsideCover_L- Assy_SB5073001_SEW_EP2, BearingHolderSpacer_SB4364101_SEW_EP2, ThreadBreakageDetector_SB6587001_SEW_EP2, ThreadRetainer_SB2636001_SEW_EP2, ThreadTrimmerSolenoid_SB6577001_SEW_EP2, MovableKnife-H-Assy_SB7053001_SEW_EP2, FixedKnife_FL_SB7055001_SEW_EP2, NeedleHolePlate, M- KnifeSpacer_T0.25_SB3049001_SEW_EP2, M- KnifeSpacer_T0.35_SB0955001_SEW_EP2, PlungerRubber_SA9853101_SEW_EP2, X-FeedBracket-S- Assy_SB4344101_SEW_EP2, WorkClampAssy_311H_AIR_SB4454001_SEW_EP2, WorkClampLifterLever_R_AIR_SB4371001_EP2, WorkClampLifterLever_L_AIR_SB4370001_EP2, Driver_SA6448301_SEW_EPP_P.67, SA2173301 Shuttle Hook Assy, Work Clamp Pressure Foot, S42843001, BallBearingBush_SA3206001_SEW_EPP, Joint- G_SA4608101_SEW_EPP, BELLOW PRESSURE F_SB4361001_SEW_EP2, WorkClampLifterLever_AIR_SB4369001_EP2, WorkClampSliderAssy-L_SA4714001_NSEW_EPP, WorkClampLifterLever_4738001_SEW_EP2, D- TensionAssy_SB6468002_SEW_EP2, ThreadTakeUpSpring_6193001_SEW_EP2, S25279101 Set Screw CP, MovableKnifeCollar_S00705001_NSEW_EPP, MovKnifeShoulderScrew_SA4518001_NSEW_EPP, ThrustWasher_SA4519001_NSEW_EPP, Arm Thread Guide B, SA4333001, ArmThreadGuide-C_SA6391001_SEW_EPP, Arm Thread Guide D, SB1086001, disc-Tension-145446001, ThreadGuideArm_SA8691001_SEW_EPP, N- Bid Number : GEM/2026/B/7112502 Dated : 23-01-2026 Bid Document 1/54 Item Category BarBushThreadGuide, D, SA3258001_SEW_EPP, AdjustingStud_SA3238401_SEW_EPP, ScrewPan_M4X8_062400816_SEW_EPP, SPRING- COMPRESSION_SA3313101_SEW_EPP, SPRING, EXTENSION_SA3321001_SEW_EPP, EPP_SCREW, _SM3.57-_40X6_L_145465001_SEW, EPP_SLIDE_BLOCK_GUIDE_SA3528001_SEW, EPP_SETSCREWSOCKETFT_M6X6_12060636_SEW, EPP_BALL_BEARING_6904DDUNR_SA4179001_SEW, EPP_BALL_BEARING_6904DDU_SA4180001_SEW, EPP_BALL_BEARING_6204DDUNR_SA4178001_SEW, EPP_BoltSocket SPwsr M5X12_S55485001_SEW, EPP_WorkClamp_Guide_A_ASSY_SA4863001_SEW, EPP_NUTFT, _M_6_SA3227001_SEW, EPP_SCREW_M3X4_SA4199001_SEW, EPP_LOWER_SHAFT_ASSY_SA4783101_SEW, EPP_COLLAR_TR_-TRIMMER_SA3310001_SEW, EPP_SET_SCREW, _M4X5_S46903001_SEW, EPP_CUSHION_154596000_SEW, EPP_TENSION_RELEASE_ASSY_SB4467001_SEW, EPP_SCREW_PAN_M5X8_62500816_SEW, EPP_WorkClamp_Guide_B_Assy_SA4864001_SEW, EPP_WorkClamp_RetainerAssy_SA4706101_SEW, EPP_CollarPresserBarSpring_SA5301001_SEW, TIMING PULLEY_SB4406001_SEW_EPP, EPP_BearingHousingAssy_SA6451101_SEW, EPP_PRESSURE BAR CLAMP_SA4778001_SEW, Shoulder Screw, 6-1.8 SA4354001, SET screw collar UNO S25454021, SPRING_SA2287001_SEW_EPP, SA5219001 Thread Wiper Rod, Washer UNO 110735022, S03677001 Washer, EPP_Brother Grease Unit_SEW, Y- FeedBase_SB4185301_SEW_EPP, Tension_Nut_S31032002_SEW_EPP, SA3254001 Tension Bracket, SA3255001 Tension stud, Set screw, SM3.57 100402004, Washer_S20681000_SEW_EPP
Annual Plan-PERAYAM GP-Electrification of Perayam MCF building in PERAYAM GP-General Electrical Work
Entry and Mid Level Desktop Computer (Q2), Entry and Mid Level Laptop - Notebook (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
Reconductoring 11 KV line from Rationkada to Palakuzhy using covered conductor and stringing new 11 kV -work code (CW-4582-202526-58)under Electrical Section Ezhukone of Electrical Division Kundara
GENERAL Collector Bungalow Kollam Replacement of faulty Yard lights fixtures General Electrical Work
SUPPLY OF CAST TUNGSTEN WIRE 230 MICRON SPOOLS OF 250 GRAMS
DEPOSIT AMC 2025 2026 Causality Block Anticipated electrical maintenance in the existing electrical installation in Casualty Block at Government Medical College Parippally Kollam for one year General Electrical Work
Cost of planting and three year maintenance of 2026 Macaranga peltata,Ailanthus tryphysa,Alstonia scholaris in block X bit IV, part II Olakathumpara,Anakulam sub unit III, Thiruvananthapuram Division during 2026-27 to 2028-29
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
242/26 malankkavu anganvadimaintenance ward 3 KADAMPANAD GP
Entry and Mid Level Laptop - Notebook (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
Sodium Hypochlorite Solution (V3) Conforming To Is11673 (Q3)
Cost of planting and three year maintenance of 2026 Tectona grandis in Block V, Nursery yard (0.66Ha),Kandanchira, Anakulam Sub unit III, Thiruvananthapuram Division during 2026-27 to 2028-29
Composter for Solid Waste Management (Q3) (3 (3 ))
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MLA-ADS-Construction of Thejas nagar road Vayanakulam road and branch lines-Interlock laying- in Kayyalakkal division of Kollam corporation
FABRICATION AND SUPPLY OF IDLERS AND ROLLERS AS PER
GENERAL General Budget 2024 25 Balance work Vertical extension of New building for University Institute of Technology Sasthamcotta Construction of First Floor General Electrical Work
374/2025-26-DIV 49 CUTCHERY - VARIOUS ROADS IN T.D ROAD ANAKKUZHY BYPASS NEDIYATH KOTTAMUKKU VIDHYADHIRAJA BYROAD, MANA MANDHIRAM SOUTHSIDE DRAIN CONSTRUCTION INTERLOCKING,MOOTHAKKARA UNITYLANE, CO-OPERATIVE COLONY, NEELAMTHOTTAM KCC CLUB CHITTOOR