95 live70 closing this weekmost from PRED and South Coast Railway
95 results • Latest
Electrical Construction/BZA - Vijayawada division - Electrical arrangements for Phase II Platform extension works i.e COP, FOB, Platform lighting at Yerrupalem, Cheruvumadhavaram, Gangineeni stations including approach road lighting for Ballast siding of South Coast Railways.
Consruction of Compound wall and Walking track at Bhaskarapuram Park beside of ELSR in 12th Division of Machilipatnam Municipal Corporation.
Construction of Compound wall and Shelter to Hindu Burial Ground, in Gilakaladindi, Division No.20 in Machilipatnam Municipal Corporation.
Providing assistance to the Electrical shift operator and checking of healthiness of vibrating feeders of Wagon tippler 1 to 4 motors, 1A/1B/1C/1D, 6A/6B, 2A1/2B1, 2A2/2B2, 7/8 conveyor, 3A1/3B1, 9A/9B, 3A2/3B2, 4A1/4B1, 4A2/4B2 , 4C2/4D2, Belt feeders, crusher 's motors, Yard conveyors 10&11, Stacker/Reclaimer-1&2 electrical motors and Bunker trippers- 5A, 5B, 5C & 5D in Stage-I & II /CHP/ Dr NTTPS as and when required during the period from 01-10-2026 or from commencement of work to 31.03.2027.
Different types of mechanical maintenance works as and when required at MM-I sub division of CHP-III/ Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Different types of mechanical maintenance works as and when required in MM-IV sub division of CHP-III/ Dr.NTTPS from 01-10-2026 or from the date of commencement of work to 31.03.2027
Replacement of damaged mother and liner plates in 12A/B, 13A/B, 14A/B, 20, 21, 25 conveyors, vibrating feeders, hopper discharge chutes, hopper grid pieces, rail table platform, spill plates, chequered plates and I-Beam of weighment table of wagon tippler-5&6 in MM-I/CHP/Stage-III/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Vijayawada Division - OHE modification works in connection with removal of Infringing OHE structures on Dr. NTTPS siding line near KI station.
BZA division -Provision of Electrical arrangements for the left over works at Tadepalligudem and Gunadala Railway stations [Phase II].
Providing PWS Scheme in Mallampudi Panchayat in Bantumilli Mandal Est Cost Rs:35.00 Lakhs
Providing drinking water facilities NDRF at Kondapavuluru village of Gannavaram mandal,Est Cost Rs 20.00/16.20 Lakhs (Part-B)
Providing Mosquito Mesh to Govt BC College Boys and College Girls Hostels at Vijayawada (Central, East, West - 6 Works) in NTR District
BZA division -Provision of Electrical arrangements for the leftover works at Narasapur Railway station [Phase II].
System Improvement Project Works for 1) Erection of 33KV double circuit line from 220/33KV Gopavaram sub-station for providing alternate supply to 33/11KV Varahapatnam and 33/11KV Pallewada sub-stations in operation section Kaikaluru Rural 2) Erection of 33KV double circuit line from 220/33KV Gopavaram sub-station for providing alternate supply to 33/11KV Kalidindi and 33/11KV Arutegalapadu @ Kallapalem sub-stations 3) Erection of 33KV double circuit line from 220/33KV Gopavaram sub-station for providing alternate supply to 33/11KV Korukollu and 33/11KV Mulalanka sub-stations in Operation Section Kalidindi of Kaikaluru sub-division in Gudivada Division of Krishna circle under T&D Improvements on turnkey basis
Notice Inviting e-Tender (NIET) - Licence for Concession to Supply, Install, Test, Commission (SITC) and operate Automated Vehicle Parking Management System, Collection of Parking Fees and Lane Pick-up Fees Rights at NITB of Vijayawada Airport
Widening of Perimeter Road in operational area at Vijayawada Airport. SH Civil Works
Poking of Bunkers of Stage-I&II from bunker floor for establishing coal flow to the mills of Units 1,2,3&4 while mills are in service in MM-II/CHP-I&II/Dr.NTTPS as and when required during the period from 01-10-2026 (or) from the date of commencement of work to 31.03.2027
Attending Various Emergency Mechanical Maintenance Works In Maint.-I (Crushers) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS, Like Replacement of Various Bearings, Plumber Blocks and Shafts Of Crushers/Vibrating Screens And Replacement Of Pullies( DE And NDE) , Bearings And Sleeves For Belt feeders And Dust Extraction System Of M-1 Crushers as and when required during the period from 01-10-2026 or the date of commencement of work to 31.03.2027.
Repairs & Brightening to service buildings , Gate lodges and Improvements to Road at LC gates in ADEN/OGL & NLR sub-division under Sr.DEN/South/BZA jurisdiction for GM Inspection
Supply, Transportation, Installation and Commissioning of 430 KW Solar Power Plant at Krishnapuram, Gosala
Construction of Community Hall for Women Empowerrment in Urivi Village of Pedana Mandal. EST.COST : Rs.25.00 lakhs
Construction of Community Hall for Women Empowement in Atchayyavaripalem Village of Pedana Mandal. EST.COST :Rs.25.00 lakhs
Construction of Walking Track in ZP High School of Godavarru Village of Kankipadu Mandal EST.COST : Rs.10.00 lakhs
Comprehensive License for Executive Lounge in Domestic Security Hold Area (DSHA) and International Security Hold Area (ISHA) and Meet and Greet Services at New Integrated Terminal Building (NITB) of Vijayawada International Airport.
Conversion of 132KV Single ASCR Moose Conductor Bus to ACSR Moose Conductor Twin Bus for strengthen of Bus under RMI- 2025 -2026 at 132 KV Sub-Station Rangannagudem in Krishna District.
Conversion of existing 132kV ACSR Twin Zebra Bus conductor with ACSS Twin Moose conductor at 132/33kV SS Pamarru in Krishna Dt
Replacement of 2Nos 132KV Bus sections(132KV PTRs LVs , 132KV RTSS connected and 132KV Pamarru-1,2 & Konikepudi feeders connected) of Single ACSR Zebra conductor with Twin ACSS Moose conductor on TND Structures at 132KVSS Machilipatnam in Krishna District.
Supply and delivery of 5 Nos 50 HP Tractor and 10 1/2" x 6"x 18" to 20" Two wheeler trailer including insurance and registration to Gudivada Municipality under Tied Grant of 2020-21 (1st Installment) in 15th FC Grant 2nd Call
Supply and Delivery of 74 HP back hoe loader (JCB) for Mechanical Cleaning of Major Drains and Maintain of Solid Waste at processing plants in Gudivada Municipality under Tied Grant of 2020-21 (1st Installment) in 15th F.C. grant 2nd Call
Construction of CC Drain from Ambedkar Statue to existing CCroad in sc locality of Pedapatnam Village of Machilipatnam Mandal Est Cost Rs:7.50 Lakhs
Handling and Transportation at Nagayalanka (Own)
Entryand Mid Level Desktop Computer (Q2)
Providing Gravity main from Arjavanigudem OHSR to Arjavanigudem Sump in Arjavanigudem H/o Pedatummidi GP of Bantumilli Mandal Est Cost Rs:8.00 Lakhs
Construction of Compound Wall to Anganwadi Building in Komatigunta (H) of Tenneru (V), Kankipadu (M). EST.COST : Rs.8.00 lakhs
Re-Construction of Temple to Sri Chennamalleswara Swamy Temple at Penumatcha (V), Pamidimukkala (M), Krishna District
Cartridge HP Laser Jet Pro MFP 4104dw
Providing 20KL OHSR Tank for pws scheme of Vanapamula Village of Pedaparupudi Mandal Krishna District Est Cost Rs:20.00Lakhs
Construction of OHSR in Raparla Village H/o Raparla Gp pf Pamarru Mandal Krishna District Est Cost Rs:40.00 Lakhs
Construction of CC Drain From Dronavalli Lakshmi House to Panchayat Office of Mamillapalll GP of Pamidimukkala Mandal Krishna District Est Cost Rs:7.00 Lakhs
Construction of Canteen in Rythu Bazar Gannavaram, under Agricultural Market Committee Gannavaram in Krishna district
Desing, Supply, Erection, Testing and Commissioning of (i) Erection of 132KV features at 400/220KV SS Gudiwada with 2*160MVA PTRs (ii) Single LILO of 132kV Pamarru-Machilipatnam DC Line to 400kV SS, Gudivada (6KM DC line from the above proposed LILO point of 132kV Pamarru-Machilipatnam Line to the crossing point of the existing 132KV Kanumolu-Pamarru DC line & 3KM MC Line from the above crossing point to 400KV SS Gudivada) & (iii) LILO of existing 132kV Pamarru-Kanumolu SC line to 400kV SS, Gudiwada on the above 3KM MC Towers
Construction of Anganwadi Center in Dulavanigudem Habitation of Pamulapadu Village of Pedaparupudi Mandal. EST.COST : Rs.16.00 lakhs
Vijayawada Division - Electrical Power Supply Arrangements for 16 No's of Additional Escalators at Amrit Stations.
Replacement of OLD Pipeline at Sulthanagaram Segment area in Manginapudi CPWS Scheme of Machilipatnam Mandal Est Cost Rs:10.00 Lakhs
Providing Drinking Water Facility to Pipeline from Kothapudi to Beach Area of Machilipatnam Mandal Est Cost Rs:20.00 Lakhs
Improvement of SS Tank for Providing Drinking Water Facility to Kothapudi Beach Area of Machilipatnam Mandal Est Cost Rs:20.00 Lakhs