Loading…
Loading…
126 results • Latest
Stock Storage ( SH- Outsourcing watch and ward of Divisional Building , Sub Divisional building , Complaint attandent in surrounding area and other assets in Divisional complex Larji ) for 12 Months
(SH- CC flooring 1, 3,6 ,Plastering of existing channel and raised of Existing channel)
( SH- Providing staff for water testing laboratory at Banjar ) for 6 months
(SH- Operation and maintenance of the Scheme for Six months)
( SH- Providing Laying jointing and testing of HDPE pipe line 25 mm, 32 mm dia from source to Village Shanad and Shazau at various RDs)
(SH- C/O retaining wall plum concrete 1,5,10 to protection for existing channel/kulh at Rds 250 to 259,350 to 364.50 and 550 to 565 near Kalehli)