Loading…
Loading…
1,470 results • Latest
Providing and Fixing Interlocking paver block Tile for widening of road from Bansal Hospital upto Mata ka than on Red Road in MC Ladwa.
Const. of 20 No. Street , 21 No. Street , 22 No. Street , 23 No. Street , 25 No. Street in New Krishna Colony and Prem Vihar MC Ladwa
Const. of Street From H/o Ankush Goyal to H/o Babbu , H/o Afsana to Furniture shop at Hinori Road , Ward No. 07 , MC Ladwa
Const./ Repair of various street in Kailash Nagar, ward no 18, MC Thanesar
Development of Theme Park site at Jyotisar Kurukshetra ( Electrical, AHU, Cables and Insulation )
Const of IPB street along side of Arora Gift Gallery at railway road in ward 21
P/L of IPB and open gym Equipment in Gayani Mehar singh Park, in ward 22, MC Thanesar.
Const. of mastic road from H/O Partap Rana to Madan Lal in ward 19, Shastri Nagar and Patel Nagar. MC Thanesar
Establishment of Reading room in Rajender Nagar community center, ward 22, MC Thanesar
completion of community centre in Akash Nagar, ward -24, MC Thanesar
Replacement of 01 No. 05 Cs VT Pump at 45 Km at village Kirmach.
Supply, errection and Commissioning of 02 No. 05 Cs. VT Pump at Saraswati Feeder at RD 3000 to protect the abadi area of village Jyotisar.
Replacement of 02 No. 05 Cs. VT Pump at Bibipur Lake to Protect the agriculture land and abadi area of village Gadi Rodan.
Supply Erection and Commissioning of 02 No. 5Cs VT Pump at Saraswati Feeder to protect the agriculture land and abadi area of village Murtazapur.
AMtc of roads in Sector 30 Urban Estate Kurukshetra Providing and laying of chequered precast tiles Kerbs and CC 1 1 5 3 for repair of pavement complete in all respect
AMtc of EPHS in Sector 13 UE Kurukshetra Construction of damaged manhole brick work plaster RCC Slab manhole cover complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 5 UE Kurukshetra Supplying of sewage suction tanker 5000 Ltr capacity with tractor and driver with fuel complete in all respect
AMtc of EPHS in Sector 2 UE Kurukshetra Construction and Repair of manhole complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 13 UE Kurukshetra Repair of Staff quarter No 2 in water works Sector 13 complete in all respect
AMtc of EPHS in Sector 30 UE Kurukshetra Construction of sewer manholes with slab and repair of sewer line complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 3 UE Kurukshetra Repair of various size of water supply line and leakage Prov and fixing of DI specials complete in all respect
AMtc of EPHS in Sector 7 UE Kurukshetra Providing and fixing of 100mm id DI pipe line for repair of of water line complete in all respec
AMtc of EPHS in Sector 4 UE Kurukshetra Repair of 25 HP submersible motor pump sluice valve NRV MCCB and Cable complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 3 UE Kurukshetra Repair of 25 HP submersible motor pump lowering pipe sluice valve and panel board complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 7 UE Kurukshetra Repair of Electric Control Panel Board for submersible motor MS pipe and sub cable complete in all respect
AMtc of EPHS in Sector 8 UE Kurukshetra Repair of 25 HP submersible motor pump GI pipe submersible cable complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 30 UE Kurukshetra. Providing and fixing of NRV submersible cable Repair of 25 HP submersible motor pump and gravel complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 13 UE Kurukshetra Repair of 25 HP submersible motor pump non return valve submersible cable complete in all respect and all other works contingent there
Garden Bench (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Tricycle or Rickshaw for Carrying Goods (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Steel Wheelbarrows (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of Mastic Asphalt road from 50 Foota Road to Rajesh Pilot Chowk Ward no. 20
Const. of Road from Narkatari Road to Gayatri Chetna Kendra in Ward No. 30
Construction of Street from Sukhdev saini to jain hospital in ward no 06
Construction of street from Anil Taneja to Balihar Singh in ward no 06
A/mtc of L/s work in Sector-5, U/E Kurukshetra for the year 2025-26.(Repair of Boundary wall of Green belt and all other work contingent thereto.)
A/mtc of L/s work in Sector-3, U/E Kurukshetra for the year 2025 - 26.( Finishing and Planting work of greenbelt and all other works contingent thereto with one year mtc and defect liability period free of cost.)
providing water supply facilities in MGG Basti
Providing and Installing 1 No. New Tubewell
Const. of Street From H/o Kamlesh to H/o vinod , H/o Baru Mistri to H/o Ramnath thekedar and H/o Anguri to H/o Dhana in Ward no. 6 , Mc Ladwa
Providing and Installing 1 No. new PVC tubewell
Providing and installing 1 No. new tubewell in place of failed
Providing water Supply Facilities
Lohar majra Rough cost estimate for Pdg.01 No.High Mast at Lomesh Rishi Tirth in Village Lohar Majra Distt kurukshetra
Construction of 2 No. 10 Feet Span RCC Slab Culvert on L/R from Raipur to Sulakhani in MC Shahabad (Road ID 3868)
Augmentation of 66 KV S/Stn.Jalkheri, from (2x12.5_16 MVA) to (1x12.5_16 MVA plus 1x25_31.5 MVA) 66_11 KV TF
Augmentation of 66 KV Sub Station Nalvi from (2x12.5_16 MVA) to (1x12.5_16 MVA plus 1x25_31.5 MVA) 66_11 KV TF
Construction of 3 No. link roads in MC Babain (Road ID 12627, 12628 and 12630)
Construction of pavered path on left bank of Rakshi Nadi between RD 29800 to 35500 Babain Road to Pipli Road
Amin const. Of b/wall and plaster in Dada Mishri Patti choupal