Loading…
Loading…
1,717 results • Latest
VARUN VIHAR AWASIYA YOJANA KE ANTARGAT SECTOR-4 ME 18MTR CHAURI SADAK PAR SADAK, SEWER, DRAIN, TRENCH EVAM DIVIDER KA NIRMAN VIKAS KARYA.
VARUN VIHAR AWASIYA YOJANA KE ANTARGAT SECTOR-3 WA SECTOR-6 KE MADHYA 30 MTR CHAURI SADAK PAR SADAK, SEWER, DRAIN, TRENCH EVAM DIVIDER KA NIRMAN VIKAS KARYA.
VARUN VIHAR AWASIYA YOJANA KE ANTARGAT SECTOR-5 ME 18MTR CHAURI SADAK PAR SADAK, SEWER, DRAIN, WATER SUPPLY EVAM CULVERT KA NIRMAN VIKAS KARYA.
Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
Construction of 2x40 MVA 132KV AIS S/S Koushiya Sarai, Hardoi on turnkey basis
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of Sluice Ways Liners from SSC to Main Distribution Pit of Ash Slurry Pump House as well as of ESP Area of Unit 4 of 2X500MW; Repairing of Sluice Ways Liners ..
GENERAL INSTRUMENT SET (OPEN SURGERY)
HOSPITAL FURNTIURE FOR ADVANCE PEDIATRIC CENTRE
Portable Brazing Machine