Loading…
Loading…
1,522 results • Latest
AGRA EXPRESS-WAY PAR LUCKNOW SHAHAR ME AAGMAN HETU PRAVESH DWAR KA NIRMAN VIKAS KARYA. (KRISHNA DWAR)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal Power Plant; Overhauling of Rotary APH (Bisector) 2X500 MW BTPS Anpara; Service Provider
TRANSPORT MONITOR
Development of Greenfield, Access Controlled, 6 Lane Expandable to 8 Lane Jhansi Link Expressway Project Package_II From Km 50 to Km 106.30 Km in the state of Uttar Pradesh on EPC Mode.
Development of Greenfield, Access Controlled, 6 Lane Expandable to 8 Lane Jhansi Link Expressway Project Package_I From Km 000 to Km 50 Km in the state of Uttar Pradesh on EPC Mode.
Construction and Improvement of 05 Nos. Long Term Black Spot Rectification Works and 07 Nos. Short Term Black Spot Rectification Works on the Kanpur Kabrai Section of NH-34 from Km 7.430 to Km 130.100 in the State of Uttar Pradesh, on EPC Mode.