Loading…
Loading…
Found 339 active tenders
339 results • Latest
Construction of new studs and revetment in between RD 176650 to 177150 for the protection of 3L bandh (Rour complex) in Distt. Ludhiana.
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge.
Construction of new studs and revetment in between RD 176150 to 176650 for the protection of 3L bandh (Rour complex) in Distt. Ludhiana.
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge.
Construction of new studs and revetment in between RD 175650 to 176150 for the protection of 3L bandh (Rour complex) in Distt. Ludhiana.
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge.
Integrated waste management project for mixed horticulture and organic waste conversion into Biofuel
Integrated waste management project for mixed horticulture and organic waste conversion into Biofuel
Construction of new studs and revetment in between RD 174650 to 175150 for the protection of 3L bandh (Rour complex) in Distt. Ludhiana.
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge.
Construction of new studs and revetment in between RD 175150 to 175650 for the protection of 3L bandh (Rour complex) in Distt. Ludhiana.
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge.