Loading…
Loading…
522 live255 closing this weekmost from Department of Local Government and Department of Water Resources
522 results • Latest
Outsourcing of Labour Part to rectify LD system of various transformers/low-lying PVC cables at road/ street crossings Under City Adda Dakha Sub-division, Adda Dakha Division in Suburban Circle, Ludhiana
Single Use Medical Examination Gloves Conforming to IS 15354 (Part 1) (Q2), Single Use Sterile Rubber Surgical Gloves Conforming to IS 13422 (Q2) (3 (3 ))
O and M including Routine Maintenance and Incident Management of 4 Laning of existing 2 lane with Paved Shoulder Road from Talwandi Bhai to Ferozepur on NH-05 (Old NH-95) from Km 170.000 to Km 194.040 in the State of Punjab.
66KV line from 66KV Jagraon-Rasulpur line T-off for 66KV SStn Bhamipura
145kV SF6 CIRCUIT BREAKERS ALONGWITH VARIOUS ACCESSORIES, SUPPORTING STRUCTURES RETROFITTING O
Request for Proposal (RFP) For Selection of Lead Industry Partner (LIP) for Capacity Augmentation of National Skill Training Institute and Setting up of National Centre of Excellence (NCoE) located at Ludhiana under Component II of the PM SETU
RD 28110-R OF PAKHOWAL DISTY
245KV Potential Transformer and 145KV Potential Transformer
Rate contract for outsourcing of Electrical Wiring work related to Grid Construction activities under TS Organisation.
66KV SC on DC line from 66KV SStn Hi Tech Cycle Valley Dhanansu to 66KV SStn Hawas. (RDSS Work)
245 KV SF6 CIRCUIT BREAKERS ALONGWITH SUPPORTING
Estimate for Relining of Watercourse course by Brick Masonary of Outlet RD 110957- L of Raikot Disty
Const of 4/6L GF Ludhiana Rupnagar NH 205K from Jn with NE to Manewal (Ludhiana) to Jn with NH205 near Bheora (Rupnagar) with Ludhiana bypass under NH(O) in Punjab on HAM PKG 2 DC 37.700 to 66.440 and Ludhiana Bypass DC. 0.000 to 18.500 TL 47.240 km
CONSTRUCTIONS OF PUMP HOUSE INCLUDING ALL PUMP FITTINGS, WALL FITTINGS ELECTRICAL FITTINGS, UPVC UNDERGROUND PIPELINE FOR PROVIDING LIFT IRRIGATION FACILITIES TO VILLAGESEHJO MAJRA, IN DISTT LUDHIANA FROM SIRHIND CANAL RD 107335R
RD 5380-L OF KHANPUR DISTY
CONSTRUCTION OF NEW WATERCOURSE OF OUTLET RD 21000 R OF 2R MINOR OF MALOUD DISTY VILLAGE PANDHER KHERI, RAMGARH SARDARA DISTRICT LUDHIANA
RD 72041-R OF PAKHOWAL DISTY
CONSTRUCTIONS OF PUMP HOUSE INCLUDING ALL PUMP FITTINGS, WALL FITTINGS ELECTRICAL FITTINGS, UPVC UNDERGROUND PIPELINE FOR PROVIDING LIFT IRRIGATION FACILITIES TO VILLAGE MACCHIWRA, IN DISTT LUDHIANA FROM SIRHIND CANAL RD 119450R.
RD 59960-R (SLICE-II) OF PAKHOWAL DISTY
RD 59960-R (SLICE-III) OF PAKHOWAL DISTY
CONSTRUCTION OF NEW WATERCOURSE OF OUTLET OF RD 10236 TR OF PAKHOWAL DISTY VILLAGE JAND DISTRICT LUDHIANA
RD 21534-L OF PAKHOWAL DISTY Village Bhutta
Repair of Police Station Machhiwara, Khanna
52KV Bushing
Labour outsourcing for rectification of low lying PVC cables and network wires
Repair of Police Station Building Type-H at Division No.1, Ludhiana.
4-6 laning of Kharar-Ludhiana section of NH-95 (New NH-05) from km. 10.185 to km. 86.199 Samrala Chowk, Ludhiana in the State of Punjab on Hybrid Annuity Mode (HAM) - Execution of pending overlay and maintenance works at Risk and Cost of the Concessi
Estimate for lining of peori disty RD 20137-26187 (Extension portion) off taking RD 25518/R of Raika Feeder by Concrete lining M-15 concrete mix, mixed in automatic batching and mixing plant, carried to site in transit mixers, laid manually with s
Reconsrtruction of Jangirana Minor From RD 0-3950 offtaking from Peory disty
Estimate for repair of Dholan Disty Head Regulator Gate offtaking RD 126000/L of Abohar
Estimate for Relining/Lining of water course of Outlet RD 20170/L of Balluana Minor
Estimate for Relining/Lining of water course of Outlet RD 28919/TR of Husnar Minor
Estimate for Relining/Lining of water course of Outlet RD 26550/R of Lambi Disty.
Construction/Renovation of water courses at outlet RD 17250/L of 1-R Minor of 3-R disty
Leasing Out Sidhwan Bet Rest House, Village Sidhwan Bet, Tehsil Jagraon, Ludhiana
Outsourcing of Labour Part for the pilot project to rectify low lying PVC cables at road street crossings under City Centre Div unit 1 Ludhiana in respect of City East Circle Ludhiana
Outsourcing of Labour Part for the pilot project to rectify low lying PVC cables at road street crossings under Focal point Div unit 2 Ludhiana in respect of City East Circle Ludhiana
Laying of tower foundations erection of towers and Stringing and Sagging of conductor with earthwire for undergrounding of 66 kV OH line from 220 kV SS Lalton Kalan to 66 kV Gill Road SS at railway crossing on request of Railway Department
For Executing Work Of 66 KV Line T Off from 66KV Ladhowal to GT Road line for 66KV S/S Bahadurke Planning No. 128 CZ 2025 26 Annexure E RDSS Work
Estimate for construction of watercourses for outlet RD 200000/R of Abohar Branch
Estimate for construction of watercourses for outlet RD 104038/L of Kokri Disty
Laying underground pipeline for outlet RD 8465/TL of Bardhal Minor excluding supply of pipe.
Laying underground pipeline for outlet RD 124800/L of Khanna Disty excluding supply of pipe.
Laying U/G pipeline O/L RD 39945/L of Kheri Minor excluding supply of pipes
Laying underground pipeline for outlet RD 11700/R of Ladhran Minor excluding supply of pipe.
Laying underground pipeline for outlet RD 58505/TL of Payal Minor excluding supply of pipe.
Laying underground pipeline outlet RD 64500/TL Sangatpura Minor excluding supply of pipes.
Construction of Cell Block alongwith Toilet for 3 Transgender Prisoner at Central Jail, Ludhiana
Boating Site in between RD 219000 to 220500 of Bathinda Branch (Tallewal)
Boating Site in between RD 199000-200500 of Bathinda Branch (Gehal)