Loading…
Loading…
1,392 results • Latest
Conducting preliminary reconnaissance Mondikundu 110kV SS the existing Sithargalnatham 110 kV SS
Renovation of damaged RCC Gantry Structures A Bus at 230 kV Checkkanuoorani Switching Station
Providing BT Road Convent Road in Ward No - 33
Electrical works for Kadaladi 110 KV SS
Tolling Operation, Maintenance and Transfer of Trichy Thanjavur section of NH 83 and Madurai Tuticorin section of NH 38 in the state of Tamil Nadu (TOT Bundle 19)
Madurai Division: Energy Conservation Measures - Replacement of conventional fans with BLDC fans at various locations.
Senior Section Engineer, Dindigul, Madurai and Manamadurai Jurisdiction - Zonal work contract for Electrical Works for a period of 18 Months
Senior Section Engineer, Virudhunagar, Sengottai, Tirunelveli and Tuticorin Jurisdiction - Zonal work contract for Electrical Works for a period of 18 Months
Madurai Division: Repair Attention of Lights in Madurai, Tirunelveli & Rameswaram Pit lines and improvements in Coaching depot facilities.
Madurai Division: Energy Conservation Measures, Adoption of Smart Metering System for Railway Quarters and Commercial connections.
Madurai Division - SVGA station Improvements to platform surface and circulating area- Electrical power supply and Lighting arrangements.
Madurai division:--Proposed raising of existing Medium level Platform to High level Platform, PF.No. 2 at NKK, PF. No. 2&3 at PNGI , PF No 2 and 3 at TCH and TTQ- PF 1, NZT-PF 2 stations - Electrical power supply and Lighting arrangements.
MDU Division: (a). Provision of FOB and raising of RLPF to HLPF at SMDM & SDNR stations. (b). Raising of platforms to High level at 18 stations (MES, VDP, EKN, BJM, APK, KZB, KZY, PCO, AYVN, KCHV, KTYR, AWT, CTPE, MC, MPA, AYV, TML & KTHY) stations.- Power supply arrangements, wiring and installations
Madurai Division: Provision of Electrical power supply arrangements and Electrical submersible pumps at MEJ, TEN, CVP, TN, MNM, APK, MDU, VPT, RJPM, TDN, TMQ, SRT, SVKS and SVPR Railway stations
Sr. DEN/South/MDU jurisdiction: Construction of Gang rest room - Electrical power supply, wiring & installation arrangements
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Ready Mixed Paint, Air Drying, Red Oxide - Zinc Phosphate, Priming as per IS 12744 (Q3) (3 (3 ))
Monthly Basis Cab & Taxi Hiring Services - Sedan; 1500 km x 320 hours; Outstation 24*7
Prestressed Concrete Poles for Overhead Power Traction and Telecommunication Lines as per IS 1678 (Q3) (3 (3 ))
Civil works in additional rooms rented out to DRT and modification of Court Dais, Tables in 1st floor, Level4 building at Tallakulam, Madurai
Non-percolating firefighting hose, confirming burst pressure 38 Kg/cm2 and Proof Pressure 23Kg/cm2 a
Improvements and repair work for community hall building at SMP colony in ward 34
Provision for Internal and External Electrification and 5 KWp Solar Power Panel arrangements to the Construction of Social Justice College Girls Hostel Building for 100 Students at Keelakuilkudi in Madurai District.
Civil work for Kadaladi 110 KV SS
Supply of Corrosion Inhibitor for Ethanol Doping at HPCL POL
"S.W.I ,Manamadurai-Virudunagar section:- Standardization of formation/cess making at isolated locations between KM:-556.000 to 605.300 in between stations MNM-VPT in SSE/P.WAY/MNM section. S.W.II,SSE/Pway/MNM section:-Renewal of existing block joints with Glued joints (116 nos) at isolated locations in between stations TPC-MNM,MEKM-MNM & MNM-SUX."
Madurai Division -Provision of High Level Platform at TCH & NKK stations as per MEA norms
Through Fitting Renewal (R) - In TEN & SVV P.way section for 60 km
MDU Division: Sr.DEN/South Jurisdiction: Provision of Side pathway for bridge No.4 in TEN -TCN section
Madurai Division :- Provision of Track machine siding at 3 stations.(RJPM, SNKL & KDNL -Permanent way portion only)
Madurai Division -Provision of High Level Platform at TTQ & NZT stations as per MEA norms
ADEN/Dindigul Sub division:- SW I:- Through Fittings Renewal on plain track of various station yards (Loop lines) for a length of 38.165 km in SSE/Pway/MPA, DG & PLNI Section [ MPA_11.902km ,DG-7.408km & PLNI-18.855km] SWII: - TPJ-DG Section (Up/Dn line):-Through Fittings Renewal on plain track (Main line) for a length of 56.50 km at isolated location in SSE/Pway/MPA & DG Section [ MPA- 48.80km ,DG-7.700km] SW III:- DG station :- Upgradation of major yard work in connection with TRR(S), SEJ renewal and Deep screening of loop line & Pt & crossing in DG yard. SW IV:- Proposed Conversion of SWP into LWR of various yards in SSE/Pway/PLNI section. S W V:- Deep screening by BCM/Manual on loop lines at various station yard in SSE/Pway/MPA &DG Section. SW VI:- TPJ-DG (Up Line):- Deep screening by BCM from km 408/600 to 425/100 between AYR-TMP stations for a length of 16.50km."
Proposed Supply of Raw water to Level Crossing Gates of SSE/P.way/DG, MPA & PLNI section for period of 24 months
Madurai Division -Provision of High Level Platform at PNGI stations as per MEA norms.
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation
Dslr/Compact/Handheld Camcorder Or Video Cameras
Preparation of Asset Inventory using DGPS and Encroachment Identification in Madurai City Municipal Corporation (Zone 3,4,5)
Inverter (V2) (Q2)
Preparation of Asset Inventory using DGPS and Encroachment Identification in Madurai City Municipal Corporation (Zone 1 and 2)
Painting of TRD assets over Madurai Division for the period of two years
SITC of 350TR Cooling tower in place of old and worn out cooling towers of HVAC plant at Madurai Airport. SH Replacement of 02 nos. cooling towers, pumps, starters, VFD etc. Phase II.
Civil works for repair and maintenance works to Postal Store Depot ,Madurai.
Pre commissioning works in yard side at Nanguneri 230/110 KV SS in Tirunelveli
Electric Fumigator (Q3)
Counter Communication System (Q4)
ARM Electrical Works ESIC and ESIS Campuses at Thathaneri, Ponnagaram, Maninagaram under Madurai Region for a period of 12 months
ARM CIVIL Works ESIS Hospital and Staff Quarters Thathaneri and ESIS Dispensary and Staff Quarters at Ponnagaram/Maninagaram under Madurai Sub Region for the period of one year
ARM Electrical Works ESIC and ESIS Campuses at Madurai, Tallakulam, Munichalai, Palanganatham, Thirunagar, Paravai, Dindigul and Palani campuses, under Madurai Region for a period of 12 months
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; VERTICAL CAN TYPE LPG PUMP OF 55 M3/HR CAPACITY; Service Provider