Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
124 live32 closing this weekmost from Minor Irrigation Department and Chief Engineer Chitrakoot Dhaam (Banda) Zone PWD Banda
124 results • Latest
Construction of an RCC drain from Dev Narayan Pathak to Eidgah Road (Ward 08, Toriyapura)
Construction of RCC drain from culvert to Sonakpura field (Ward 13 Netaji Ward)
Construction of an RCC drain from Badminton Court to Church Gate (Ward-03, Lohia Nagar)
Special repair work on the Bilbai Disrapur connecting road
Special repair work on the road from Mahoba-Chhatarpur road to Kaimaha road
Construction of CC -Cement concrete pavement PC -Premix carpet with seal coat and a retaining wall on the Sunaicha-Raivara connecting road -off the Jhansi-Mirzapur road as part of special repair works
Special repair work on the road from Mataudh-Kapsa to Pachpahara
Construction work of CC and KC drain in the populated area under special repair scheme in change-2-620 to 2-800 of Jhansi Mirzapur road to Tikamou road
Construction of a C C -Cement Concrete road on the Baghwa connecting road under special repair works
Special repair work on the approach road from Banni Road to Dera No. 76
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Q2)
Janpad Hamirpur esthit Rajkiya Awasiya Coloniyo me varshik vidhut Anurakshan ka karya
CONSTRUCTION OF TOILET BLOCK AND BOUNDRY WALL AT K.G.B.V. KABRAI MAHOBA AND CONSTRUCTION OF GUARD ROOM AND BOUNDRY WALL AT K.G.B.V. CHARKHARI DIST. MAHOBA
Construction of Synthetic Running Track at Sports Stadium, Mahoba District Mahoba
High Mast Lighting Towerforlargeareawith LED Flood Lighting System (Q3)
CONSTRUCTION OF EXELLENCE CENTER (T.T.L.) GOVERNMENT GIRLS POLYTECHNIC CHARKHARI DIST. MAHOBA
Construction of 01 No 33 KV Enermaxx Solar Garautha Pvt. Ltd. Bay at 132 KV S/S Kabrai Distt. Mahoba (PR No. 1300085134)
RENOVATION AND BEAUTIFICATION WORK OF SATTALA POND IN NAYAPURA BANDHAN WARD MAHOBA
Solar Photovoltaic Water Pumping Systems (V2) asper MNRESpecification (Q3)
Solar Photovoltaic Water Pumping Systems (V2) asper MNRESpecification (Q3)
New construction work at village Kunwa to Punniya Link Road
Widening and strengthening of the road Rath Charkhari via Gudha raod (ODR).
Widening and strengthening work on the Kulpahar-Mudhari-Akauna road (Other District Road).