Loading…
Loading…
8,113 results • Latest
SITC of 12 Mtr High Mast with 6 X 200W LED Flood lights at Pottanakad , Bisonvalley Grama Panchayat in Devikkulam Constituency under MLA SDF 2022-23 of Sri A Raja MLA
MLA SDF Malappuram LAC Kuzhinjodi Manningachalikund Pathway Pulpatta GP
Annual Plan-PRO NO-1311-SECOND PHASE OF KOORIKKADATH DRAINAGE IN WARD 44-General Civil Work Work
Annual Plan 2025 26 OF PANDIKKAD GP-PRO NO 329-26 CHOORAKKAVU BYPASS ROAD RENOVATION AT WARD NO 16
Annual Plan-KONDOTTY MUNICIPALITY 2025-26-Proj No - 546 - Kolathoor AMLP School Swajaldhara Project Tank Ward - 40-General Civil Work
MLA-SDF-24-25-Hon MLA Shri.Dr. MK Muneer - Chalil Asharikandi Andona-Moozhikunnu Road-in Tharamassery GP (Koduvally BP)-General Civil Work
SITC of 12 m High Mast (6X200W LED) at Anachal Town and 8 m Mini Mast (6X150W LED) at Maryland Pallikkavala, Vellathooval GP, Devikulam Constituency, under MLA SDF 2022-23 of Sri A Raja MLA
MPLADS Renovation of Nabiarkunnu SC Colony Road Kuzhimanna GP
Annual Plan-Manjeri Municipality 2025-26,Project No-1310-KALPAALAM THURAKKAL THODU PROTECTION-General Civil Work
Supply, installation, testing and commissioning of Fluorescent Microscope with camera to the Department of Biotechnology, University of Calicut under PM-USHA Scheme from original equipment manufacturers (OEMs) or authorised distributors/dealers
MPLADS- Installation of Medium mast light at Edassery kadavu Bridge in Cheekode GP (10805)
MLA-SDF-Vengara BP 5459/2025-26 Kizhakkillath Road Oorakam GP-General Civil Work
Re Tender MPLADS Construction of Njanjipoyil Elassery road Ward 19 Urangattiri GP WC 11965
NCFRW-118-2026-13-Kaanam Karapambu Road-General Civil WorkVettekod-Ward 16-General Civil Work
MP-LADS-MP-LADS-MP-LADS- 2025-26 - 18 th LS Works proposed by ET.Muhammad Basheer, Honble MP LS-Malappuram project code-12283 - Alungal Town -Vettecode Town Beutification ward-30, Manjeri Municipality-General Civil Work
MP-LADS-Manjeri Municipality-Construction of Plywood Palanthodi road-pathway, Ward No.05, Manjeri Municipality work code 12250-General Civil Work
Retender-MP-LADS-2024-25-Construction of Kolikkal Thattancheri Road, Ward - 11, Kattippara Grama Panchayat-In Koduvally BP-General Civil Work
MP-LADS-24-25-Repair and Renovation of Vellattukulam Ambalath Thzaham Road, Ward 7, Madavoor GP-(Hon MP Shri. MK Raghavan) In Koduvally BP-General Civil Work
Annual Plan- 2025-26 PRO.NO-571/26 OF PANDIKKAD GP-HIGHSCHOOL PADI BUS STOP CONSTRUCTION AT WARD NO-17
MP-LADS-Vengara BP 11865/2024-25 Construction of Kalluvetty Valiyaparambu road -ward 16 Edarikkode GP General Civil Work
Annual Plan- 2025-26 OF PANDIKKAD GP PRO.NO-553 THEYYAMPADIKUTH ARPPINIKKUNNU ROAD ROAD MAINTENANCE AT WARD 06
Annual Plan-2025-26 OF PANDIKKAD GP PRO NO 615 VALARADUKUNNU JUNCTION PADAM ROAD CONCRETING AT WARD 15
FDR-23-24-Restoration of Marathakkod-Thadathummal Road Omassery GP-(Koduvally BP)-General Civil Work
Annual Plan-2025-26 OF PANDIKKAD GP PRO NO 601 KAKKULAM VALARADUKKUNNU ROAD CONCRETING AT WARD NO 15
Annual Plan-2025-26 OF PANDIKKAD GP. PRO.NO-680 CHEMBRASSERI KARUMMALPADI ROAD CONCRETE IN WARD NO.08
Annual Plan- Kalikavu Grama Panchayath Electrification of mele kalikavu anganavadi and Poongode Anganavad
Annual Plan-2025-26 OF PANDIKKAD GP PRO NO 640 KARAYA KONITHAKKAL ROAD RENOVATION AT WARD NO.17
MLA-SDF-Vengara BP Work code-5440/2025-26 MM Basheer Musliyar Road concrete -kannamangalam GP- General Civil Work
State Plan-State plan 2025-2026 -Source Improvement and amp water Conservation - Construction of bund across Thoothappuzha river at Kaithakkadavu pump house-General Civil Work
NCFRW-Vengara BP SI No.4 Chengani Mekkunnekad Road-Kannamangalam GP-General Civil Work
SITC of 8metre minimast with 5 no of 150W LED flood lights at Kannavam Unnathi Khadi Board area, ward 13, Pattiyam Grama Panchayath
PETTAPPADI KUNNATH ROAD CONSTRUCTION-WARD 2-289/26- MAKKARAPARAMBA GP-2025-26
KALAVU RAMAPURAM R O A D - 8 6 / 2 6 - W A R D 9 - MAKKARAPARAMBA GP-2025-26
COMPLETION OF KULATHARAKKAD ROAD RENOVATION-269-26-WARD 3- MAKKARAPARAMBA GP
ARANNOTT AMBALAM ROAD RETTARING-101/26-WARD 11- MAKKARAPARAMBA GP
installation testing and commissioning of 1.5 Tr and 2 Tr single phase 3 Star rated Split Ac unit wall mounting split air conditioner unit in Ponnani taluk hospital
Annual Plan-Manjeri Municipality 2025-26, Project No-1299-Construction of Old DMO Office road in ward no7-General Civil Work
KALAVU PALLIPADI AMBALAPPADI ROAD-85/26-WARD 9- MAKKARAPARAMBA GP
DEPOSIT-Deposit work -2025-26 -Minority welfare fund- Pipeline extension to kadampuzha-kavumburam branch road in ward No.2 valanchery municipality.-Pipeline Work
SIDE PROTECTION
MAKKARAPARAMBA GP- 2025-26 IMPROVEMENT WORKS TO KANIPARAMBA AMBALAM ROAD 76-26
Annual Plan-2025-26 Edakkara GP Pro.no- 301/26-Renovation of commpound wall at Poovathykunnu anganvady
Annual Plan-2025-26 chundiyar madam road maintanance-project No-1292-General Civil Work
Annual Plan-1272/2025-26-Tresiyama Mini Footpath concreting in Ward no.27-General Civil Work
Supply of Instruments for poly dental clinic
Annual Plan-2025-26 Malappuram municipality P No . 169-PERUVIL ROAD RETARRING AND IRISH DRAIN IN WARD 40- General Civil Work
CONCRETE
SITC of 12 m High Mast (6X200W LED) at Chekuthan Mukku Jn and 8 m Mini Mast (6X150W LED) at Kunjithanni Service Co-op Bank Jn, Pallivasal GP, Adimali Block, under MLA SDF 2023-24 of Adv A Raja MLA
Annual Plan-2025-26, Manjeri Municipality, Project No 1267-Puzhankav Thottumoola Footpath Second Phase in ward 26-General Civil Work
CONCRETE