Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC 673645 | MALAPPURAM | KERALA | 673645 | ₹7.2 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | salim L1 | HABEEBASSOSIATES L2 |
|---|---|---|---|---|---|
| 1.00ROAD RENOVATION | |||||
| 1.00 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (D) Dry Rubble Masonry | 24.75 | cum | 450 ₹11,137.5 | 445 ₹11,013.75 Lowest |
| 1.00 | OD310466/2025-2026: OD from 2.8.1-Earth work in excavation by mechanical means (Hydraulic excavator) /manual
means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 32.76 | cum | 355 ₹11,629.8 | 345 ₹11,302.2 Lowest |
| 1.00 | OD310493/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site. | 116.7 | cum | 4,200 ₹4,90,140 | 3,900 ₹4,55,130 Lowest |
| 1.00 | OD310492/2025-2026:DR with Deppartmental stone-DRY RUBBLE MASONRY Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc.complete as per direction of Departmental officers at site | 19.8 | cum | 2,000 ₹39,600 | 1,700 ₹33,660 Lowest |
| 1.00 | OD310494/2025-2026:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck,
spreading in layers, leveling the top at site and consolidation by ramming, etc
complete for improving the CBR value of subgrade | 46.28 | cum | 960 ₹44,428.8 | 950 ₹43,966 Lowest |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 9.62 | cum | 11,000 ₹1,05,820 | 10,000 ₹96,200 Lowest |
| 1.01 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.55 | tonne | 1,30,000 ₹71,240 | 93,000 ₹50,964 Lowest |
| 1.01 | OD310476/2025-2026:Filling with contractor's own earth (excluding rock)in open areas in layers not exceeding
20cm in depth consolidated layer by ramming and watering ,lead up to 50m and lift up to 1.5m
as per direction of site Engineer-in-charge. | 369.64 | cum | 198 ₹73,188.72 Lowest | 450 ₹1,66,338 |
Tender Value
₹8.5 L
EMD Value
₹21,181
Closing Date
9 Oct 2025, 12:30 pmClosed
AE
AE
Annual Plan-VAZHAKKAD GP PRO NO 195/2025-26-KM ABDULLA MEMMORIAL KAMBRATHIKUZHI COLONY ROAD RENOVATION IN WARD 16-General Civil Work
2025_LSGD_804368_12
05/ETEN/AE/LIDEW/VKD/2025-26
Open Tender
Civil Works - Roads
Item Rate
VAZHAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,181
Yes
13 Aug 2026
1 Oct 2025
10 Oct 2025
1 Oct 2025
9 Oct 2025
1 Oct 2025
1 Oct 2025 - 9 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1338224.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .