Loading…
Loading…
4,611 results • Latest
Work of installing barricades to close the gaps in the road divider between Hapur Adda and Bharat Mata Chowk.
Work involving the installation of barricading to close the gaps in the road dividers on the stretch from Sardhana Road to Tack Crossing and from Saket Crossing to Jail Chungi Crossing.
Work of installing barricading at the openings in the road dividers for the Kanwar Yatra, covering the stretch from Delhi Road Football Chowk to Mohiuddinpuram.
Work regarding the installation of barricading at the openings in the road dividers for the Kanwar Yatra, covering the stretch from Hapur Adda Crossing to the Lohiyanagar Dumping Ground toll road.
Installation of barricading on Roorkee Road within municipal corporation limits from Shobhit University to Partapur Flyover and from Modipuram Flyover to Gandhi Bagh Crossing, on the occasion of Shivratri.
Work of installing barricading at the openings in the road dividers along the stretch from Begumpul to Football Chowk on Delhi Road for the Kanwar Yatra.
Work of installing barricading at the openings in the road divider between Tejgarhi Crossing and L-Block T-junction.
Work to install barricading at the openings in the road dividers on the stretch from Hapur Bus Stand to the Kali River, in view of the Kanwar Yatra.
107 B jubilee ganj rajban bada bajar mein mandir ke samne nale ke pul se agar deep rodiya ke makan number 78 Jublee ganj tak interlocking tile or nail nirman karya
Virtual Reality Based 3D Terrain Recce System
Procurement and Installation of wall mounted oscillating
Mukhyamantri Samuhik Vivah wedding gift items as
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair of Underground Irrigation Pipes and Water Sprinkler POP UP System; Repair of Underground Irrigation Pipes and Water Sprinkler POP UP System; Service Provider
Straw/Bhusa (Q3)
Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2), Elecric Bells and Accessories as per IS 2268 (Q3), Ceiling rose - IS 371 (Q3), LED Batten Light (LED Tube Light) (V2) (Q2), Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2), LED Garden Light (V2) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2), Electrical Plugs (V2) ISI Marked to IS 1293 (Q2), Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2), Plasticized PVC Tapes with Non-Thermosetting Adhesive for electrical purpose (V2) ISI marked to IS 7809 (Part 3/Sec1) (Q2) (3 (3 ))
Work of Installing Fire Fighting System at the Electricity Store Centre, Partapur Distt- Meerut
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2), Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3), LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2), Bathroom or Toilet Mirror (V3) (Q4), Towel Rail (Q3), LED Batten Light (LED Tube Light) (V2) (Q2), PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3), Towel Ring (Q3) (3 (3 ))
Cushion Covers-Handicraft (Q3)
Cable Joint Kit Suitable for Cables Up to and Including 33 kV (V2) (Q3), Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3), Bathroom or Toilet Mirror (V3) (Q4), Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) (3 (3 ))
Plywood for General Purposes Marked to IS 303 (V3) (Q2), Prelaminated MDF Board (Q3) (3 (3 ))
SPL REPAIR /REPLACEMENT OF ASBESTOS ROOF SHEETS AND ALLIED WORKS IN BLDG NO E-110 OF PINE OFFRS MESS UNDER AGE B/R-III AND AGE E/M-II OF GE (SOUTH) MEERUT CANTT
Refined Groundnut Oil (V4) (Defence) (Q3)
Refined Sunflower Oil (V4) (Defence) (Q3)
Refined Sunflower Oil (V4) (Defence) (Q3)
Refined Groundnut Oil (V4) (Defence) (Q3)
Field Mob Toilet (06 Men) Relocatable
Cell Pack Pack of 20 Ltr sysmex, Stromatolyser WH 500ML x 3, Sysmex Cell Clean 50 ml bott, 8 Check 3 WP Low 1.5 ML x 1, 8 Check 3 WP High 1.5 ML x 1, 8 Check 3 WP Normal 1.5 ML x 1
MS PIPE FITTINGS
Catering Service per Packet based - Veg; Snacks/High; Snacks Packet
LINE AREA
SPECIAL REPAIR TO BLDG NO AC-24 MANDIR AT 9 ARTY BDE CAMP AND SPECIAL REPAIR/ REPLACEMENT OF BER GEYSER UNDER AGE B/R-I AND AGE E/M-I OF GE (NORTH) MEERUT CANTT
KITTING AND TRAINING STORES
A3 Size Multifunction Printer (MFP) (Q2)
Refrigerator 184 Ltrs Capacity
Construction of New Substation
Line Works
Substation and Lines works
For the Work of Construction of Double Poles, 11/0.4 KV Sub-Stations, 11 KV/LT Lines, Cable Laying and Miscellaneous Works under Deposit Scheme in the Area EUDD-11 KV and LT Line South, Meerut.
Hay Grass (Looseand Bundle) (Q3)
Genr Spares
Potassium Monopersulphate 1% (5 Kg Can)
HAPPY UNIVERSAL Mid-back Revolving Chair of Adjustable height with Wheels Brand: HAPPY UNIVERSAL (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687745520566 dt.23/0