Loading…
Loading…
191 live142 closing this weekmost from Directorate of Local Bodies UP and Northern Railway
191 results • Latest
WARD NO- 03 SUPPLY AND LAYING 160mm DIA HDPE PIPE (PN-06) LINE (500 METER) FROM ANGE WALE GATE TO TAJ DARWAR RESTURANT) TAJ DARBAAR RESTURANT TO HATHE WALI PULIYA.
WARD NO- 05 SUPPLY AND LAYING 110 mm DIA HDPE PIPE (PN-6) LINE (580 METER) FROM SHAREEF CHAKKI WALE TO ABID THEKEDAR, YASEEN TO NENHE ALI, JUMMA TO IRSHAD, CHARANJI TO GHASITA MIYA, HARSHAN MULLA JI TO MAHFOOJ SHOKEEN THEKEDAR TO RAHEMANI MASJID, JAH
WARD NO- 05 SUPPLY AND LAYING 110 mm DIA HDPE PIPE (PN-6) LINE (665 METER) FROM FARMAN TO ASHPAK, BHOORA TO SHARIPHOOL, SHRIFOOL TO ABID HUSAIN, SABIR TO RASHID, RASHID TO MOSIN, PILOT BOUNDRY TO ASHIF AND ALI HASAN TO MUBARIK.
WARD NO- 05 ME AKBAR KI FACTORY KE SAAMNE SE AMAN METAL TRADERS SAAMNE TAK R.C.C. NAALE KA NIRMAN KARYE. LENGTH 247 METER
WARD NO- 04 SUPPLY AND LAYING 110 mm DIA HDPE PIPE (PN-6) LINE (310 METER) FROM FAIZAN AND INTJAAR TO LADDAN AND ASAK ALI HOUSE VIA SHAKIR HOUSE TO MEHBOOB HOUSE AND LADDAN HOUSE TO MOHD ASHIF HOUSE.
WARD NO- 05 SUPPLY AND LAYING 160 mm DIA HDPE PIPE (PN-6) LINE (1500 METER) FROM HUSHIHAAR SINGH TO DHASHEHARA GROUND, RAFI SAIFI TO MARIJHAL, MARIGE HALL TO METAL TARDER FACTORY.
WARD NO- 05 ME HOSHIYAR SINGH KE MAKAAN SE AANGANWADI KENDRA KE SAAMNE TAK R.C.C. NAALE KA NIRMAN KARYE. LENGTH 247 METER
WARD NO- 05 ME AKBAR KI FACTORY KE SAAMNE SE PURANE NAALE KI PULIYE TAK R.C.C. NAALE KA NIRMAN KARYE. LENGTH 195 METER
WARD NO- 09 ME DAWAI FACTORY KE SAAMNE SE ABDUL KADIR KE MAKAAN TAK R.C.C. NAALE KA NIRMAN KARYE. LENGTH 175 METER
WARD NO- 05 ME MARRIAGE HALL SE JUMMA PADHAN KE KHET TAK R.C.C. NAALE KA NIRMAN KARYE. LENGTH 115 METER
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - For Repairing of 10 KVA to 1000 KVA damaged T/F at Electricity workshop, Moradabad; For Repairing of 10 KVA to 1000 KVA damaged T/F at Electricity workshop, Moradabad; B..
Mobile Iron Barricades - Large (MHA) (Q3)
Custom Bid for Services - Manpower Cost for Comprehensive Mechanized Cleaning and Housekeeping Work at Haridwar Railway Station including Minimum Wages, EPF, ESIC, Miscellaneous Charges and GST, Custom Bid for Services - Cost of miscellaneous Store C&P for Mechanized Cleaning Work for 03 Years, Custom Bid for Services - Cost of miscellaneous Store T&P for Mechanized Cleaning Work for 03 Years, Custom Bid for Services - Cost of Loading, Transportation, Handover & Processing of Total Segregated Waste Streamwise to authorized processing facilities and EBWGR Certificate or processing of wet waste through Composter as per SWM Rule 2026 for 03Y.., Custom Bid for Services - Contractor Profit for 03 Years
Comprehensive Annual Maintenance Contract (CAMC) of Johnson make Lifts installed at HW-02 Nos., DDN-02 Nos. & MB-02 Nos. for 5 years over MB Division.
Comprehensive Annual Maintenance Contract (CAMC) of Johnson make Escalators installed at HW-04 Nos., DDN-02 Nos. & YNRK-04 Nos. for 5 years over MB Division.
STAINLESS STEEL BED AS PER DRAWING NO. NR/DC/117 DT NOV 2013 WEIGHT OF THE BED IS 45.5 KG (+2.0 KG -1.5 KG) AS PER DRAWING/ ANNEXURE-A ENCLOSED AND ITEM WILL BE DELIVERED AT HARIDWAR STATION.
Augmentation to Enhance Safety at TSS, SP and SSP Locations along with Improvement of Bonding and Earthing Systems over Moradabad Division.
Provision of dummy Overhead Equipment (OHE) at 53 Level Crossing gates over Moradabad Division.
Automatic Fire Ballfor Fire-Extinguishing (V2) (Q2)
Construction / Improvement of Rest House/ Holiday home, Community centre andother service building at Haridwar and nearby station in C/W Ardh Kumbh Mela-2027
SULEMAN TRAVELERS KI DUKAAN SE RASHID KE MAKAAN TAK R.C.C. NAALE KA NIRMAN KARYE.
WARD NO- 11 ME NAZIM BELDING WALE KE MAKAAN SE UMRI CHOWK KI OR R.C.C. NAALE KA NIRMAN KARYE.
WARD NO- 09 ME MASTER IRFAN KE MAKAAN SE MULLA SHAMEEM KE MAKAAN TAK R.B. TATHA MUSHAHID KE MAKAAN SE TALAB TAK R.C.C. NAALE KA NIRMAN KARYE.
BHURE KI DUKAAN SE MAIN CHAURAHA (BUS STAND) TAK R.C.C. NAALE KA NIRMAN KARYE.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - CONSTRUCTION OF 01 NO 33 KV BAY DHAMPUR TOWN II AT 132 KV DHAMPUR; CONSTRUCTION OF 01 NO 33 KV BAY DHAMPUR TOWN II AT 132 KV DHAMPUR; As per PQR and BOQ
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply and work for Diversion/Height raising of 132 KV Simbhaoli-Gajraula line under ETD-Amroha; Supply and work for Diversion/Height raising of 132 KV Simbhaoli-Gajraul..
DESKTOP BASED SIMULATOR FOR THREE PHASE ELECTRIC LOCOMOTIVES
Augmentation of Stores of SSE/P.Way/SPN & RAC and SSE/Works/SPN & RAC under ADEN/SPN
Augmentation of Stores of SSE/P.Way/BE & RMU and SSE/Works/Rampur & BE Under ADEN/BE
Repair of cess and Widening/standardisation of cess in at vulnerable locations and bridge approaches in the section of ADEN/BE.
Cess repair work from Km 1238 to 1245, Km 1247 to 1255, Km 1256 to 1265, Km 1267 to 1272, Km 1274 to 1279 in the section of SSE/W/SPN under ADEN/SPN
Replacement of 9.15m Steel Girders to PSC slab(14 girders) at Br. No. 928UP (2 x 9.14m), 941 UP & DN (4x9.15m), 1012 UP & DN (3x9.15), 956UP (2 x 9.15m) & 968 UP (2x 9.15m) and 12.2 M Steel Girder (18Nos) to PSC Slab at Bridge No 1062UP & DN (3x12.2M), 1072 UP & DN (2x12.2), 1076 UP & DN (4x12.2 m) in the Section of Sr.DEN-III/MB.
Diesel Power Generator (V2) (Q2)
Loading and laying of US PRC sleepers at Track depot CBJ for new material stacking under SSE/TD/CBJ under Sr DEN/C/MB (Estimate No. 148/2026, 149/26, 155/26 SF/RRSK)
Renewal of bridge no 1237 UP&DN (01*9.14),1239 UP&DN (02*9.14) ,1240 UP&DN (01*9.14) and 1244A UP&DN (01*12.70),1260 UP&DN (03*12.20) and 1271 DN (01*6.10),1275 UP&DN (02*12.20) and 1282 UP&DN (02*12.20),1289 UP&DN (03*12.20) and 1294 UP&DN (02*12.20) , 1298 UP&DN (01*12.20) and 1300 UP&DN (04*12.20) by replacing existing steel girder by PSC slab and strengthening work by jacketing in the section of SSE/W/RK under ADEN/RK. (Est no. 39/26 Cap)
Safes (V3) ISI Marked to IS 550 (Q2) (3 (3 ))
Civil work for Increasing Capacity from (2X40 1X20) MVA to (3X40) MVA at 132 KV S/s Bilari, Moradabad.
Operation and Maintenance of all existing Material Recovery Facilities of 5 TPD Each for Dry Municipal Waste generated in Moradabad for 02 PLUS 03 Years.
Janpad Nyayalya Muradabad me Janpad Nyayadheesh evam apar janpad nyayadheesh ke nyayalaya kakshon evam vishram kakshon me AC isthapna ka karya