Loading…
Loading…
193 results • Latest
Construction of an interlocking tile road and a drain, measuring 164.00 meters, from the main road to Rajpal house in the village Matlabpur Sadarpur, Block-CHHAJLET. District Moradabad.
AIR BRAKE HOSE COUPLING FOR FEED PIPE FOR BCACBMB WAGON.
TRD work i.c.w. interlocking of LC gates with TUV>20000 under Juridiction of ADSTE/MB over Moradabad Division
TRD work i.c.w. interlocking of LC gates with TUV>20000 under ADSTE/HRI over Moradabad Division.
TRD work i.c.w. interlocking of LC gates in the left over section over Moradabad divison.
REFRIGERATOR Total Volume for Direct Cool 205-225 Litre,
SUPPLY AND INSTALLATION OF 07 NOS 6X140-150 WATT LED SEMI HIGH MAST LIGHT WITH 9.5 MTR POLE FOR D.R.D.A AMROHA U.P.
SUPPLY AND INSTALLATION OF 21 NOS 6X140-150 WATT SEMI HIGH MAST LIGHT AT MORADABAD FOR D.R.D.A. MORADABAD U.P.
SUPPLY AND INSTALLATION OF 30 NOS 6X170-200 WATT LED SEMI HIGH MAST LIGHT WITH 9.5 MTR POLE FOR D.R.D.A. PILIBHIT U.P
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Finance/Accounts