Loading…
Loading…
192 results • Latest
Ward No.-09 Construction of Interlocking road and U- type one side RCC drain from Kamruddeen House to Shamsheer House.
Ward No.-07 Construction of C.C Interlocking road and U- type both side RCC drain from Saheed Lala House Via Indiyaz House to Master Shakeel House.
Ward No 08 Construction of C.C Interlocking Road and Both Side U-Type Drian From Gufran House Via Nfish House to Noor Hasan Dudiya and Link gali 01 Abdul Hak House to Ahemad hasan House, Link Gali 02 Mohd Ali to Naushad House, Link Gali 03 Anish memb
Ward No.-07 Construction of C.C Interlocking road and U- type both side RCC drain from Yameen Mistri House to Chote Choudhary House.
Ward No.-05 Construction of C.C Interlocking road and U- type Both side RCC drain from Talib hafize house via Kabristhan to Shipte house.
Ward No.-07 Construction of C.C Interlocking road and U- type both side RCC drain from Mohd Yakoob Rangrez to Mazar and Link gali - At Nanhe Haji house,
Ward No.-05 Construction of Interlocking road and U- type both side RCC drain from Matloob Salmani House to Madarsa.
Ward No.-05 Construction of C.C road and U- type both side RCC drain from Madarsa Gulsane Mustafa to Rahat Ali House.
Construction of 17 Nos. Self-Finance Scheme, Semi-Finished Houses (Type design 90/162) in Sector-12A of Majhola Yojna No. 4, Phase-2 (Vistar), Moradabad
Safety work related misc. track works in the section of SSE/P.way/NBD under ADEN/NBD.