Loading…
Loading…
192 results • Latest
TSR(P) = 48.231 Kms by PQRS & others allied works in MB - GZB Section under jurisdiction of Sr.DEN/IV/MB.
Ward No.- 02 Construction of C.C Interlocking road and U- type both side RCC drain from Fakrukdeen Diwan Jii House to Insaf Ali House.
Ward No- 04 Construction of C.C Interlocking Tiles Road and U-type Both Side Rcc Drain Sahid House to Mukram House.
Ward No.- 03 Construction of Interlocking road and U- type both side RCC drain from Ajmat Ali House to Main Bazar (Dilari marg).
Ward No.-05 Construction of C.C Interlocking road and U- type both side RCC drain from Buniyad Ustaz House to Kalua Haji House and Link road- from Abid Netaji house to Shajid Haji House.
Ward No.-04 Construction of C.C Interlocking road and U- type both side RCC drain from Musahid Choudhary House via Aslam House to Mohd. Irfan House and Link road- (01) from Rahesh Tail wale to Hafij Afsar Ali House and Link road- (02) At Asraf Theke
Electrical work for Upgradation of Illumination at railway premises,along with Temporary Lighting Arrangements for Tents for passenger amenities at LRJ,RKSH,YNRK,HW,DDN etc stations & Electrical work for Upgradation of lighting arrangements and creation of new illumination arrangements for safe working of railway staff and passengers in yard and stations of MB Division (Phase-I).
Construction of 24 Nos. Self-Finance Scheme, Semi-Finished Houses (Type design 90/162) in Sector-14 of Majhola Yojna No. 4, Phase-2 (Vistar), Moradabad
Construction work for internal roads (granular base) and park boundary walls, gates, and interlocking pathways in Sector-9A of Majhola Scheme No 4 Part-2 Moradabad
Construction of 45 Nos. Self-Finance Scheme, Semi-Finished Houses (Type design 62/128) in Sector-14 of Majhola Yojna No. 4, Phase-2 (Vistar), Moradabad.