Loading…
Loading…
1,705 results • Latest
e-10(2026-27) Level 3 Surgical PICU with NICU, With NICU
RFP for Selection of an Independent Third Party Agency (TPA) for Comprehensive As-Is Where Is Field Audit, Verification, Assessment and Validation of Active and Passive Network Infrastructure Deployed under BharatNet Phase-II (MahaNet-I) Project
e-09 (2026-27) Supply and installation of HPLC Machine on Turnkey Basis HPLC machine 1
Supplying, Installing, Testing, Commissioning 25 KVAR LT Automatic Power Factor (APFC) Panel installed in Engineering Department at Various Depot.
SPECIAL REPAIRS TO BLDG A-84 85 AT INS ANGRE
Electrification of proposed Aranya North Tower 33KV Receiving Sub-Station on the plot Bearing C.S. No. 593 of Mazgaon Division at Rambhau Bhogale Marg, Byculla.