Loading…
Loading…
8,745 results • Latest
Procurement of different bearings for TM OPH (Stage I and Stage II) area
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I under KAPASDANGA AND ADJOINING MOUJAS PWSS, Block-KHARGRAM, through Auto Motor Starter Panel at P.H. No. I and II under BISWANATHPUR PIPED W
Day to day operation of pump motor set at Circuit House and D.M. Bunglow ,Berhampore in Two shift from 6.00 A.M. to 2.00 P.M. and 2.00 P.M. to 10.00 P.M. for 365 days under Berhampore Division I,P.W.D during the year 2026-2027.Murshidabad.
Day to day operation of pump motor set at various Building at the premises of District Magistrate Office at Berhampore in one shift from 8.00 A.M to 4.00 P.M for (01) one year of Berhampore Sub Division I under Berhampore Division I,P.W.D during t
Day to day operation of pump motor set at Berhampore Fire Station, and pump motor set at BK II Building (SP office. District register office, SDO Civil court, ARCS Office) at Berhampore in Two shift for (01) one year of Berhampore Sub Division I und
Day to day operation of pump motor set at Govt. college of Engineering and Textile Technology. Berhampore (BK I) and Boys Hostel of Govt. college of Engineering and Textile Technology. Berhampore in one shift from 8.00 A.M to 4.00 P.M for (01) on
Day to day operation of pump motor set at Inspection Bunglow and Type III quater Berhampore in one shift for 01 one year of Berhampore Sub Division I under Berhampore Division I P.W.D during the year 2026-2027.
Facility Management Services - LumpSum Based - Deployment of ExRailway Adhoc Loco Driver, Guard and Controller for NTPC Farakka MGR; Deployment of ExRailway Adhoc Loco Driver, Guard and Controller for NTPC Farakka MGR; Consumables to be provided by s..
Sagardighi - Monigram -Gankar - Raghunathganj Road from 20.90 km. to 25.00 Km, patch Repairing work in stretches under Murshidabad Highway Division No.I. during the year 2026-2027.
Dhulian - Pakur Road from 0.00 km. to 1.50 Km, patch Repairing work in stretches with potholes repairing etc under Murshidabad Highway Division No.I. during the year 2026-2027.
Renovation of internal Electrical Installation Work for Kolkata South Health Electrical Division, P.W.Dte.
Repairing work of Rukunpur to Ramkrishnapur Road from 0.00 km to 2.00 kmp, 2.50 km to 4.00 kmp, 5.00 km to 9.00 kmp and 10.00 kmp to 11.00 km (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027
24 p+ 4 SFP Smart Managed Switch, 6u Rack, HDMI 4K Switch 5 in 1, HDMI 4K Splitter 1 in 4, Syrotech SFP
Supply and delivery of Current Transformer and Potential Transformer for HT Bulk Consumers under Berhampore Division
construction of Innovative Science Lab at Sava Milani HS under Berhampore Block
construction of Innovative Science Lab at Shieikdighi HS under Sagardighi Block
construction of Innovative Science Lab at Hariharpara HS under Hariharpara Block
Kandi-Municipality Link Road from Ch. 0.00 Km to 0.05 Km, Widening work under Murshibad Highway Division No.II during the year 2026-27
Emergent Patch repair of Pot-holes and deep depressions on Sagardighi Suki to Panchgram-Nabagram-Lalbagh Road from ch. 0.00 Km to ..... 4.50 Km, in stretches under Murshidabad Highway Division No.II during the year 2026-27
Filling Pot-Holes and Patch repair of surfaces with Open-Graded Premix Surfacing, 20 mm. on Santoshpur to Propara Road from 0.00 Kmp to 1.00 Kmp and 1.85 Km to 2.18 Kmp in Stretches under Murshidabad Highway Division No.II during the year 2026-27
Filling Pot-holes and Patch repair of surfaces with open-Graded Premix surfacing, 20 mm. on Azimganj to Panchgram-Nabagram-Lalbagh Road from 0.00 Kmp to....4.75 Kmp, in stretches under Murshidabad Highway Division No.II during the year 2026-27
Repair of Potholes and Damaged pavement in patches on Kandi-Bharatpur-Salar Road from 0.00 Kmp to 9.544 Km and 10.664 Km to 12.996 Km under Murshidabad Highway Division No.II during the year 2026-27
Bulk Procurement of Ammonia
Link Road to Margram H.C. from Kuli-Moregram Road from 0.00 Kmp to 4.70 Km, Patch Repair in stretches under Murshidabad Highway Division No.II during the year 2026-27
Filling Pot-holes and Patch repair of surfaces with open-Graded Premix surfacing, 20 mm. on Gokarna-Chiruti Road from Ch. 0.0 Km to Ch. 9.10 Km.......under Murshidabad Highway Division No.II during the year 2026-27
Maintenance and Patch Repairing of Chandpara to Halalpur Ferry Ghat Road from 0.00 Kmp to 4.30 Kmp under Murshidabad Highway Division No.II during the year 2026-27
Filling Pot-holes and Patch repair of surfaces with open-Graded Premix surfacing, 20 mm. on Purandapur-Hizole Road from Ch. 1.5 Km to Ch. 5.5 Km under Murshidabad Highway Division No.II during the year 2026-27
Cheque Imaging Scanner for Cheque Truncation System (CTS) with MICR Code Detector
Construction of ATU at near Pathak Para Sona Konai house under Saktipur G.P. Code- 119780218
Islampur- Raninagar- Katlamari Road (ODR) From 0.00 Kmp to 19.00 Kmp, Widening and Strengthening work Under Berhampore Division No.-II, PWD, in the District of Murshidabad.
Day to day Operation and guarding of the pumping machinery through MANUAL Motor Starter Panel at Zone-I P.H. No. I, II , Zone-II P.H. No. I,II under FARIDPUR W/S Scheme, Block-JALANGI Dist-Murshidabad.
REPAIR OF CC ROAD FROM HOUSE OF UJJAL MONDAL TO HOUSE OF NAMAI MONDAL AT UTAR BACHRA
Construction
Domkal Garaimari Rd 0.00to15.00 Kmp Widening 5.50to7.00mtr and Strengthening work inclu construction of 8 Nos. CD structures, 525mtr protection works and 800mtr drainage works under Berhampore Div NoII,PWD in the dist of Murshidabad(2ndcall)
Construction of Drains at Mainuddin Sk house to Pilkhana Primary School near Pilkhana Primary School under Rampara-II GP
REPAIR AND MANTAINCE WITH UPGRADATION OF DRAIN WITH COVER FROM MANDIR TO MEGNATH SAHA HOUSE
Construction
Day to day operation of 1No. 15 Passenger Lift (make -Kone) for two shifts installed at X-Ray Block in Chittaranjan Seva Sadan COGCH, Kolkata . (for the period of one year)
SUPPLY OF OFFICE VEHICLES
SUPPLY OF OFFICE VEHICLES AT CMOH OFC MSD
HIRING ELECTRIC VEHICLE
HIRING OF ELECTRIC VEHICLE AT CMOH OFC MURSHIDABAD
Procurement of Ring Hammer for Ring Granulators Crushers installed at CHP SGTPP
Procurement of complete CCP orifice assembly for unit-2 overhauling scheduled in August 2026, stage-1, SGTPP.
MRL01-Nirmal Char to Tiklichar under Bhagawangola-II Block (Length of the Road 2.330 Km)
MRL02-Andul Baria to Andul Baria Uttarpara under Beldanga-II (Length of the Road 4.007 Km)
MRL02-Gorangadanga Adibasipara to Bahala under Nabagram Block (Length of the Road 1.241 Km)
MRL01-Naunpara More to Naunpara Village under Jalangi Block (Length of the Road 1.295 Km)