Loading…
Loading…
1,312 results • Latest
CONSTRUCTION OF CC ROAD FROM HO- AMATU MIYA TOWARDS HO MECHHER MIYA AT PARTIPARA SANSAD
BAMBOO PILLING WITH EARTH FILLING FROM BASKURIYA POND OF MAFCHHER MIYA AT MOSTAFAPUR SANSAD
CONSTRUCTION OF CC ROAD FROM PRANSAGAR ROAD TOWARDS PURANO MASJID VIA HO TAJER MIA AT ATASH SANSAD
CONSTRUCTION OF CC ROAD FROM HO DIPAK ADHIKARY TOWARDS HO LALIT MAHANTA AT HATATH PARA AT FULBARI SANSAD
INSTALLATION OF SOLAR PURIFIED DRINKING WATER WITH IRON GUARD NEAR H/O H/O SUDHIR EKKA SCHOOL PARA AT PARTIPARA SANSAD
CONSTRUCTION OF PUCCA DRAIN WITH SLAB FROM JIYAUL MIYA TOWARDS DOLBARI VIA H/O ALIM AT AT CHALUNDA SANSAD
CONSTRUCTION OF PUCCA DRAIN WITH SLAB FROM H/O JALIL MIYA TOWARDS BODIYAPUKUR AT DHANAIL AT NAKAIR WEST SANSAD
INSTALLATION OF SOLAR PURIFIED DRINKING WATER WITH IRON GUARD NEAR HO SAMIRAN ROY AT BIRANAI SANSAD
INSTALLATION OF SOLAR PURIFIED DRINKING WATER WITH IRON GUARD NEAR H/O RAMEN MINJI AT NARASUNDARPARA SANSAD
INSTALLTION OF MARK-II TUBE WELL WITH PLATFORM AND SOAKPIT IN FRONT OF BASTAMKURI MAINAR SARKAR AT MOSTAFAPUR SANSAD
CONSTRUCTION OF PUCCA DRAIN WITH SLAB FROM MADRASSAH TOWARDS BASKURIYA POND AT MOHANPUR SANSAD
CONSTRUCTION OF PUCCA DRAIN WITH SLAB FROM H/O AJIJAR SARKAR TOWARDS H/O HAMIDUR MIYA AT PALSA SANSAD
INSTALLTION OF MARK-II TUBE WELL WITH PLATFORM AND SOAKPIT IN FRONT OF BASKURIYA H/O ISMAIL MIYA AT MOSTAFAPUR SANSAD
CONSTRUCTION OF PUCCA DRAIN WITH SLAB FROM H/O RAKHAL BARMAN TOWARDS H/O BABU BARMAN AT PANCHAGRAM SANSAD
Monthly Basis Cab & Taxi Hiring Services - SUV; 2600 km X 360 hours; Local 24*7
1 - DRY AIR REGULATOR TO DRG. NO. 24998800017 REV-07
Improvement to Dobhighat Meshi Mahalpatne MDR-59 K.M. 5/500 to 8/800, Tal. Deola, Dist. Nashik
Widening and Construction of Concrete Road to Bhabadbari Kheldari Shelu Sogras (NH-03) Shirsane Road MDR-63 K.M. 3/500 to 7/300, Tal. Deola, Dist. Nashik
Erection, dismantling and maintenance of 3.3 kV overhead line on as and when required basis for the period of 1 year at Birsa Project..
Hiring of Mechanical Services for Handling of Municipal Solid Waste at Bandwari Landfill Site for 1 Year.
Corrosion Inhibitor for Oil and Gas Lines in Presence of H2S (ONGC) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6538928 Dated : 05-08-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 374000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 24 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/9 Beneficiary : F & AO ONGC LTD, CENTRAL PROCUREMENT DEPARTMENT ( CMPG-Chemical) 8th Floor, Core-3 & Core-4, SCOPE MINAR, Laxmi Nagar, East Delhi, Delhi-110092 (Oil And Natural Gas Corporation Limited) Splitting
Installation of 3 nos Solar street light in front of (i)Abdul Sabur house(ii)Assamtala Grevence(iii)Sadekul house under Saiyadpur GP, Scheme ID - APAS/01/042/9/0006, Year - 2025-26.
Installation of Submersible Pump with Tank in front of Paulus house at Bejpukur, Bhabanipur Bejpukur (I) Sansad under Saiyadpur Gram Panchayat. AAP. NO. - 20 (2025-26) , Activity Code- 113443696 (2025-26),
Construction of Cement Nala Bandh With Deepening At Bhalegaon Tal.Mehkar Dist Buldhana PG 25/03/08 Gat No 1/1 and 1/2
Construction of Drain from Mistar house towards Arif house under Saiyadpur GP, Scheme ID - APAS/01/042/9/0005, Year - 2025-26.
3 nos Bamboo Pilling from (i)Rajesh Ali house to Latifur house(ii)Nowsad house to Abdul Latif house(iii)Nurul islam house to Masiur house under Saiyadpur GP, Scheme ID - APAS/01/042/9/0004, Year - 2025-26.
Bamboo Piling at Chopa Arjunban pond side under Saiyadpur GP, Scheme ID - APAS/01/042/21/0003, Year - 2025-26.
Construction of CC road from (i)Ganesh Rajbanshi to Khogendranath Das(ii)Amjad Ali to Joynal Abedin house at Nilbari and Moddhopara under Saiyadpur GP, Scheme ID - APAS/01/042/8/0003, Year - 2025-26.
Installation of 12 nos Led street light in front house of Akramul,Enamul,Martuja,Munsur,Abdur Rahaman,Jakir,Sahebul,Nur Alam,APJ Kalam model School,Sidhu,Masud,Jiyaur under Saiyadpur GP, Scheme ID - APAS/01/042/9/0007, Year - 2025-26.
Inst. of 19 nos Led street light Hanifur,Latifur,Rajesh,Aktar,Khadimul,Nejarul,yusuf,Mafijul,Mirhossain,Arif,Munna,Sahidul,Mannan,Abdul Kader,Mainuddin,Madrasa Maminur,Nowaj,Masud Karim,Hiramul, Scheme ID - APAS/01/042/9/0008, Year - 2025-26.
Installation of 4 nos solar light in front of (i)Sekendar Ali(ii)Rejaul(iii)Nurul Islam(iv)Jamiruddin at Balidakuri Uttar para Under Saiyadpur GP, Scheme ID - APAS/01/042/6/0003, Year - 2025-26.
Installation of 4 nos Solar light in front house of (i)Sumos(ii)Makhan(iii)Binod(iv)Sailesh under Saiyadpur GP, Scheme ID - APAS/01/042/21/0005, Year - 2025-26.
Installation of 10 nos Solar Street light in front Khademul,Monjur alam,Jobaidur,Budhar,Mohobul Alam,Moshirul,Frjon Ali,Mohidur Rahaman,Kabiluddin,Bishuya Sekh under Saiyadpur GP, Scheme ID - APAS/01/042/10/0004, Year - 2025-26.
Installation of 4 nos Solar light in front of (i)Mostak hossain pukurpar(ii)Golam Faruk(iii)Abdus Sattar pukurpar(iv)Jamsed Ali house at Baildakuri Under Saiyadpur GP, Scheme ID - APAS/01/042/6/0004, Year - 2025-26.
Construction of retaining wall near Ashok Shivaji Ghadekar house at Awantinagar in V.P. Usgao Ganjem in Valpoi Constituency.
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6805963 Dated : 18-10-2025 Bid Document 1/8 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 90 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Providing Electrification in Sec-2 Faridabad. Supply and Erection of PCC pole, ACSR conductor, 200 KVA transformer and all other works contingent thereto. (Including 6 Year defect liability for transformer and 3 year for other electrical item, free o
TMEIC IEGT STACK
Procurement of 23nos. of panels(AC panel for 230KV SS 220V DC Distribution panel)
BS ROAD FROM CHIMANTA DAS HOUSE TOWORDS DIPUL DAS HOUSE AT DOLGRAM SANSAD UNDER BAGICHAPUR GRAM PANCHAYAT, ID- 91039228 (FY-2024-25)
Procurement of AC Panels for 110KV SS
PROVIDING AND FIXING INTERLOCKING PAVER BLOCK IN SURROUNDING AREA OF SHIV SHRUSTHI BUILDING AT ADARSH PARK IN W. NO.1 BHIWANDI
PROVIDING AND FIXING CHEAQURED TILES AT SURROUNDING NEAR BNCMC GOPAL KATAWLE GYM AT KOMBADPADA IN W. NO.1 BHIWANDI
PROPOSED CONSTRUCTION OF C. C. GUTTER AND DRAINAGE LINE AT SAMBRE CHAWL AT PS NO.1 BNCMC AREA MLA FUND 2025-26
Multipara Monitor - Low End (Q2), Anaesthesia Workstation (V2) (Q2) (3 (3 ))
ULTRASONIC GENERATOR FOR RESORBABLE PLATING SYSTEM (PAC ONLY)
Engagement of Agency for Demolishing Unauthorized Structure and Dilapidated Building of VVCMC and Disposal of Waste
Outsourcing at Government Rest House Building at Naigaon, Tq. Naigaon Dist. Nanded