Loading…
Loading…
367 results • Latest
Recovery and Reconstruction of Garukhunda to Notun Garukhunda Road under NDRF (PDNA-2022) for the year 2025 26
SUPPLY AND INSTALLATION OF SEED PROCESSING PLANT
Resectioning and Regrading of the Kollong River from Namgaon to Misa Centre for augmentation of Flow Capacity (Phase-I). Pk 2
LT WT BULLETPROOF JACKET AND BULLETPROOF HELMET (NIJ LEVEL III)
MMPPNA_RIDF_XXXI_25_26_42 Construction of Road from (1) Batamari Rampur Satra Road (Batamari to Rampur), (2) Boguriguri Batamari (Nagaon Dhing road to Haidubi) (Baguriguri to Batamari) (from Ch. 0.00 m to 1150.00 m), (3) Dhupaguri Dhacaibasti PMGSY r
MMPPNA_RIDF_XXXI_25_26_122 Construction of Road from (1) Pam Kalidingia Road to Garajan Kalidingia Road via Maheripar, (2) Udmari Alitangani Road to Mahguri Bagariguri Road , (3) Rowmari Khewaghat Beltoli PWD Road to Borpeta Tiniali via Sonai River B
Single Use Sterile Rubber Surgical Gloves Conforming to IS 13422 (Q2), Single Use Medical Examination Gloves Conforming to IS 15354 (Part 1) (Q2) (3 (3 ))
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Construction of Chain-linked Fencing with 3 strand barbed wire to be filled on pre-cast RCC pillars
Protection of B/Dyke at upstream of Muwamari butting point from the erosion of river Brahmaputra (Recast).
MMPPNA_RIDF_XXXI_25_26_43 Construction of Road from (1) Kachakhaiti to Saru Radha ati (from Ch. 0.00 m to 1225.00 m), (2) NB Road to Athgaon Chapori (Ch. 1370.00m to. Ch. 2370.00m), (2) Shalmarabori Bane Bihar Road (from Ch.0.00 m TO Ch. 1000.00 m) u
Conservation, Restoration and Rejuvenation works of the Bhatiakhali Beel of Nagaon District under Assam SWIFT Project
Conservation, Restoration and Rejuvenation works of the Sara Beel of Nagaon District under Assam SWIFT Project
Smart Forest Sticks for Protection against Wild animal Attacks
MMUPPNA_RIDF_XXXI_25_26_43 Improvement of Road from Major Ati Chariiali to Teliapatty Chariali from Ch.0.00m to 1155.00m including RCC Drain with widening of road from 0.00m to 750.00m up to Pani Ram Bora Road under Mukhya Mantrir Unnata Pakipath N
Conservation, Restoration and Rejuvenation works of the Tihulia Beel of Morigaon District under Assam SWIFT Project
Conservation, Restoration and Rejuvenation works of the Na-Kalong Beel of Nagaon District under Assam SWIFT Project
Conservation, Restoration and Rejuvenation works of the Chola Mikirbheta Beel of Nagaon District under Assam SWIFT Project
Supply of 132kV CT, 132kV PT, 132kV LA, 33kV VCB, 33kV CT, 33kV LA for Sub-Stations under Central Assam Region, AEGCL
Supply of Disc Insulators against Line Maintenance work under Central Assam Region AEGCL
Periodic Renewal of (i) Kuhumtoli NH 37Road (Constructed under PMGSY Package No. AS1924) (ii) Bhoridhowa - DhonekhuwaRoad (Constructed under PMGSY Package No. AS19146) For the year 2025-26, Nagaon District
Periodic Renewal of (i) Dhanekhowa - KuhimariRoad (Constructed under PMGSY Package No. AS19145) (ii) Senchowa - PubthoriaroadRoad (Constructed under PMGSY Package No. AS19137) For the year 2025-26, Nagaon District
Development, Operation and Management Contract for running the Prashaanti Tourist Lodge, Nagaon (New Building)
Goods Transport Service – Per Trip based Service - Textile Goods; Closed Body LCV Truck; 19 FT LCV
Development of other Wildlife Areas under Nagaon Division Under the Scheme SOPD
SOPD_G_25_26_65 Construction of connecting roads (i) Niz chilabandha road, (ii) Road at Mouchanda Pathar, (iii)Emergency escape road at Mouchanda Pathar via paddy field connecting Niz chilabandha road and Parking area
STBR/SOPD G/Nagaon-Batadrava-04/11 Construction of road (1) Paniram Bora Road (M.G. Road to Lawkhowa Road) , (2) Teliagaon to Solmari Road (Teliagaon to Khatuwal) (from Ch.0.00 m to 200.00m ) , (3) Sankardev Path, Morikolong , (4) Old NH 37 at Khut
Blanket For CAPFs (V2) (Q3) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 426 Lakh (s)
De Siltation of Water Bodies under Gaja Mitra Scheme
Construction of Check Dams under Gaja Mitra Scheme
Construction of Tongi Ghor
Construction of New PHC at Bamuni MPHC in NAGAON District under XV-FC Health Grant under NHM, Assam.
Package-39 Construction of 100 Secondary Schools in 35 Districts of Assam under RIDF-XXXI (2025-26) for Dekargaon HS School under Sonitpur DTBD
MMPPNA_RIDF_XXXI_25_26_80 Construction of (1) Road to Bamuni Budhbaria Bazar, Bamuni Upperdanga Basti, Missamukhpam to Kalimandir and Millenium Garden Road, (2) road from Haatbagan to Nijori , (3) Road at Road at 1No. Bamuni Gaon Gayari Chuburi, Hati
Transmission line Surge arrestor
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
ESTABLISHMENT AND COMMISSIONING OF MRF AND WASTE TO COMPOST PLANT IN DHING TOWN
Construction of Nam Doomdoomia PWSS at Dhing Town
Personal Fall Arrest System-Full Body Harness Conformingto IS3521 (Part1) (Q3)
Package-32 Construction of 100 Secondary Schools in 35 Districts of Assam under RIDF-XXXI (2025-26) for Jakhalabandha HS School under Nagaon DTBD
Construction of Smassan PWSS at ward no.8