Laying of CC Road from venkataiah Teacher house to Shekar house and at various places in Rahmath Nagar in Division No.22 in Nalgonda Municipal Corporation
Laying of CC Road patches from kashamalla srinu house to duppalapalli main road , javid house to duppalapalli main road in chaitanya nagar and around the lepracy hospital. laying of water pipe line from andra mallaiah house to waddera colony in akkalai gudem and drilling of bore well at louis nagar, chaitanya nagar, akkalaigudem in Division No.08 in Nalgonda Municipal Corporation.
Laying of CC Road,CC patches and Construction of CC Drain at anand nagar and apjal nagar in Division No.44 in Nalgonda Municipal Corporation.
Construction of CC drain from Dosapati Srinivas (H) to Komati Yadagiri (H) at Shivajinagar at Division No. 48 in Nalgonda Municipal Corporation
Consruction of CC drain and slab culvert from paila madhusudan reddy house to pagilla narsimha house in raghavendra colony and ramalayam back side at infront of nagilla anjaiah house in Division No.36 in Nalgonda Municipal Corporation.
Construction of cc drain from Orsupati Krishnarao house line at srinivasa colony, RCC Slab from Gamalla sayamma house to Appanaboina veeraiah house and cc drain from srinu house to venkateshwara apartment in Division No.41 in Nalgonda Municipal Corporation.
Development of varoius parks in Division No. 37 in Nalgonda Municipal Corporation
Laying of CC Road, CC patches and Construction of CC Drain from thagulla narsimha house to gourayya house, sri krishna gudi to vishveshvara house , Rajalingam setu house to police ushayya house kuncham vijay house to gollaguda main raod in Division No.42 in Nalgonda Municipal Corporation.
Construction of CC drain at Ganeshnagar, Ravindranagar and Shivajinagar at Division No. 38 in Nalgonda Municipal Corporation
Laying of CC Road from Donda Lakshmaiah (H) to Punna Bikshamaiah (H) at Padmanagar at Division No. 35 in Nalgonda Municipal Corporation
Construction of storm water drain and RCC slab at SLN Swamy Colony and laying of CC Road at Division No. 32 in Nalgonda Municipal Coropration
Laying of CC Road from Industrial area Jella Ganesh (H) to MD. Inayath (H) Savithramma (H) to Srinivas (H) at Division No. 17 in Nalgonda Municipal Corporation
Laying of CC Road from Meerbagh colony Raheem (H) 6-2-921/2 to M. Anthony Teja (H) 6-2-925/2 at Division No. 33 in Nalgonda Municipal Corporation
Laying of CC Road from Bandaru Garden Road to Lakshmi Nagar Road via MRO Krishnaiah (H) and Venkateshwara colony Road No. 3 to Bandaru Garden via Regatte Mahender Reddy (H) at Division No. 34 in Nalgonda Municipal Corporation
Laying of cc road and cc drain from MD. Arif house to main road at Panjesha , cc drain/slab in MD.Rajjabelli house line and CC road in Anil house line at Panjesha in Division No.27 in Nalgonda Municipal Corporation.
Laying of CC Road and RCC Slab culvert from Samudrala venkateshwarlu house to Ravula Mallamma house , cc road from Bathula Anjaiah house to Mukkala venkanna house, cc road and RCC Slab from Vidya Sagar house to Ramalayam, cc road from Savatla to Satyanarayana house and cc road and cc drain from kathula prem house to Alli subash house at Gollaguda in Division No.20 in Nalgonda Municipal Corporation.
Laying of CC Road from Kanhcanapally Ravi house to Badri Narayana house at Sri Nagar colony and at various places in Division No.19 in Nalgonda Municipal Corporation
Supply and delivery of stable bleaching powder for maintenance of water supply under MGF in Nalgonda Municipal Corporation
Reconstruction of 3V of 1.0m Dia HP Culvert at Km 6/2-4 including formation of approaches on PWD road to Marriguda via Saireddyguda by HMP in Nalgonda District
Construction of Protection Wall for Irrigation Division No.9 Office building(Including 2 No of Sub-Divisions) at Chinthapally (V and M) ,Nalgonda (D).
AM to Roads in Nakrekal Section Package I for the year 2026-27 in Nalgonda District
AM to Roads of Kattangur Section Package 2 for the year 2026-27 in Nalgonda District
AM to Roads in Narketpally Section Package 1 for the year 2026-27 in Nalgonda District
Supply of Integrated Audio System
Additional Remedial Measures on Akkampally Balancing Reservoir D/S Earth bund From Km. 1.725 to Km.1.950 of AMR SLBC Project
Construction of Regional Office Building at TGSWC Nalgonda-2, Nalgonda (M), Nalgonda District
Deputation of manpower for assessment at Yadadri Site for EPDB flashover.
Facility Management Services - LumpSum Based - Commercial; Housekeeping; Consumables to be provided by buyer
TGGENCO-YTPS-Up Keeping and Maintenance of BOP Switch Gear-I, Compressor Building- I, DG Building-I, ETP, Ammonia Storage Plant, Booster Pump House at Yadadri Thermal Power Station at Veerlapalem(V), Dameracherla(M) in Nalgonda district for the period from actual date of commencement of work to 31.03.2027
TGGENCO-YTPS (5x800 MW) - Up keeping and maintenance of Stage II Ash Handling Structures including Ash Recovery System in Dyke area of Yadadri Thermal Power Station at Veerlapalem (v), Dameracherla(m) in Nalgonda District from the actual date of commencement of work to 31.03.2027 for FY 2026-27
TGGENCO-YTPS(5X800MW)-Providing ornamental plants and its structure for CCR-II (Stage-II) at EL 17.70 mts floor of TG building at (5x800MW) Yadadri Thermal Power Station, Veerlapalem(V), Dameracherla(M), Nalgonda Dist.
AM to Roads in Narketpally Section Package 2 for the year 2026-27 in Nalgonda District
Erection of new 33/11KV SS with connecting 33KV and 11KV lines along with civil works at Namapuram(V) in Ghattuppal (M) of Nalgonda Division in Nalgonda Circle
Supply and delivery of Chlorine Gas at filteration plant (Tank Thanda) for Maintenance of Water supply in Miryalaguda Municipality under Municipal General funds / 15th FC
STEEL CORD BELT, N N BELT
O and M of Electrical sub stations including Transformer Yards under the AKBR Segment works of MB FY 2026-27 - 33-11KV and 11KV sub stations with distribution Transformers at various pumping stations estimate cost Rs. 28.12 lakhs
Procurement of Alum / PAC to filtration plant for Maintenance of Water supply in Miryalaguda Municipality under Municipal General funds / 15th FC
Repairs and Restoration of bund of Kummaroni Vampukunta, Mohmadapur (V), Nampally Mandal, Nalgonda District.
Purchase of New Street lights in Town-II in Miryalaguda Municipality under Municipal General funds / 15th FC
CONSTRUCTION OF COMPOUND WALL TO STAS 9G) AITIPAMULA (V) IN KATTANGUR (M) OF NALGONDA DISTRICT
ER at Km 2/4-6, 4/6-8 on Ammanabole - Ramanjapur road in Nalgonda District by HMP
NSHES- O and M- CSDI- NSLCPH- Providing of external painting to the Rest House in NSLCPH
Operation and Maintenance-Emergency Repairs for removal of jungle, deposited earth and repairs to damaged pipe culvert on Edulacheruvu feeder channel Itukulapahad(V), Shaligowraram(M), Nalgonda (D) of Thungathurthy Constituency
MISCELLANEOUS REPAIR WORK FOR THREE BAYS OF STORAGE BUILDING AT SITE N FOR PGAD MOTOR STORAGE.
Purchase of New Street lights in Town-I in Miryalaguda Municipality under Municipal General funds / 15th FC
TGGENCO-YTPS(5X800 MW)-BE-IV-Rectification of tube leaks in Boiler-4,on call basis during emergency shutdown from the actual date of commencement of work to 31.03.2027 during the FY 2026-27
Providing Precast compound wall to open land of Munugode Road and Devarakonda Road Mamillaguda, Nalgonda District of TGHB lands under jurisdiction of SE/HC-I of Telangana Housing Board
Restoration of Parvatha Rao Tank, Devarakonda Village and Mandal, Nalgonda District.
Malathion 50% Emulsifiable Concentrates (V3) Conforming To IS 2567 (Q2) (3 (3 ))
Custom Bid for Services - Engaging services of Mechanical/Electrical/C&I for assisting in Erection activities of Unit 3 & 5 of Stage -II for meeting the milestones of Stage -II at 5 x800MW Yadadri Thermal Power Station for a period of 4 Months Similar Category Manpower Outsourcing Services - Fixed Remuneration