Loading…
Loading…
185 results • Latest
Development of new A site Retail Outlet RO for resitement at Duginavelly Village, Kattangur Mandal, Nalgonda District, Telangana under Secunderabad Divisional Office of TAPSO
Caustic Soda (V2) ISI Marked to IS 252 (Q2) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s)
AME of AMRSLBC Project camp colony, G.V.Gudem, Nalgonda for the year 2026-27
Repairs to Damage of Pressure Main Pipe line of L 16 Lift Scheme located at Ch.Km.66.100 on NSLBC at Dondavarigudem(V), Miryalguda(M).
Providing BT road connectivity to unconnected ST habitations and Improvement of road from i) Lavuri Thanda to Bandavath Thanda via Geri Thanda ii) Lavuri Thanda to Kondrapole iii) Janpahad Darga to RandB NAM Road in Nalgonda District
i) Extension of Control Room building at 132/6.6KV Sub-station for replacing overlapping cables by constructing new cable trenches to avoid major break downs in KDWSP Phase-I,II and III at Godakondla ii) Extension of Control Room building at 132/6.6KV Sub-station for replacing overlapping cables by constructing new cable trenches to avoid major break downs in KDWSP Phase-I,II and III at Kodandapur iii) Extension of Control Room building at 132/6.6KV Sub-station for replacing overlapping cables by constructing new cable trenches to avoid major break downs in KDWSP Phase-I,II and III at Nasarlapally under SD-I, Trans.Div.III, Sahebnagar
Conservancy services and Area Clearance services to Estate Area Nagarjunasagar
Conservancy and Area Clearance services to Shanthi Vanam, Yadgarpally
Repairs and Maintenance to Govt. SCDD BH Chandur (V and M) in Nalgonda District (6th call).
Repairs and Maintenance to Govt. SCDD BH Nampally (V and M) in Nalgonda District (6th call).
TGGENCO-YTPS(5x800MW)-Stage-1- Unit-1 Carrying out breakdown maintenance works of Air-preheaters and overhaul of Air-preheaters and its gearboxes in Unit-1 as and when required on an urgent on call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
Construction of Toilets for PWDs-2 and Transgenders -2 at District Court Complex, Nalgonda in Nalgonda District
Development of Palygrounds of Cricket and Volley Ball Court Sports Facilities at PM Shri ZPHS Peddavoora (V and M) in Nalgonda District
AM to Roads of Kanagal Section Package 2 for the year 2026-27 in Nalgonda District
AM to Hyderabad - Sagar road from km 55/0 to 77/0 for the year 2026-27 in Nalgonda District
TGGENCO-YTPS(5X800MW)-TE-II- Maintenance works carried out for CW, ACW, TGDMCW, SGDMCW in TM-II/Stage-I, YTPS in FY 2026-27 from actual date of commencement to 31.03.2027
TGGENCO- YTPS (5x800MW)-Stage-1-Unit-1 -Carrying out breakdown maintenance of ESP fields in Unit-1 as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1-Carrying out breakdown maintenance of PA, FD and ID Fans in Unit-I as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out preventive, routine maintenance and minor repair works of APH, PA Fans, FD Fans, ID Fans, ESPs, Ducts AND Gate areas of Boiler-I as and when required for the period from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Rectification of tube leaks in Boiler-1, on an urgent on-call basis during emergency shutdown from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement to 31.03.2027.
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Cleaning and Inspection of Oil Filters, Strainers, Control Valves and Oil Skids of TDBFPs and MDBFPs in TM-I/Stage-I, YTPS in FY 2026-27 from 01.04.2026 to 31.03.2027
AM to Rolads in Nampally Section Package 2 for the year 2026-27 in Nalgonda District
Supply, Installation and Commissioning of 9 Nos of V-notches, 2 Nos of Standard Measuring boxes, 2 Nos of Uplift Pressure Gauge Meters and 1 No of Open Pan Evaporimeter in the Galleries of Nagarjuna sagar Dam, Nalgonda District, Telangana State.( Reservation of work as ST communities)
AM to Chityala - Munugode road from km 0/0 - 14/0 in Narketpally Section for the year 2026-27 in Nalgonda District
AM to Suryapet - Bheemaram - Shettipalem road from km 6/0 to 28/0 for the year 2026-27 in Nalgonda District
AM to Munugode - Nampally road from km 1/5 - 12/0 for the year 2026-27 in Nalgonda District
AM to Roads of Nalgonda Section Package for the year 2026-27 in Nalgonda District
AM to Roads of Kattangur Section Package 3 for the year 2026-27 in Nalgonda District
Installation of Intercom Communication System in Dam Galleries and Elevators of Nagarjuna Sagar Dam, Nalgonda dist. Telangana(2nd call)
Development of Palygrounds of Cricket and Volley Ball Court Sports Facilities at PM Shri KGBV Kattangur (V) Kattangur (M) in Nalgonda District
AM to Roads in Chandur Section for the year 2026-27 in Nalgonda District
AM to Roads in Nampally Section package 1 for the year 2026-27 in Nalgonda District
Repairs to Pipe lines for Maintenance of Water supply in Miryalaguda Municipality under Municipal General funds / 15th FC
Development of Palygrounds of Cricket and Volley Ball Court Sports Facilities at PM Shri ZPHS Venkateshwara Nagar (V) Chinthapalle ( M) in Nalgonda District
Laying of RCC Screed Concrete over the roof slab of the existing damaged pump house building slabs including removing the existing damaged slab portion of pump Houses at Kodandapur, Nasarlapally and Godakondla under SD-I of Transmission Division III, Sahebnagar.
Manufacturing, Supply, Delivery, lowering, laying, jointing, testing and commissioning of 1600mm dia MS gravity main of KDWSP Phase-II Ring Main-II from Uppal Bus stop towards LB Nagar (PNo.SC28) to Police outpost Uppal X Road for facilitating the construction of flyover by MMC under KWS Monitoring section, SD-II, Transmission Division No.III, Sahebnagar
Construction of CC drain at various places in Gandhinagar and and erection of highmast light at Division No. 39 in Nalgonda Municipal Corporation
Renovation of Rythu Rest House ( Office ) at Sub Market Yard, Kondamallepally under AMC., Devarakonda of Nalgonda District. ( 2nd Call Tender )
ER at Km 8/4-6, 9/2-4 on Kattangur - Eduloor road in Nalgonda District by HMP
Aluminium Phosphide Formulation (V2) Conforming to IS 6438 (Q2) (3 (3 ))
Restoration and Repair works for damaged portion of bund of Patnamvarikunta, Auravani(V), Narketpally(M), Nalgonda(D)
Laying of Roof Slab and Raising of RCC Sidewalls for Air Valve Scour Valve Butterfly Valve and Anti vaccum Valve chambers in place of existing damaged roof slabs, and also raising of RCC sidewalls for the Valve chambers due to widening and laying of new road work by the R B Department on 2200 2375 mm Dia MS Pumping and Gravity Mains of KDWSP Phase I II III from Kodandapur to Sahebnagar under SD I Transmission Division III Sahebnagar.
Overhaul and Replacement of bearings for 3-phase LT motors of various ratings in Unit-4 of Stage-II of YTPS as and when required for the year 2026-27
Custom Bid for Services - Field Quality Assurance Engineer CIVIL Similar Category Manpower Outsourcing Services - Man-days based
Repairs and Replacement of Cross Regulator Shutters at Km 103.755 on High Level Canal of AMRSLBC Project Kattangur Mandal Nalgonda District
Repairs for OT sluice gates of Bajakunta at Bajakunta(V),Narketpally (M) ,Nalgonda Dist
Repairs and Replacement of Outfall Regulator at Km:115.125 of Aitipamula Balancing Reservoir on High Level Canal of AMRSLBC Project Kattangur Mandal Nalgonda District 2nd Call
Repairs for OT sluice of Peddha Cheruvu of Thondalvai Village,Narketpally Mandal.
TGGENCO-YTPS(5x800 MW)-Supply and fixing of Cubical partiotions in the offices of all floors of Service Building-I at Yadadri Thermal Power Station,Veerlapalem(V), Dameracharla(M), Nalgonda Dist.
Certain online arresting of Steam or feed water leakages from various High Pressure Lines and Valves glands while unit is in service as and when required from the date of commencement of work to 31.03.2027 in Unit 4 Boiler